| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$22,500.00 |
$20,000.00 |
$11,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 8,422 | CY |
$10.50 |
$10.00 |
$11.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 500 | CY |
$13.00 |
$15.00 |
$11.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$22,500.00 |
$10,000.00 |
$16,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 885 | LF |
$3.25 |
$4.80 |
$5.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 636 | LF |
$14.50 |
$25.00 |
$25.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 6,205 | SY |
$3.00 |
$6.60 |
$6.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 3 | AC |
$1,200.00 |
$4,775.00 |
$3,000.00 |
| 90 | 241 3100 |
MOWING | 6 | AC |
$190.00 |
$600.00 |
$350.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 801 | CY |
$70.00 |
$85.00 |
$90.00 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 391 | TON |
$40.00 |
$43.00 |
$46.00 |
| 120 | 408 8100 |
PRIME COAT | 2,099 | GAL |
$5.50 |
$7.70 |
$12.00 |
| 130 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 2,917 | SY |
$37.00 |
$80.00 |
$70.00 |
| 140 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 730 | CY |
$230.00 |
$200.00 |
$195.00 |
| 150 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 395 | CY |
$30.00 |
$25.00 |
$27.00 |
| 160 | 501(G)1800 |
CLSM BACKFILL | 490 | CY |
$190.00 |
$180.00 |
$200.00 |
| 170 | 504(A)5200 |
APPROACH SLAB | 642 | SY |
$270.00 |
$260.00 |
$285.00 |
| 180 | 504(B)5300 |
SAW-CUT GROOVING | 1,328 | SY |
$5.95 |
$4.95 |
$5.00 |
| 190 | 509(A)0200 |
CLASS AA CONCRETE | 738 | CY |
$605.00 |
$550.00 |
$690.00 |
| 200 | 509(D)0500 |
CLASS C CONCRETE | 32 | CY |
$410.00 |
$400.00 |
$600.00 |
| 210 | 511(A)2200 |
REINFORCING STEEL | 61,898 | LB |
$1.30 |
$1.20 |
$1.26 |
| 220 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 59,710 | LB |
$2.75 |
$1.40 |
$1.45 |
| 230 | 602(B)2300 |
ARTICULATING CONCRETE BLOCK | 2,029 | SF |
$28.50 |
$30.00 |
$42.00 |
| 240 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 97 | SY |
$80.00 |
$82.00 |
$140.00 |
| 250 | 613(A)5216 |
24" R.C.PIPE CLASS III | 36 | LF |
$95.00 |
$115.00 |
$114.00 |
| 260 | 613(A)5224 |
36" R.C.PIPE CLASS III | 48 | LF |
$147.50 |
$156.00 |
$182.00 |
| 270 | 613(A)5228 |
42" R.C.PIPE CLASS III | 118 | LF |
$190.00 |
$153.00 |
$206.00 |
| 280 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 96 | LF |
$102.50 |
$81.00 |
$92.00 |
| 290 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 434 | LF |
$125.00 |
$100.00 |
$120.00 |
| 300 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,200.00 |
$1,000.00 |
$1,950.00 |
| 310 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,050.00 |
$2,755.00 |
$3,550.00 |
| 320 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$3,150.00 |
$4,250.00 |
$4,475.00 |
| 330 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,350.00 |
$1,350.00 |
$1,400.00 |
| 340 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$1,600.00 |
$2,075.00 |
| 350 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 6 | EA |
$2,975.00 |
$3,075.00 |
$3,200.00 |
| 360 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$24,000.00 |
$14,000.00 |
$63,000.00 |
| 370 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,289 | SY |
$5.10 |
$8.50 |
$12.95 |
| 380 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,265 | LF |
$9.75 |
$9.00 |
$13.20 |
| 390 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 11,700 | SD |
$1.20 |
$1.15 |
$1.90 |
| 400 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,080 | SD |
$1.35 |
$0.5500 |
$0.4000 |
| 410 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,060 | SD |
$2.25 |
$0.1500 |
$0.0500 |
| 420 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,160 | SD |
$2.50 |
$0.5300 |
$0.4000 |
| 430 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,440 | SD |
$1.25 |
$0.5300 |
$0.3500 |
| 440 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$20.00 |
$10.50 |
$11.00 |
| 450 | 805(D)3536 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 8 | EA |
$750.00 |
$110.00 |
$120.00 |
| 460 | 853 5155 |
DELINEATORS(TYPE 2, CODE 3, FLEXIBLE) | 28 | EA |
$35.00 |
$26.00 |
$25.00 |
| 470 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 2,154 | LF |
$3.10 |
$2.05 |
$2.20 |
| 480 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 96 | LF |
$12.50 |
$11.00 |
$11.00 |
| 490 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$27,500.00 |
$11,100.00 |
$12,500.00 |
| 500 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$4,000.00 |
$3,200.00 |
| 510 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$107,500.00 |
$100,000.00 |
$88,000.00 |