| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$10,000.00 |
$10,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 36,208 | CY |
$10.00 |
$13.00 |
$13.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 4,930 | CY |
$17.00 |
$16.00 |
$16.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$80,000.00 |
$80,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 10,050 | LF |
$2.50 |
$3.79 |
$3.84 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 603 | LF |
$11.50 |
$16.85 |
$17.07 |
| 70 | 229 6100 |
DITCH LINER PROTECTION | 1,600 | LF |
$5.00 |
$4.98 |
$5.02 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 105,490 | SY |
$4.50 |
$5.55 |
$5.62 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 2.34 | AC |
$1,700.00 |
$4,985.00 |
$5,050.66 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 2.34 | AC |
$3,500.00 |
$4,925.00 |
$4,989.87 |
| 110 | 241 3100 |
MOWING | 48.29 | AC |
$310.00 |
$415.00 |
$420.47 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 34,184 | SY |
$8.00 |
$12.25 |
$15.26 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 270 | TON |
$55.00 |
$110.00 |
$110.00 |
| 140 | 407(B)7300 |
TACK COAT | 40,333 | GAL |
$5.00 |
$3.50 |
$5.00 |
| 150 | 408 8100 |
PRIME COAT | 17,519 | GAL |
$5.00 |
$5.00 |
$4.00 |
| 160 | 409(A)9200 |
FABRIC REINFORCEMENT | 12,292 | SY |
$4.00 |
$5.00 |
$5.40 |
| 170 | 409(B)9300 |
BITUMINOUS BINDER | 2,459 | GAL |
$6.50 |
$7.00 |
$9.00 |
| 180 | 411(B)1300 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 19,437 | TON |
$120.00 |
$150.00 |
$165.00 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 28,538 | TON |
$120.00 |
$145.00 |
$160.00 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12,567 | TON |
$140.00 |
$140.00 |
$166.00 |
| 210 | 411(E)1620 |
SUPERPAVE, TYPE S6(PG 64-22 OK) | 2,690 | TON |
$150.00 |
$165.00 |
$192.00 |
| 220 | 411(F)1700 |
STONE MATRIX ASPHALT | 7,444 | TON |
$150.00 |
$205.00 |
$240.00 |
| 230 | 412 3100 |
COLD MILLING PAVEMENT | 4,400 | SY |
$6.00 |
$4.00 |
$15.50 |
| 240 | 509(D)0500 |
CLASS C CONCRETE | 299 | CY |
$500.00 |
$575.00 |
$575.00 |
| 250 | 613(A)5220 |
30" R.C.PIPE CLASS III | 144 | LF |
$100.00 |
$160.00 |
$160.00 |
| 260 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 504 | LF |
$40.00 |
$90.00 |
$90.00 |
| 270 | 613(M)6988 |
TYPE CC4 CULVERT END TREATMENT | 2 | EA |
$3,900.00 |
$5,000.00 |
$7,000.00 |
| 280 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 14 | EA |
$2,900.00 |
$4,000.00 |
$4,000.00 |
| 290 | 613(S)7700 |
STANDARD BEDDING MATERIAL, CLASS B | 59 | CY |
$115.00 |
$154.00 |
$154.00 |
| 300 | 613(V)8000 |
TRENCH EXCAVATION | 92 | CY |
$55.00 |
$30.00 |
$30.00 |
| 310 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$50,000.00 |
$50,000.00 |
| 320 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 15,709 | SY |
$8.00 |
$10.00 |
$12.25 |
| 330 | 619(B)6508 |
REMOVE AND RESET CATTLE GUARD | 1 | EA |
$2,000.00 |
$7,500.00 |
$7,500.00 |
| 340 | 619(C)6600 |
SAWING PAVEMENT | 39,832 | LF |
$4.00 |
$5.00 |
$3.60 |
| 350 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 963 | LF |
$30.00 |
$26.00 |
$33.08 |
| 360 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$3,000.00 |
$4,550.00 |
$3,247.48 |
| 370 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,500.00 |
$4,200.00 |
$3,323.23 |
| 380 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 25,220 | LF |
$10.00 |
$8.00 |
$6.40 |
| 390 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$150.00 |
$250.00 |
$315.00 |
| 400 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$40.00 |
$65.00 |
$250.00 |
| 410 | 629(E)7600 |
MAILBOX | 2 | EA |
$55.00 |
$45.00 |
$250.00 |
| 420 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 473 | CY |
$15.00 |
$45.00 |
$45.00 |
| 430 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 116 | CY |
$35.00 |
$50.00 |
$50.00 |
| 440 | 509(A)0210 |
CLASS AA CONCRETE | 578.4 | CY |
$800.00 |
$650.00 |
$650.00 |
| 450 | 511(A)2210 |
REINFORCING STEEL | 86,600 | LB |
$1.50 |
$1.55 |
$1.55 |
| 460 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$75,000.00 |
$75,000.00 |
| 470 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 1,210 | CY |
$15.00 |
$45.00 |
