| 5 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 432 | CY |
$17.00 |
$18.00 |
$42.60 |
$37.35 |
| 10 | 221(B)2300 |
TEMPORARY SILT FENCE | 400 | LF |
$3.85 |
$5.00 |
$5.27 |
$4.36 |
| 15 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 8 | CY |
$32.00 |
$60.00 |
$63.90 |
$43.58 |
| 20 | 804(A)2200 |
STRUCTURAL CONCRETE | 56 | CY |
$800.00 |
$1,450.00 |
$1,171.50 |
$1,767.90 |
| 30 | 804(B)2300 |
REINFORCING STEEL | 1,484 | LB |
$2.00 |
$3.40 |
$3.20 |
$4.11 |
| 40 | 852(A/B)4466 |
OVHD.SN.STR.TYPE C-1 ALUM./G.STL.105' | 2 | EA |
$5,000.00 |
$12,000.00 |
$21,300.00 |
$14,379.75 |
| 50 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 80 | SD |
$81.50 |
$12.50 |
$12.78 |
$14.94 |
| 60 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 80 | SD |
$23.50 |
$1.05 |
$1.07 |
$1.25 |
| 70 | 880(J)7110 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$18,000.00 |
$3,100.00 |
$3,195.00 |
$3,735.00 |
| 80 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 24 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 90 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 80 | SD |
$10.55 |
$6.25 |
$6.39 |
$7.47 |
| 100 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$4,077.62 |
$40,000.00 |
$12,450.00 |
| 110 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$150,000.00 |
$230,000.00 |
$10,000.00 |
$311,573.70 |
| 120 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 73,542 | CY |
$10.00 |
$13.00 |
$16.00 |
$31.17 |
| 130 | 202(D)2500 |
UNCLASSIFIED BORROW | 20,223 | CY |
$10.00 |
$14.00 |
$19.00 |
$40.14 |
| 140 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$120,000.00 |
$46,000.00 |
$200,000.00 |
$314,922.75 |
| 150 | 221(B)2300 |
TEMPORARY SILT FENCE | 8,983 | LF |
$2.00 |
$5.00 |
$5.27 |
$4.98 |
| 160 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 6 | EA |
$250.00 |
$405.00 |
$420.68 |
$311.25 |
| 170 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,905 | LF |
$12.00 |
$16.00 |
$15.92 |
$12.45 |
| 180 | 230(A)7200 |
SOLID SLAB SODDING | 110,269 | SY |
$2.50 |
$3.55 |
$3.72 |
$4.98 |
| 190 | 241 3100 |
MOWING | 26 | AC |
$200.00 |
$255.00 |
$265.19 |
$155.63 |
| 200 | 307(K)4200 |
STABILIZED SUBGRADE | 89,401 | SY |
$6.00 |
$7.50 |
$8.50 |
$10.89 |
| 210 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 21,213 | TON |
$85.00 |
$85.00 |
$96.00 |
$191.73 |
| 220 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,222 | TON |
$90.00 |
$107.00 |
$207.68 |
$305.03 |
| 230 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 80,685 | SY |
$25.00 |
$26.00 |
$37.00 |
$62.25 |
| 240 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 21,287 | CY |
$150.00 |
$223.00 |
$172.00 |
$213.33 |
| 250 | 414(G)5810 |
(PL) P.C. CONCRETE FOR PAVEMENT, SPECIAL | 814 | CY |
$400.00 |
$265.00 |
$300.00 |
$217.88 |
| 260 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,586 | CY |
$30.00 |
$30.00 |
$27.69 |
$40.15 |
| 270 | 501(G)1810 |
CLSM BACKFILL | 268 | CY |
$225.00 |
$275.00 |
$193.99 |
$234.89 |
| 280 | 504(E)5520 |
42" F-SHAPED PARAPET | 772 | LF |
$110.00 |
$135.00 |
$133.13 |
$118.28 |
| 290 | 509(A)0200 |
CLASS AA CONCRETE | 921 | CY |
$600.00 |
$975.00 |
$628.35 |
$1,058.25 |
| 300 | 509(D)0500 |
CLASS C CONCRETE | 1,320 | CY |
$300.00 |
$255.00 |
$298.20 |
$498.00 |
| 310 | 510(C)1440 |
SLOPE WALL (5") | 444 | SY |
$125.00 |
$250.00 |
$111.83 |
$69.72 |
| 320 | 511(A)2200 |
REINFORCING STEEL | 126,659 | LB |
$1.25 |
