| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$5,805.80 |
$10,000.00 |
$4,512.22 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$25.00 |
$23.53 |
$20.00 |
$37.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 250 | CY |
$25.00 |
$35.63 |
$30.00 |
$51.70 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$2,897.61 |
$10,000.00 |
$12,304.23 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,412 | LF |
$4.00 |
$3.28 |
$5.50 |
$3.51 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 133 | LF |
$20.00 |
$21.88 |
$22.00 |
$23.41 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 615 | SY |
$7.00 |
$8.68 |
$18.00 |
$9.29 |
| 80 | 303(A)1200 |
AGGREGATE BASE TYPE A | 60 | CY |
$85.00 |
$137.98 |
$78.00 |
$197.42 |
| 90 | 307(K)4200 |
STABILIZED SUBGRADE | 343 | SY |
$12.00 |
$25.90 |
$16.00 |
$60.46 |
| 100 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 15 | TON |
$65.00 |
$72.05 |
$44.00 |
$100.22 |
| 110 | 407(B)7300 |
TACK COAT | 22 | GAL |
$7.00 |
$24.20 |
$5.00 |
$177.36 |
| 120 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 97 | TON |
$150.00 |
$161.38 |
$150.00 |
$326.41 |
| 130 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 32 | TON |
$215.00 |
$252.97 |
$170.00 |
$424.64 |
| 140 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 174 | LF |
$50.00 |
$52.93 |
$40.00 |
$56.69 |
| 150 | 610(A)5200 |
4" CONCRETE SIDEWALK | 770 | SY |
$65.00 |
$71.38 |
$70.00 |
$101.24 |
| 160 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 478 | SY |
$75.00 |
$98.67 |
$85.00 |
$126.46 |
| 170 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 90 | SF |
$35.00 |
$30.27 |
$40.00 |
$42.87 |
| 180 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 10 | LF |
$50.00 |
$93.79 |
$105.00 |
$71.24 |
| 190 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 40 | LF |
$60.00 |
$118.52 |
$125.00 |
$73.55 |
| 200 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$900.00 |
$302.91 |
$700.00 |
$504.81 |
| 210 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,100.00 |
$667.15 |
$800.00 |
$709.89 |
| 220 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$5,805.80 |
$10,000.00 |
$10,541.96 |
| 230 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 174 | LF |
$10.00 |
$10.00 |
$12.00 |
$11.01 |
| 240 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 529 | SY |
$15.00 |
$13.16 |
$12.00 |
$18.92 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 297 | SY |
$13.00 |
$11.72 |
$12.00 |
$17.62 |
| 260 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$250.00 |
$550.00 |
$600.00 |
$588.49 |
| 270 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 40 | LF |
$10.00 |
$110.00 |
$110.00 |
$117.70 |
| 280 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 600 | SD |
$0.7500 |
$2.20 |
$4.00 |
$2.35 |
| 290 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 120 | SD |
$2.00 |
$2.20 |
$4.00 |
$2.35 |
| 300 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 120 | SD |
$2.50 |
$2.20 |
$4.00 |
$2.35 |
| 310 | 880(F)6700 |
DRUMS | 600 | SD |
$0.6000 |
$1.10 |
$4.00 |
$1.18 |
| 320 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$4,734.16 |
$3,000.00 |
$7,414.94 |
| 330 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$29,543.14 |
$40,000.00 |
$53,405.17 |