| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$20,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 45,824 | CY |
$10.00 |
$22.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,398 | CY |
$30.00 |
$30.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$23,300.00 |
$135,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,761 | LF |
$3.00 |
$2.97 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 63 | LF |
$13.00 |
$20.18 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 33,468 | SY |
$3.00 |
$5.26 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 6.57 | AC |
$2,200.00 |
$744.44 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 6.57 | AC |
$1,500.00 |
$957.44 |
| 100 | 241 3100 |
MOWING | 13.14 | AC |
$225.00 |
$239.63 |
| 110 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,000.00 |
$4,500.00 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 4,896 | CY |
$50.00 |
$75.00 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 22,033 | SY |
$7.00 |
$14.00 |
| 140 | 310(B)5300 |
SUBGRADE, METHOD B | 5,052 | SY |
$3.00 |
$4.00 |
| 150 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 25,354 | SY |
$5.00 |
$5.00 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,436 | TON |
$40.00 |
$45.00 |
| 170 | 407(B)7300 |
TACK COAT | 528 | GAL |
$3.00 |
$3.20 |
| 180 | 408 8100 |
PRIME COAT | 10,650 | GAL |
$4.00 |
$1.00 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,015 | TON |
$130.00 |
$96.44 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 394 | TON |
$200.00 |
$119.58 |
| 210 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 57 | TON |
$250.00 |
$254.74 |
| 220 | 411(I)2000 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 19 | TON |
$250.00 |
$278.01 |
| 230 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,902 | SY |
$20.00 |
$45.00 |
| 240 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 12,040 | SY |
$30.00 |
$58.00 |
| 250 | 414(E)5600 |
FULL DEPTH P.C.C. PATCH (PLACEMENT) | 310 | SY |
$200.00 |
$200.00 |
| 260 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 3,952 | CY |
$175.00 |
$250.00 |
| 270 | 414(G)5810 |
(PL) P.C. CONCRETE FOR PAVEMENT, SPECIAL | 338 | CY |
$250.00 |
$300.00 |
| 280 | 501(G)1810 |
CLSM BACKFILL | 102 | CY |
$150.00 |
$260.00 |
| 290 | 504(E)5500 |
CONCRETE PARAPET | 660 | LF |
$150.00 |
$303.53 |
| 300 | 509(B)0300 |
CLASS A CONCRETE | 156.9 | CY |
$750.00 |
$702.90 |
| 310 | 509(D)0500 |
CLASS C CONCRETE | 11 | CY |
$900.00 |
$585.75 |
| 320 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 48,080 | LB |
$1.75 |
$1.66 |
| 330 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 459 | SY |
$5.00 |
$5.33 |
| 340 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 1,810 | LF |
$15.00 |
$28.00 |
| 350 | 610(A)5200 |
4" CONCRETE SIDEWALK | 138 | SY |
$45.00 |
$83.07 |
| 360 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 146 | SY |
$60.00 |
$93.72 |
| 370 | 611(G)0354 |
INLET (SMD-TYPE 2) | 2 | EA |
$3,300.00 |
$4,288.09 |
| 380 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 206 | LF |
$110.00 |
$152.00 |
| 390 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 322 | LF |
$22.00 |
$24.00 |
| 400 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 108 | LF |
$22.00 |
$24.00 |
| 410 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 426 | LF |
$13.00 |
$24.00 |
| 420 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 150 | LF |
$13.00 |
$24.00 |
| 430 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$4,000.00 |
| 440 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 5 | EA |
$800.00 |
$3,000.00 |
| 450 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$75,000.00 |
$365,000.00 |
| 460 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 21,484 | SY |
$10.00 |
$12.00 |
| 470 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,369 | SY |
$5.00 |
$12.00 |
| 480 | 619(B)6400 |
REMOVAL OF CURB | 1,307 | LF |
$5.00 |
$9.00 |
| 490 | 619(B)6416 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 622 | LF |
$10.00 |
$7.00 |
| 500 | 619(B)6464 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 142 | SY |
$10.00 |
$9.00 |
| 510 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 2,858 | LF |
$3.50 |
$1.12 |
| 520 | 413(C)4400 |
RUMBLE STRIP-METHOD PCC-CON | 3,485 | LF |
$5.50 |
$1.42 |
| 530 | 509(A)0200 |
CLASS AA CONCRETE | 53 | CY |
$700.00 |
$692.25 |
| 540 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 1,829 | LF |
$8.00 |
$15.98 |
| 550 | 628 7100 |
INSTALLATION OF CABLE BARRIER SYSTEM | 1,829 | LF |
$15.00 |
$21.30 |
| 560 | 628(B)7300 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,178 | LF |
$20.00 |
$79.88 |
| 570 | 628(C)7400 |
END ANCHORS | 4 | EA |
$15,000.00 |
$12,780.00 |
| 580 | 628(E)7600 |
CABLE BARRIER TENSION METER | 1 | EA |
$5,000.00 |
$11,182.50 |
| 590 | 628(F)7700 |
(PL)HIGH TENSION CABLE BARR. RE-TENSION | 3 | EA |
$500.00 |
$1,597.50 |
| 600 | 804(A)2200 |
STRUCTURAL CONCRETE | 25.84 | CY |
$650.00 |
$692.25 |
| 610 | 804(B)2300 |
REINFORCING STEEL | 3,604 | LB |
$1.50 |
$3.73 |