$1.75 |
$1.17 |
$1.25 |
| 330 | 516(A)8220 |
DRILLED SHAFTS 36" DIAMETER | 486 | LF |
$600.00 |
$785.00 |
$809.40 |
$946.20 |
| 340 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 1,917 | LF |
$20.00 |
$11.00 |
$13.00 |
$27.39 |
| 350 | 610(A)5200 |
4" CONCRETE SIDEWALK | 630 | SY |
$60.00 |
$90.00 |
$58.58 |
$80.93 |
| 360 | 611(L)1600 |
JUNCTION BOXES | 311 | CF |
$85.00 |
$40.00 |
$43.09 |
$149.40 |
| 370 | 613(A)5208 |
18" R.C.PIPE CLASS III | 60 | LF |
$75.00 |
$110.00 |
$110.80 |
$219.68 |
| 380 | 613(A)5216 |
24" R.C.PIPE CLASS III | 404 | LF |
$90.00 |
$250.00 |
$116.95 |
$241.84 |
| 390 | 613(A)5220 |
30" R.C.PIPE CLASS III | 84 | LF |
$160.00 |
$135.00 |
$141.68 |
$240.98 |
| 400 | 613(A)5224 |
36" R.C.PIPE CLASS III | 92 | LF |
$125.00 |
$180.00 |
$231.36 |
$265.07 |
| 410 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,000.00 |
$1,350.00 |
$1,028.73 |
$3,098.18 |
| 420 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 8 | EA |
$1,000.00 |
$1,450.00 |
$1,161.03 |
$3,192.96 |
| 430 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,750.00 |
$1,650.00 |
$1,306.20 |
$3,659.68 |
| 440 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,250.00 |
$2,200.00 |
$2,088.73 |
$4,333.85 |
| 450 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$375,000.00 |
$43,800.00 |
$400,000.00 |
$96,275.85 |
| 460 | 619(B)6300 |
REMOVAL OF HEADWALL | 9 | EA |
$1,000.00 |
$1,300.00 |
$1,065.00 |
$311.25 |
| 470 | 619(B)6352 |
REMOVAL OF FENCE | 1,051 | LF |
$2.00 |
$4.25 |
$3.63 |
$4.98 |
| 480 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 64,876 | SY |
$10.00 |
$6.00 |
$12.00 |
$15.55 |
| 490 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 5,808 | SY |
$6.00 |
$3.50 |
$12.00 |
$12.14 |
| 500 | 619(B)6368 |
REMOVAL OF DRAINAGE INLETS | 7 | EA |
$500.00 |
$1,050.00 |
$1,100.00 |
$311.25 |
| 510 | 619(B)6388 |
REMOVAL OF CONCRETE CURB OPENING | 234 | SY |
$10.00 |
$30.00 |
$17.00 |
$9.96 |
| 520 | 619(B)6392 |
REMOVAL OF EXISTING STRUCTURES | 3 | EA |
$5,000.00 |
$12,000.00 |
$12,000.00 |
$9,130.00 |
| 530 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,703 | LF |
$4.00 |
$8.00 |
$8.00 |
$9.35 |
| 540 | 619(B)6400 |
REMOVAL OF CURB | 17,085 | LF |
$6.00 |
$2.50 |
$2.19 |
$9.96 |
| 550 | 619(B)6404 |
REMOVAL OF SIDEWALK | 110 | SY |
$10.00 |
$20.00 |
$29.44 |
$14.94 |
| 560 | 619(B)6408 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 2,295 | SY |
$10.00 |
$15.00 |
$10.65 |
$14.94 |
| 570 | 619(B)6416 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 1,715 | LF |
$15.00 |
$12.00 |
$1.00 |
$68.48 |
| 580 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 1,825 | LF |
$8.00 |
$15.00 |
$15.02 |
$17.55 |
| 590 | 619(B)6436 |
REMOVAL OF CONCRETE DITCH LINER | 2,570 | LF |
$8.00 |
$5.00 |
$11.00 |
$14.94 |
| 600 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 661 | LF |
$20.00 |
$35.00 |
$10.00 |
$22.41 |
| 610 | 619(C)6600 |
SAWING PAVEMENT | 38,330 | LF |
$2.00 |
$1.75 |
$4.00 |
$5.60 |
| 620 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,325 | LF |
$25.00 |
$26.50 |
$27.15 |
$31.74 |
| 630 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 9 | EA |
$1,500.00 |
$1,975.00 |
$2,023.50 |
$2,365.50 |
| 640 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 11 | EA |
$2,500.00 |
$4,600.00 |
$4,792.50 |
$5,602.50 |
| 650 | 623(I)2040 |
GUARDRAIL BRIDGE CONN (D-BF RETROFIT) | 1 | EA |
$1,500.00 |
$2,850.00 |
$2,928.75 |
