| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$21,000.00 |
$15,000.00 |
$9,800.00 |
$20,600.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 3,431 | CY |
$15.00 |
$6.00 |
$7.50 |
$9.27 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 11,931 | CY |
$10.00 |
$9.00 |
$9.50 |
$10.30 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$22,500.00 |
$22,500.00 |
$26,000.00 |
$5,150.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,167 | LF |
$3.00 |
$9.00 |
$2.50 |
$1.85 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$145.00 |
$1,000.00 |
$970.00 |
$309.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 98 | LF |
$25.00 |
$100.00 |
$16.00 |
$18.03 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 7,148 | SY |
$3.50 |
$6.50 |
$4.00 |
$4.89 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 2 | AC |
$6,000.00 |
$6,950.00 |
$1,000.00 |
$2,060.00 |
| 100 | 241 3100 |
MOWING | 9 | AC |
$200.00 |
$695.00 |
$325.00 |
$206.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 668 | CY |
$40.00 |
$40.00 |
$76.00 |
$70.04 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 4,337 | SY |
$7.00 |
$9.00 |
$9.00 |
$9.27 |
| 130 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 3,478 | SY |
$5.00 |
$7.00 |
$1.50 |
$7.73 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 283 | TON |
$25.00 |
$25.00 |
$56.00 |
$36.05 |
| 150 | 408 8100 |
PRIME COAT | 756 | GAL |
$5.50 |
$7.00 |
$3.00 |
$7.21 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,075 | TON |
$108.00 |
$130.00 |
$124.00 |
$133.90 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 506 | TON |
$85.00 |
$175.00 |
$136.00 |
$180.25 |
| 180 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$5,704.00 |
$40,000.00 |
$25,000.00 |
$15,450.00 |
| 190 | 611(G)9050 |
INLET CDI 30SK RCP DES.1 | 1 | EA |
$3,300.00 |
$3,000.00 |
$2,600.00 |
$3,090.00 |
| 200 | 611(G)9072 |
INLET CDI 30SK RCP DES.8 | 1 | EA |
$3,000.00 |
$7,000.00 |
$14,500.00 |
$4,841.00 |
| 210 | 613(A)5208 |
18" R.C.PIPE CLASS III | 82 | LF |
$75.00 |
$100.00 |
$99.00 |
$61.80 |
| 220 | 613(A)5240 |
60" R.C.PIPE CLASS III | 228 | LF |
$150.00 |
$500.00 |
$475.00 |
$231.75 |
| 230 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 174 | LF |
$30.00 |
$80.00 |
$95.00 |
$72.10 |
| 240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,000.00 |
$3,000.00 |
$5,500.00 |
$2,575.00 |
| 250 | 619(B)6352 |
REMOVAL OF FENCE | 445 | LF |
$2.50 |
$2.50 |
$1.50 |
$1.03 |
| 260 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,125 | SY |
$7.00 |
$9.00 |
$2.00 |
$4.12 |
| 270 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 844 | LF |
$3.50 |
$6.50 |
$6.75 |
$4.12 |
| 280 | 619(C)6600 |
SAWING PAVEMENT | 401 | LF |
$6.00 |
$10.00 |
$1.00 |
$6.18 |
| 290 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 447 | LF |
$5.50 |
$12.80 |
$16.50 |
$7.73 |
| 300 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 4,210 | CY |
$25.00 |
$5.00 |
$23.50 |
$7.21 |
| 310 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 276 | CY |
$25.00 |
$30.00 |
$47.00 |
$36.05 |
| 320 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$14,500.00 |
$11,330.00 |
| 330 | 509(A)0210 |
CLASS AA CONCRETE | 872.8 | CY |
$850.00 |
$540.00 |
$651.00 |
$790.32 |
| 340 | 511(A)2210 |
REINFORCING STEEL | 133,390 | LB |
$1.75 |
$1.45 |
$1.40 |
$1.41 |
| 350 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$50,000.00 |
$36,500.00 |
$10,616.73 |
| 360 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 120 | SD |
$130.00 |
$150.00 |
$180.00 |
$154.50 |
| 370 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 1,800 | LF |
$0.4500 |
$5.00 |
$6.00 |
$5.15 |
| 380 | 857(C)9410 |
REMOVABLE PAVEMENT MARKING TAPE(8" WIDE) | 90 | LF |
$4.60 |
$4.00 |
$5.00 |
$4.12 |
| 390 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 640 | LF |
$0.2000 |
$2.00 |
$2.50 |
$2.06 |
| 400 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 190 | EA |
$2.00 |
$5.00 |
$6.00 |
$5.15 |
| 410 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 80 | SD |
$7.80 |
$20.00 |
$25.00 |
$20.60 |
| 420 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,200 | LF |
$23.00 |
$40.00 |
$25.00 |
$25.28 |
| 430 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,400 | SD |
$0.4000 |
$1.00 |
$1.30 |
$1.03 |
| 440 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$0.7500 |
$2.00 |
$2.50 |
$2.06 |
| 450 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,040 | SD |
$1.70 |
$2.00 |
$2.50 |
$2.06 |
| 460 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 600 | SD |
$0.8000 |
$0.5000 |
$0.5000 |
$0.5200 |
| 470 | 880(C)6420 |
WING BARRICADES | 480 | SD |
$2.00 |
$1.00 |
$1.30 |
$1.03 |
| 480 | 880(D)6500 |
VERTICAL PANELS | 5,280 | SD |
$0.1500 |
$0.2500 |
$0.3000 |
$0.2600 |
| 490 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,240 | SD |
$0.3500 |
$0.2500 |
$0.3000 |
$0.2600 |
| 500 | 880(F)6700 |
DRUMS | 4,320 | SD |
$0.2000 |
$0.2500 |
$0.3000 |
$0.2600 |
| 510 | 880(G)6805 |
CHANNELIZER CONES | 3,960 | SD |
$0.3000 |
$0.2500 |
$0.3000 |
$0.2600 |
| 520 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$11.00 |
$20.00 |
$25.00 |
$20.60 |
| 530 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 33.38 | SF |
$23.00 |
$40.00 |
$51.00 |
$41.20 |
| 540 | 851(C)2415 |
2" SQUARE TUBE POST | 58 | LF |
$10.15 |
$20.00 |
$25.00 |
$30.90 |
| 550 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 3,600 | LF |
$0.6000 |
$2.25 |
$2.75 |
$2.32 |
| 560 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$7,600.00 |
$9,000.00 |
$7,137.90 |
| 570 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$7,000.00 |
$12,000.00 |
$2,575.00 |
| 580 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$121,000.00 |
$100,000.00 |
$69,119.32 |
$139,567.11 |