| 620 | 805(A)3236 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE | 1 | EA |
$4,500.00 |
$25,000.00 |
| 630 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 79 | EA |
$150.00 |
$452.63 |
| 640 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 48 | SF |
$25.00 |
$69.23 |
| 650 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,802.75 | SF |
$60.00 |
$78.81 |
| 660 | 851(A)2205 |
6"@15 GALV.STL.WD.FLANGE BM.POST | 500 | LF |
$40.00 |
$66.03 |
| 670 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 60 | LF |
$15.00 |
$15.98 |
| 680 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 380 | EA |
$60.00 |
$69.23 |
| 690 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 18,377 | LF |
$1.00 |
$1.81 |
| 700 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 5,291 | LF |
$2.50 |
$4.26 |
| 710 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 5,412 | LF |
$0.7500 |
$2.03 |
| 720 | 857(F)9720 |
PAVEMENT MARKING REMOVAL(WORDS) | 24 | EA |
$200.00 |
$692.25 |
| 730 | 871(A)2200 |
IMPACT ATTENUATOR | 2 | EA |
$25,000.00 |
$35,145.00 |
| 740 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 20,909 | LF |
$0.6000 |
$0.6300 |
| 750 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 20,909 | LF |
$0.6000 |
$2.39 |
| 760 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 1,760 | EA |
$0.7500 |
$0.6900 |
| 770 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 360 | SD |
$10.00 |
$70.00 |
| 780 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 80 | SD |
$50.00 |
$16.00 |
| 790 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 7,000 | LF |
$30.00 |
$60.00 |
| 800 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 7,162.5 | LF |
$10.00 |
$8.00 |
| 810 | 878(B)5300 |
MODULAR GLARE SCREEN (TEMPORARY) | 30,480 | SD |
$0.3000 |
$0.2100 |
| 820 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 620 | SD |
$10.00 |
$15.98 |
| 830 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,508 | SD |
$0.7500 |
$1.10 |
| 840 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,708 | SD |
$1.50 |
$1.10 |
| 850 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,584 | SD |
$1.75 |
$1.10 |
| 860 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,420 | SD |
$1.00 |
$3.00 |
| 870 | 880(C)6420 |
WING BARRICADES | 240 | SD |
$0.9000 |
$3.00 |
| 880 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 8,280 | SD |
$0.3500 |
$0.5300 |
| 890 | 880(F)6700 |
DRUMS | 22,110 | SD |
$0.3000 |
$1.00 |
| 900 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 2,000 | HOUR |
$77.00 |
$77.00 |
| 910 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$20.00 |
$70.00 |
| 920 | 506(A)7200 |
STRUCTURAL STEEL | 5,520 | LB |
$3.00 |
$2.88 |
| 930 | 542 9111 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 6 | EA |
$10,000.00 |
$26,625.00 |
| 940 | 542 9121 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE B) | 1 | EA |
$15,000.00 |
$26,625.00 |
| 950 | 650(A)8100 |
TOLL EQUIPMENT BUILDING FOUNDATION | 1 | EA |
$12,000.00 |
$21,246.75 |
| 960 | 650(A)8110 |
GENERATOR PAD AND ENCLOSURE | 3 | EA |
$45,000.00 |
$84,188.25 |
| 970 | 650(B)8200 |
TOLL EQUIPMENT BUILDING INSTALLATION | 1 | EA |
$15,000.00 |
$13,312.50 |
| 980 | 650(C)8300 |
ELECTRICAL GENERATOR | 3 | EA |
$50,000.00 |
$50,587.50 |
| 990 | 650(C)8310 |
ELECTRICAL EQUIPMENT | 1 | LSUM |
$57,000.00 |
$163,903.50 |
| 1,000 | 650(C)8320 |
PROPANE TANK WITH PAD | 3 | EA |
$22,500.00 |
$37,275.00 |
| 1,010 | 802(B)0308 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 3,000 | LF |
$25.00 |
$20.24 |
| 1,020 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 750 | LF |
$35.00 |
$43.13 |
| 1,030 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 4,390 | LF |
$12.00 |
$33.02 |
| 1,040 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 210 | LF |
$16.00 |
$54.32 |
| 1,050 | 802(B)0340 |
4" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 110 | LF |
$55.00 |
$59.64 |
| 1,060 | 803(A)1220 |
PULL BOX(SIZE II) | 52 | EA |
$2,000.00 |
$2,183.25 |
| 1,070 | 804(A)2200 |
STRUCTURAL CONCRETE | 148.8 | CY |
$2,000.00 |
$1,459.05 |
| 1,080 | 804(B)2300 |
REINFORCING STEEL | 7,220 | LB |
$2.00 |
$3.41 |
| 1,090 | 805(D)3504 |
(PL)REMOVE & RESET LIGHT POLE | 5 | EA |
$5,200.00 |
$13,269.90 |
| 1,100 | 806(C)4512 |
40' MTG & 10' HLMA(G.STL.) | 1 | EA |
$4,600.00 |
$21,427.80 |
| 1,110 | 806(C)4516 |
40' MTG & 12' HLMA(G.STL.) | 2 | EA |
$4,600.00 |
$18,861.15 |
| 1,120 | 809(A)7200 |
ROADWAY LUMINAIRE | 2 | EA |
$1,000.00 |
$2,566.65 |
| 1,130 | 811 9105 |
1/C NO.1 ELECT.COND. | 5,930 | LF |
$2.50 |
$7.24 |
| 1,140 | 811 9115 |
1/C NO.4 ELECT.COND. | 3,650 | LF |
$2.00 |
$5.64 |
| 1,150 | 811 9120 |
1/C NO.6 ELECT.COND. | 470 | LF |
$2.00 |
$3.20 |
| 1,160 | 811 9125 |
1/C NO.8 ELECT.COND. | 1,090 | LF |
$3.00 |
$2.66 |
| 1,170 | 824(C)7400 |
(SP)CABINET | 6 | EA |
$10,000.00 |
$25,107.38 |
| 1,180 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$83,000.00 |
$165,000.00 |
| 1,190 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$15,000.00 |
| 1,200 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$295,000.00 |
$454,123.00 |