| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$19,000.00 |
$5,000.00 |
$25,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 170 | CY |
$20.00 |
$52.00 |
$25.00 |
$20.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$12,500.00 |
$5,000.00 |
$15,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,444 | LF |
$3.00 |
$4.98 |
$4.50 |
$2.50 |
| 50 | 221(G)2800 |
TEMPORARY FIBER LOG | 1,000 | LF |
$3.50 |
$9.98 |
$8.50 |
$8.00 |
| 60 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 9 | EA |
$375.00 |
$495.00 |
$450.00 |
$175.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 2,541 | SY |
$5.00 |
$7.49 |
$7.50 |
$3.50 |
| 80 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 631 | TON |
$38.00 |
$74.00 |
$50.00 |
$48.00 |
| 90 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 15 | TON |
$150.00 |
$300.00 |
$250.00 |
$210.00 |
| 100 | 509(D)0500 |
CLASS C CONCRETE | 8 | CY |
$600.00 |
$1,537.00 |
$650.00 |
$800.00 |
| 110 | 609(B)4375 |
2'-8" COMB.CRB.& GUT.(8" BARRIER) | 866 | LF |
$25.00 |
$59.19 |
$35.00 |
$45.00 |
| 120 | 610(A)5200 |
4" CONCRETE SIDEWALK | 3,637 | SY |
$60.00 |
$59.00 |
$70.00 |
$70.00 |
| 130 | 610(A)5220 |
6" CONCRETE SIDEWALK | 1,068 | SY |
$66.00 |
$77.30 |
$85.00 |
$90.00 |
| 140 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 477 | SY |
$75.00 |
$81.93 |
$85.00 |
$90.00 |
| 150 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 798 | SF |
$32.00 |
$40.00 |
$35.00 |
$50.00 |
| 160 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$2,500.00 |
$5,000.00 |
$25,000.00 |
| 170 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 810 | LF |
$10.00 |
$6.20 |
$7.00 |
$10.00 |
| 180 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 79 | SY |
$9.00 |
$16.25 |
$25.00 |
$10.00 |
| 190 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 1,032 | SY |
$12.50 |
$10.18 |
$20.00 |
$10.00 |
| 200 | 619(B)6404 |
REMOVAL OF SIDEWALK | 1,768 | SY |
$11.00 |
$8.43 |
$15.00 |
$10.00 |
| 210 | 619(C)6600 |
SAWING PAVEMENT | 2,776 | LF |
$3.50 |
$3.50 |
$8.00 |
$3.50 |
| 220 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 120 | SD |
$11.75 |
$5.00 |
$5.00 |
$10.00 |
| 230 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 120 | SD |
$5.10 |
$1.00 |
$1.00 |
$2.00 |
| 240 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,400 | SD |
$0.4500 |
$1.00 |
$1.00 |
$2.00 |
| 250 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$0.6000 |
$2.00 |
$2.00 |
$4.00 |
| 260 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$1.60 |
$2.00 |
$2.00 |
$4.00 |
| 270 | 880(C)6405 |
CONSTRUCTION BARRICADES(TYPE II) | 720 | SD |
$1.07 |
$1.00 |
$1.00 |
$2.00 |
| 280 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 480 | SD |
$0.8500 |
$1.00 |
$1.00 |
$2.00 |
| 290 | 880(C)6420 |
WING BARRICADES | 480 | SD |
$2.00 |
$1.00 |
$1.00 |
$2.00 |
| 300 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,160 | SD |
$0.3000 |
$0.5000 |
$0.5000 |
$1.00 |
| 310 | 880(F)6700 |
DRUMS | 1,200 | SD |
$0.2000 |
$1.00 |
$1.00 |
$2.00 |
| 320 | 880(G)6805 |
CHANNELIZER CONES | 1,920 | SD |
$0.3000 |
$1.00 |
$1.00 |
$2.00 |
| 330 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 296 | SD |
$9.55 |
$20.00 |
$20.00 |
$40.00 |
| 340 | 890 1100 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$1,000.00 |
$5,000.00 |
$5,000.00 |
$15,000.00 |
| 350 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 12 | EA |
$232.95 |
$100.00 |
$200.00 |
$120.00 |
| 360 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 342 | SF |
$25.35 |
$28.00 |
$30.00 |
$32.00 |
| 370 | 851(C)2415 |
2" SQUARE TUBE POST | 989 | LF |
$9.25 |
$15.00 |
$20.00 |
$18.00 |
| 380 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 7,490 | LF |
$0.5500 |
$1.25 |
$1.50 |
$1.50 |
| 390 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 2,041 | LF |
$8.70 |
$6.00 |
$6.50 |
$7.20 |
| 400 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 3 | EA |
$166.15 |
$200.00 |
$250.00 |
$240.00 |
| 410 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 300 | LF |
$0.2500 |
$0.5000 |
$1.00 |
$0.6000 |
| 420 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$20,000.00 |
$10,000.00 |
| 430 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$8,000.00 |
$3,000.00 |
$3,000.00 |
| 440 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$56,000.00 |
$85,000.00 |
$75,000.00 |
| 450 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 8,025 | LF |
$0.5500 |
$1.25 |
$1.50 |
$1.50 |
| 460 | 856(B)8308 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 23 | EA |
$283.60 |
$300.00 |
$350.00 |
$360.00 |
| 470 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 8,025 | LF |
$0.2500 |
$0.5000 |
$1.00 |
$0.6000 |