| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$15,000.00 |
$10,582.24 |
$25,000.00 |
| 20 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$10,000.00 |
$5,026.56 |
$25,000.00 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,000 | LF |
$3.00 |
$2.89 |
$3.00 |
$3.82 |
$7.00 |
| 40 | 230(A)7200 |
SOLID SLAB SODDING | 4,000 | SY |
$4.00 |
$2.89 |
$2.90 |
$3.82 |
$7.00 |
| 50 | 407(B)7300 |
TACK COAT | 450 | GAL |
$4.00 |
$3.50 |
$3.50 |
$4.63 |
$3.50 |
| 60 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,750 | TON |
$145.00 |
$147.85 |
$148.00 |
$195.57 |
$195.00 |
| 70 | 412 3100 |
COLD MILLING PAVEMENT | 8,750 | SY |
$10.00 |
$10.00 |
$4.50 |
$5.85 |
$6.00 |
| 80 | 509(D)0500 |
CLASS C CONCRETE | 25 | CY |
$300.00 |
$900.00 |
$1,800.00 |
$527.73 |
$700.00 |
| 90 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 2,800 | LF |
$5.00 |
$3.00 |
$3.00 |
$3.88 |
$5.00 |
| 100 | 623 1100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,700.00 |
$1,100.00 |
$2,000.00 |
$58.07 |
$3,500.00 |
| 110 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,537.5 | LF |
$25.00 |
$30.00 |
$28.00 |
$36.98 |
$30.00 |
| 120 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,385.00 |
$1,800.00 |
$1,800.00 |
$2,381.01 |
$2,200.00 |
| 130 | 623(I)2030 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$2,245.50 |
$2,000.00 |
$2,000.00 |
$2,645.56 |
$2,500.00 |
| 140 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,443.00 |
$4,500.00 |
$4,500.00 |
$5,952.51 |
$5,000.00 |
| 150 | 501(G)1800 |
CLSM BACKFILL | 5 | CY |
$300.00 |
$590.00 |
$800.00 |
$1,176.62 |
$300.00 |
| 160 | 504(B)5300 |
SAW-CUT GROOVING | 429 | SY |
$10.00 |
$6.80 |
$7.00 |
$8.99 |
$13.00 |
| 170 | 505(A)6200 |
BRIDGE DECK CONCRETE OVERLAY | 429 | SY |
$250.00 |
$210.00 |
$210.00 |
$153.12 |
$325.00 |
| 180 | 505(E)6600 |
HYDRODEMOLITION | 429 | SY |
$250.00 |
$160.00 |
$250.00 |
$181.87 |
$325.00 |
| 190 | 509 0100 |
SPECIAL CONCRETE FINISH | 288 | SY |
$125.00 |
$18.00 |
$35.00 |
$23.81 |
$30.00 |
| 200 | 509 0120 |
ELASTOMERIC COATING | 130 | SF |
$20.00 |
$23.00 |
$15.00 |
$30.42 |
$30.00 |
| 210 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 5 | SY |
$600.00 |
$480.00 |
$200.00 |
$4,269.93 |
$400.00 |
| 220 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 288 | SY |
$6.50 |
$4.50 |
$8.00 |
$5.95 |
$7.00 |
| 230 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 200 | LF |
$50.00 |
$35.00 |
$25.00 |
$45.11 |
$35.00 |
| 240 | 518(J)0800 |
PREFORMED SILICONE FOAM JOINTS | 86 | LF |
$90.00 |
$93.00 |
$85.00 |
$97.81 |
$100.00 |
| 250 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 20.5 | LF |
$32.00 |
$32.00 |
$26.00 |
$42.33 |
$35.00 |
| 260 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 3 | GAL |
$105.00 |
$105.00 |
$80.00 |
$138.89 |
$150.00 |
| 270 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 25 | SY |
$1,000.00 |
$800.00 |
$650.00 |
$1,060.40 |
$1,000.00 |
| 280 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 34 | SY |
$50.00 |
$36.00 |
$35.00 |
$47.62 |
$50.00 |
| 290 | 540 8128 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 17 | SY |
$10,000.00 |
$1,800.00 |
$650.00 |
$809.24 |
$1,200.00 |
| 300 | 540 8136 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 2 | EA |
$5,000.00 |
$2,400.00 |
$5,000.00 |
$2,614.07 |
$6,000.00 |
| 310 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$4,000.00 |
$8,600.00 |
$25,000.00 |
$8,977.70 |
$75,000.00 |
| 320 | 501(G)1800 |
CLSM BACKFILL | 5 | CY |
$300.00 |
$590.00 |
$800.00 |
$5,197.87 |
$130.00 |
| 330 | 504(B)5300 |
SAW-CUT GROOVING | 429 | SY |
$10.00 |
$6.80 |
$7.00 |
$8.99 |
$13.00 |
| 340 | 505(A)6200 |
BRIDGE DECK CONCRETE OVERLAY | 429 | SY |
$250.00 |