$45.00 |
| 480 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 82 | CY |
$35.00 |
$50.00 |
$50.00 |
| 490 | 509(A)0210 |
CLASS AA CONCRETE | 173.7 | CY |
$800.00 |
$695.00 |
$695.00 |
| 500 | 511(A)2210 |
REINFORCING STEEL | 26,900 | LB |
$1.50 |
$1.55 |
$1.55 |
| 510 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$35,000.00 |
$35,000.00 |
| 520 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 6,037.02 | LF |
$300.00 |
$425.00 |
$425.00 |
| 530 | 504(A)5200 |
APPROACH SLAB | 306.8 | SY |
$300.00 |
$325.00 |
$325.00 |
| 540 | 504(B)5300 |
SAW-CUT GROOVING | 5,130.8 | SY |
$5.50 |
$4.85 |
$4.85 |
| 550 | 504(D)5420 |
CONCRETE RAIL (TR4) | 2,143 | LF |
$110.00 |
$125.00 |
$125.00 |
| 560 | 506(A)7200 |
STRUCTURAL STEEL | 5,910 | LB |
$6.00 |
$7.50 |
$7.50 |
| 570 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 36 | EA |
$3,000.00 |
$2,850.00 |
$2,850.00 |
| 580 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 96 | EA |
$3,000.00 |
$2,850.00 |
$2,850.00 |
| 590 | 509(A)0210 |
CLASS AA CONCRETE | 1,324 | CY |
$800.00 |
$900.00 |
$900.00 |
| 600 | 509(B)0320 |
CLASS A CONCRETE | 24.4 | CY |
$1,500.00 |
$3,100.00 |
$3,100.00 |
| 610 | 509(D)0510 |
CLASS C CONCRETE | 14.8 | CY |
$800.00 |
$985.00 |
$985.00 |
| 620 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 437,150 | LB |
$1.75 |
$1.85 |
$1.85 |
| 630 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 4,574 | SY |
$6.00 |
$4.50 |
$4.50 |
| 640 | 518(B)0300 |
SEALED EXPANSION JOINTS | 138 | LF |
$425.00 |
$485.00 |
$485.00 |
| 650 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 92.4 | LF |
$35.00 |
$38.00 |
$40.00 |
| 660 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2.4 | GAL |
$125.00 |
$230.00 |
$60.00 |
| 670 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 79.6 | SY |
$900.00 |
$915.00 |
$1,422.75 |
| 680 | 523(A)3200 |
SEALER CRACK PREPARATION | 4,434 | LF |
$7.00 |
$3.00 |
$3.00 |
| 690 | 523(B)3300 |
SEALER RESIN | 35.6 | GAL |
$90.00 |
$120.00 |
$120.00 |
| 700 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$250,000.00 |
$260,000.00 |
$250,000.00 |
| 710 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$210.00 |
$300.00 |
$176.77 |
| 720 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 95.25 | SF |
$50.00 |
$60.00 |
$30.30 |
| 730 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 188.5 | LF |
$16.00 |
$15.00 |
$20.20 |
| 740 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 11 | EA |
$30.00 |
$45.00 |
$35.35 |
| 750 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 60,975 | LF |
$0.5000 |
$0.8900 |
$0.6100 |
| 760 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 4 | EA |
$200.00 |
$200.00 |
$505.05 |
| 770 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 3,300 | LF |
$5.00 |
$13.80 |
$2.27 |
| 780 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 330 | SD |
$225.00 |
$112.00 |
$141.41 |
| 790 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 5,328 | EA |
$0.8500 |
$1.00 |
$1.01 |
| 800 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,880 | SD |
$15.00 |
$8.00 |
$8.08 |
| 810 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 9,410 | LF |
$25.00 |
$27.85 |
$30.30 |
| 820 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 13,780 | LF |
$5.00 |
$2.25 |
$8.08 |
| 830 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,344 | SD |
$0.9000 |
$0.0200 |
$0.5100 |
| 840 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 898 | SD |
$2.00 |
$8.00 |
$0.5100 |
| 850 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,390 | SD |
$3.50 |
$8.00 |
$0.5100 |
| 860 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 18,780 | SD |
$2.30 |
$0.0200 |
$0.4000 |
| 870 | 880(G)6805 |
CHANNELIZER CONES | 17,940 | SD |
$2.50 |
$0.7500 |
$0.3500 |
| 880 | 880(I)7000 |
FLAGGER | 90 | SD |
$110.00 |
$100.00 |
$350.00 |
| 890 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,796 | SD |
$40.00 |
$8.00 |
$12.12 |
| 900 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$125,000.00 |
$120,500.00 |
$133,200.00 |
| 910 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$6,000.00 |
| 920 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$760,000.00 |
$765,000.00 |
|