$3,423.75 |
| 660 | 627(A)6200 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 3,386 | LF |
$100.00 |
$80.00 |
$60.00 |
$93.38 |
| 670 | 627(B)6300 |
CONCRETE LONGITUDINAL BARRIER END SEC. | 8 | EA |
$1,500.00 |
$5,000.00 |
$2,130.00 |
$2,178.75 |
| 680 | 628(B)7300 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,100 | LF |
$25.00 |
$14.00 |
$14.40 |
$16.83 |
| 690 | 628(C)7400 |
END ANCHORS | 6 | EA |
$9,500.00 |
$9,350.00 |
$9,585.00 |
$11,205.00 |
| 700 | 628(F)7700 |
(PL)HIGH TENSION CABLE BARR. RE-TENSION | 4 | EA |
$750.00 |
$490.00 |
$505.88 |
$591.38 |
| 710 | 650(A)8100 |
TOLL EQUIPMENT BUILDING FOUNDATION | 5 | EA |
$17,500.00 |
$12,000.00 |
$30,000.00 |
$6,197.61 |
| 720 | 650(A)8110 |
GENERATOR PAD AND ENCLOSURE | 7 | EA |
$50,000.00 |
$46,000.00 |
$60,000.00 |
$37,180.68 |
| 730 | 650(B)8200 |
TOLL EQUIPMENT BUILDING INSTALLATION | 5 | EA |
$5,000.00 |
$4,700.00 |
$6,000.00 |
$17,793.54 |
| 740 | 650(C)8300 |
ELECTRICAL GENERATOR | 7 | EA |
$40,000.00 |
$46,700.00 |
$60,000.00 |
$56,025.00 |
| 750 | 650(C)8310 |
ELECTRICAL EQUIPMENT | 1 | LSUM |
$450,000.00 |
$480,000.00 |
$550,000.00 |
$572,700.00 |
| 760 | 650(C)8320 |
PROPANE TANK WITH PAD | 7 | EA |
$30,000.00 |
$37,900.00 |
$45,000.00 |
$53,009.61 |
| 770 | 802(B)0308 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 4,415 | LF |
$15.00 |
$21.00 |
$21.30 |
$24.90 |
| 780 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 620 | LF |
$15.00 |
$31.00 |
$31.95 |
$37.35 |
| 790 | 802(B)0328 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 500 | LF |
$35.00 |
$88.00 |
$90.53 |
$105.83 |
| 800 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,905 | LF |
$20.00 |
$42.00 |
$42.60 |
$49.80 |
| 810 | 802(B)0340 |
4" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,320 | LF |
$40.00 |
$50.00 |
$51.12 |
$59.76 |
| 820 | 803(A)1210 |
PULL BOX(SIZE I) | 21 | EA |
$1,000.00 |
$2,075.00 |
$2,130.00 |
$2,490.00 |
| 830 | 803(A)1220 |
PULL BOX(SIZE II) | 51 | EA |
$1,000.00 |
$2,335.00 |
$2,396.25 |
$2,801.25 |
| 840 | 804(A)2200 |
STRUCTURAL CONCRETE | 226 | CY |
$800.00 |
$1,055.00 |
$1,080.45 |
$2,257.19 |
| 850 | 804(B)2300 |
REINFORCING STEEL | 11,462 | LB |
$2.00 |
$3.60 |
$3.50 |
$3.74 |
| 860 | 824(C)7400 |
(SP)CABINET | 2 | EA |
$10,000.00 |
$23,900.00 |
$24,495.00 |
$28,635.00 |
| 870 | 852(A/B)4410 |
OVHD.SN.STR.TYPE C-1 ALUM./G.STL.50' | 2 | EA |
$5,000.00 |
$18,200.00 |
$18,637.50 |
$14,628.75 |
| 880 | 852(A/B)4466 |
OVHD.SN.STR.TYPE C-1 ALUM./G.STL.105' | 10 | EA |
$5,000.00 |
$20,750.00 |
$21,300.00 |
$15,624.75 |
| 890 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 56 | EA |
$20.00 |
$13.50 |
$14.11 |
$16.50 |
| 900 | 871(A)2200 |
IMPACT ATTENUATOR | 10 | EA |
$25,000.00 |
$23,000.00 |
$24,223.43 |
$28,317.53 |
| 910 | 804(A)2200 |
STRUCTURAL CONCRETE | 54 | CY |
$800.00 |
$515.00 |
$532.50 |
$622.50 |
| 920 | 804(B)2300 |
REINFORCING STEEL | 9,758 | LB |
$2.00 |
$3.10 |
$3.20 |
$3.74 |
| 930 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 171 | EA |
$250.00 |
$290.00 |
$292.88 |
$342.38 |
| 940 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 228 | SF |
$35.00 |
$21.00 |
$21.30 |
$24.90 |
| 950 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 4,952 | SF |
$30.00 |
$24.00 |
$24.50 |
$28.64 |
| 960 | 850(B)1320 |
EXTR.ALUM.PAN.SGN.(OVRHD SIGNS) | 3,653 | SF |
$30.00 |
$27.00 |
$27.69 |
$32.37 |
| 970 | 851(A)2205 |
6"@15 GALV.STL.WD.FLANGE BM.POST | 1,357 | LF |