$210.00 |
$210.00 |
$153.12 |
$325.00 |
| 350 | 505(E)6600 |
HYDRODEMOLITION | 429 | SY |
$250.00 |
$160.00 |
$250.00 |
$98.93 |
$325.00 |
| 360 | 509 0100 |
SPECIAL CONCRETE FINISH | 288 | SY |
$125.00 |
$18.00 |
$35.00 |
$23.81 |
$30.00 |
| 370 | 509 0120 |
ELASTOMERIC COATING | 130 | SF |
$20.00 |
$23.00 |
$15.00 |
$30.42 |
$30.00 |
| 380 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 5 | SY |
$600.00 |
$480.00 |
$200.00 |
$853.99 |
$400.00 |
| 390 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 288 | SY |
$6.50 |
$6.50 |
$8.00 |
$5.95 |
$7.00 |
| 400 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 200 | LF |
$50.00 |
$35.00 |
$25.00 |
$45.11 |
$35.00 |
| 410 | 518(J)0800 |
PREFORMED SILICONE FOAM JOINTS | 86 | LF |
$90.00 |
$93.00 |
$85.00 |
$96.78 |
$100.00 |
| 420 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 25 | LF |
$32.00 |
$32.00 |
$26.00 |
$42.33 |
$35.00 |
| 430 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2.5 | GAL |
$105.00 |
$105.00 |
$80.00 |
$138.89 |
$150.00 |
| 440 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 40 | SY |
$1,000.00 |
$800.00 |
$650.00 |
$1,059.68 |
$1,000.00 |
| 450 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 19.5 | SY |
$50.00 |
$36.00 |
$35.00 |
$47.62 |
$50.00 |
| 460 | 540 8136 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 2 | EA |
$5,000.00 |
$2,400.00 |
$5,000.00 |
$2,614.07 |
$6,000.00 |
| 470 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$4,000.00 |
$8,600.00 |
$25,000.00 |
$6,772.63 |
$75,000.00 |
| 480 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 3,660 | LF |
$1.00 |
$0.2500 |
$0.2800 |
$0.3700 |
$1.50 |
| 490 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 7,750 | LF |
$1.20 |
$1.38 |
$1.38 |
$1.83 |
$1.65 |
| 500 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 6,640 | LF |
$0.3000 |
$0.3500 |
$0.3500 |
$0.4600 |
$0.5000 |
| 510 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 7,750 | LF |
$0.3000 |
$0.3900 |
$0.3900 |
$0.5200 |
$0.6500 |
| 520 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 240 | SD |
$20.00 |
$17.50 |
$17.50 |
$23.15 |
$17.50 |
| 530 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 20 | SD |
$30.00 |
$30.00 |
$30.00 |
$39.68 |
$30.00 |
| 540 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,020 | LF |
$30.00 |
$9.50 |
$15.00 |
$12.57 |
$20.00 |
| 550 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,020 | LF |
$10.00 |
$2.00 |
$3.00 |
$2.65 |
$5.00 |
| 560 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 240 | SD |
$10.00 |
$10.00 |
$10.00 |
$13.23 |
$10.00 |
| 570 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,360 | SD |
$0.5000 |
$0.2500 |
$0.2500 |
$0.3300 |
$0.2500 |
| 580 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,600 | SD |
$1.50 |
$0.2500 |
$0.2500 |
$0.3300 |
$0.2500 |
| 590 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,520 | SD |
$3.00 |
$0.2500 |
$0.2500 |
$0.3300 |
$0.2500 |
| 600 | 880(B)6340 |
VARIABLE SPEED LIMIT SIGN | 480 | SD |
$20.00 |
$10.00 |
$10.00 |
$13.23 |
$10.00 |
| 610 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$2.00 |
$5.00 |
$5.00 |
$6.61 |
$5.00 |
| 620 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 5,280 | SD |
$0.5000 |
$1.20 |
$1.20 |
$1.59 |
$1.20 |
| 630 | 880(F)6700 |
DRUMS | 8,400 | SD |
$0.2500 |
$0.6500 |
$0.6500 |
$0.8600 |
$0.6500 |
| 640 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 720 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 650 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$20.00 |
$17.00 |
$17.00 |
$22.49 |
$17.00 |
| 660 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$105,000.00 |
$118,000.00 |
$165,021.24 |
$184,970.87 |
$300,000.00 |