| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$9,884.10 |
$12,000.00 |
$160,000.00 |
$48,247.70 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,477 | CY |
$15.00 |
$66.00 |
$20.00 |
$19.00 |
$40.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 692 | CY |
$20.00 |
$4.95 |
$24.00 |
$20.00 |
$41.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$13,000.00 |
$32,202.22 |
$21,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 13,691 | LF |
$2.00 |
$1.25 |
$2.77 |
$1.75 |
$1.30 |
| 60 | 227 4100 |
(SP)TURF REINFORCEMENT MAT | 78 | SY |
$100.00 |
$22.00 |
$51.45 |
$71.94 |
$100.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 7,799 | SY |
$5.00 |
$6.25 |
$3.10 |
$2.95 |
$3.80 |
| 80 | 240(A)2200 |
REMOVING TREES 6" TO 12" IN DIAMETER | 17 | EA |
$250.00 |
$450.00 |
$375.00 |
$275.52 |
$600.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,906 | CY |
$50.00 |
$50.00 |
$50.00 |
$52.50 |
$48.00 |
| 100 | 310(B)5300 |
SUBGRADE, METHOD B | 11,579 | SY |
$3.00 |
$1.00 |
$1.75 |
$1.99 |
$2.00 |
| 110 | 325 0100 |
SEPARATOR FABRIC | 14,700 | SY |
$1.50 |
$2.00 |
$1.85 |
$1.85 |
$2.00 |
| 120 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,539 | TON |
$90.00 |
$100.00 |
$86.00 |
$82.50 |
$97.00 |
| 130 | 509(A)0200 |
CLASS AA CONCRETE | 391 | CY |
$600.00 |
$350.00 |
$530.00 |
$385.00 |
$525.00 |
| 140 | 509(D)0500 |
CLASS C CONCRETE | 73 | CY |
$300.00 |
$300.00 |
$400.00 |
$325.61 |
$580.00 |
| 150 | 510(A)1200 |
RETAINING WALL | 214 | SY |
$500.00 |
$250.00 |
$385.00 |
$325.00 |
$325.00 |
| 160 | 510(C)1400 |
SLOPE WALL | 157 | SY |
$125.00 |
$110.00 |
$135.00 |
$147.62 |
$140.00 |
| 170 | 511(A)2200 |
REINFORCING STEEL | 7,584 | LB |
$1.75 |
$1.50 |
$1.90 |
$2.11 |
$1.45 |
| 180 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 25 | TON |
$65.00 |
$50.00 |
$85.00 |
$93.14 |
$80.00 |
| 190 | 609(B)4310 |
COMBINED CURB & GUTTER(6" BARRIER) | 50 | LF |
$40.00 |
$22.00 |
$39.00 |
$155.02 |
$48.00 |
| 200 | 610(A)5200 |
4" CONCRETE SIDEWALK | 349 | SY |
$55.00 |
$45.00 |
$60.00 |
$59.83 |
$51.00 |
| 210 | 610(B)5320 |
8" CONCRETE DRIVEWAY | 40 | SY |
$90.00 |
$55.00 |
$85.00 |
$180.01 |
$57.00 |
| 220 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 40 | SF |
$40.00 |
$20.00 |
$35.00 |
$70.98 |
$41.00 |
| 230 | 611(G)0362 |
INLET (SMD-TYPE 2B) | 1 | EA |
$4,000.00 |
$6,000.00 |
$5,400.00 |
$3,269.07 |
$5,420.00 |
| 240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$6,000.00 |
$6,500.00 |
$25,000.00 |
$31,100.00 |
| 250 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 110 | LF |
$10.00 |
$3.25 |
$8.00 |
$24.50 |
$11.00 |
| 260 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 88 | SY |
$18.00 |
$10.50 |
$15.00 |
$70.97 |
$22.00 |
| 270 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 150 | LF |
$10.00 |
$2.50 |
$10.00 |