$65.00 |
$47.00 |
$47.93 |
$56.03 |
| 980 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 152 | LF |
$20.00 |
$8.25 |
$8.52 |
$9.96 |
| 990 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 180 | EA |
$100.00 |
$60.00 |
$61.77 |
$72.21 |
| 1,000 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 45,798 | LF |
$1.00 |
$0.9200 |
$0.9600 |
$1.12 |
| 1,010 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 12,198 | LF |
$2.00 |
$1.85 |
$1.92 |
$2.24 |
| 1,020 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 12,442 | LF |
$3.00 |
$2.00 |
$2.08 |
$2.43 |
| 1,030 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 107,666 | LF |
$1.00 |
$1.52 |
$1.54 |
$1.81 |
| 1,040 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 3,330 | SD |
$20.00 |
$20.50 |
$21.30 |
$24.90 |
| 1,050 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 22,475 | LF |
$25.00 |
$30.00 |
$35.00 |
$52.29 |
| 1,060 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 36,430 | LF |
$5.00 |
$3.50 |
$5.43 |
$8.68 |
| 1,070 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 2,320 | SD |
$5.00 |
$3.10 |
$3.20 |
$3.74 |
| 1,080 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 17,695 | SD |
$0.5000 |
$0.0600 |
$0.0500 |
$0.0600 |
| 1,090 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 20,835 | SD |
$0.7500 |
$0.0600 |
$0.0500 |
$0.0600 |
| 1,100 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 32,010 | SD |
$1.50 |
$0.0600 |
$0.0500 |
$0.0600 |
| 1,110 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 5,970 | SD |
$1.00 |
$5.10 |
$5.33 |
$6.23 |
| 1,120 | 880(C)6420 |
WING BARRICADES | 5,360 | SD |
$1.00 |
$0.0300 |
$0.0200 |
$0.0200 |
| 1,130 | 880(F)6700 |
DRUMS | 65,845 | SD |
$0.5000 |
$0.7700 |
$0.8000 |
$0.9300 |
| 1,140 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 1,410 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 1,150 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 4,355 | SD |
$20.00 |
$26.00 |
$26.63 |
$31.13 |
| 1,160 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 1,205 | LF |
$30.00 |
$57.00 |
$58.58 |
$68.48 |
| 1,170 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 3,865 | LF |
$15.00 |
$21.00 |
$21.30 |
$24.90 |
| 1,180 | 803(A)1210 |
PULL BOX(SIZE I) | 8 | EA |
$1,200.00 |
$1,975.00 |
$2,034.15 |
$2,377.95 |
| 1,190 | 804(A)2200 |
STRUCTURAL CONCRETE | 46 | CY |
$800.00 |
$1,500.00 |
$1,544.25 |
$1,805.25 |
| 1,200 | 804(B)2300 |
REINFORCING STEEL | 7,952 | LB |
$2.00 |
$2.60 |
$2.66 |
$3.11 |
| 1,210 | 805(A)3228 |
(PL)REMOVAL OF LIGHT POLE | 4 | EA |
$1,000.00 |
$780.00 |
$798.75 |
$933.75 |
| 1,220 | 805(D)3504 |
(PL)REMOVE & RESET LIGHT POLE | 28 | EA |
$7,000.00 |
$1,555.00 |
$1,597.50 |
$1,867.50 |
| 1,230 | 807 5120 |
BREAKAWAY BASE (DES. B) | 28 | EA |
$1,000.00 |
$1,010.00 |
$1,038.38 |
$1,213.88 |
| 1,240 | 809(A)7200 |
ROADWAY LUMINAIRE | 44 | EA |
$1,000.00 |
$2,180.00 |
$2,236.50 |
$2,614.50 |
| 1,250 | 811 9115 |
1/C NO.4 ELECT.COND. | 10,570 | LF |
$3.50 |
$2.10 |
$2.13 |
$2.49 |
| 1,260 | 811 9135 |
1/C NO.12 ELECT.COND. | 4,400 | LF |
$1.25 |
$1.55 |
$1.60 |
$1.87 |
| 1,270 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$100,000.00 |
$180,000.00 |
$40,462.50 |
| 1,280 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$50,000.00 |
$2,000.00 |
$30,000.00 |
$933.75 |
| 1,290 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$840,000.00 |
$849,000.00 |
|
$950,000.00 |