| 10 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,500 | CY |
$15.00 |
$5.00 |
$37.00 |
| 20 | 202(H)2900 |
EARTHWORK | 1 | LSUM |
$8,000.00 |
$45,000.00 |
$15,550.00 |
| 30 | 407(C)7400 |
(SP) POLYMER MOD. CATIONIC RAPID SET - 1S | 36,010 | GAL |
$3.00 |
$3.00 |
$3.30 |
| 40 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 16,130 | TON |
$125.00 |
$135.00 |
$141.00 |
| 50 | 411(I)2000 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 300 | TON |
$175.00 |
$230.00 |
$230.50 |
| 60 | 412 3100 |
COLD MILLING PAVEMENT | 2,900 | SY |
$5.00 |
$4.00 |
$6.55 |
| 70 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 42,400 | LF |
$0.2000 |
$0.2900 |
$0.6500 |
| 80 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 84,400 | LF |
$0.1500 |
$0.1100 |
$0.4500 |
| 90 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 125,850 | LF |
$0.6500 |
$0.7200 |
$0.9000 |
| 100 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 36 | LF |
$10.00 |
$4.00 |
$15.90 |
| 110 | 880(J)7100 |
(SP) CONSTRUCTION TRAFFIC CONTROL | 70 | SD |
$180.00 |
$89.93 |
$132.50 |
| 120 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 140 | SD |
$15.00 |
$18.00 |
$26.50 |
| 130 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$130,000.00 |
$158,000.00 |
$141,000.00 |