$15.92 |
$42.00 |
| 280 | 619(B)6404 |
REMOVAL OF SIDEWALK | 176 | SY |
$20.00 |
$30.00 |
$15.00 |
$17.38 |
$18.00 |
| 290 | 619(B)6408 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 244 | SY |
$20.00 |
$31.00 |
$15.00 |
$25.59 |
$30.00 |
| 300 | 622(A)0210 |
1 1/2" PIPE RAILING | 404 | LF |
$118.00 |
$150.00 |
$230.00 |
$205.00 |
$240.00 |
| 310 | 622(A)0220 |
2" PIPE RAILING | 160 | LF |
$100.00 |
$115.00 |
$230.00 |
$178.00 |
$260.00 |
| 320 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,200.00 |
$800.00 |
$775.00 |
$1,482.69 |
$1,100.00 |
| 330 | 623(I)2030 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$1,600.00 |
$2,800.00 |
$2,700.00 |
$1,966.83 |
$2,800.00 |
| 340 | 631(A)9210 |
(SP)REMOVABLE BOLLARD | 4 | EA |
$1,250.00 |
$1,500.00 |
$2,500.00 |
$2,277.24 |
$2,200.00 |
| 350 | 632 0100 |
(PL) SITESCAPING | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$21,000.00 |
$28,000.00 |
$29,100.00 |
| 360 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 240 | CY |
$25.00 |
$8.00 |
$25.00 |
$32.27 |
$25.00 |
| 370 | 501(F)1700 |
GRANULAR BACKFILL | 50 | CY |
$65.00 |
$55.00 |
$75.00 |
$77.13 |
$77.00 |
| 380 | 509(B)0320 |
CLASS A CONCRETE | 23 | CY |
$500.00 |
$500.00 |
$1,000.00 |
$521.34 |
$750.00 |
| 390 | 511(A)2210 |
REINFORCING STEEL | 1,620 | LB |
$2.00 |
$1.50 |
$1.65 |
$2.69 |
$1.50 |
| 400 | 535 7170 |
PREFABRICATED PEDESTRIAN BRIDGE | 1 | EA |
$150,000.00 |
$160,000.00 |
$195,000.00 |
$161,000.00 |
$147,000.00 |
| 410 | 836 7100 |
REGULATORY OR WARNING SIGN ASSEMBLY | 4 | EA |
$10,000.00 |
$6,500.00 |
$6,000.00 |
$9,200.00 |
$11,500.00 |
| 420 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 95 | SF |
$40.00 |
$28.00 |
$27.00 |
$48.41 |
$28.00 |
| 430 | 851(C)2410 |
1 3/4" SQUARE TUBE POST | 209 | LF |
$7.00 |
$16.00 |
$16.00 |
$7.26 |
$11.00 |
| 440 | 854(A)6200 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,808 | LF |
$0.7500 |
$5.50 |
$5.40 |
$0.8500 |
$3.50 |
| 450 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 192 | LF |
$20.00 |
$36.00 |
$30.00 |
$24.21 |
$17.50 |
| 460 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,110 | SD |
$0.1000 |
$1.15 |
$1.05 |
$0.0200 |
$1.25 |
| 470 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 510 | SD |
$1.00 |
$2.25 |
$2.15 |
$0.4200 |
$6.00 |
| 480 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 120 | SD |
$2.00 |
$2.25 |
$2.15 |
$2.18 |
$1.25 |
| 490 | 880(F)6700 |
DRUMS | 870 | SD |
$1.50 |
$1.15 |
$1.00 |
$2.42 |
$1.25 |
| 500 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$6,000.00 |
$20,000.00 |
$15,500.00 |
$9,000.00 |
| 510 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$7,500.00 |
$1,375.00 |
$3,025.88 |
$2,100.00 |
| 520 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$85,000.00 |
$65,000.00 |
$99,000.00 |
$60,000.00 |
$62,000.00 |