| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$115,000.00 |
$260,050.92 |
$227,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 948,133 | CY |
$6.50 |
$6.14 |
$8.00 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 631,617 | CY |
$10.00 |
$6.14 |
$8.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 148,145 | CY |
$10.00 |
$0.2500 |
$1.00 |
| 50 | 202(L)4100 |
(SP) VIBRATING WIRE PIEZOMETERS | 27 | EA |
$1,000.00 |
$3,493.92 |
$2,000.00 |
| 60 | 202(L)4110 |
(SP) VIBRATING WIRE TERMINAL BOXES | 27 | EA |
$1,000.00 |
$128.26 |
$900.00 |
| 70 | 202(L)4120 |
(SP) VIBRATING WIRE READOUT AND DATA COL | 27 | EA |
$1,000.00 |
$1,221.45 |
$1,500.00 |
| 80 | 202(L)4130 |
(SP) SUPERVISING AND MAINTAINING INSTRUM | 1 | LSUM |
$40,000.00 |
$50,079.68 |
$16,977.50 |
| 90 | 202(L)4140 |
(SP) SETTLEMENT PLATE | 37 | EA |
$1,500.00 |
$849.11 |
$2,000.00 |
| 100 | 205(A)6210 |
TYPE A-SALVAGED TOPSOIL | 73,853 | CY |
$4.00 |
$3.92 |
$3.00 |
| 110 | 221(B)2300 |
TEMPORARY SILT FENCE | 12,000 | LF |
$2.50 |
$3.17 |
$2.00 |
| 120 | 221(E)2600 |
TEMPORARY SILT DIKE | 2,772 | LF |
$10.00 |
$10.37 |
$8.50 |
| 130 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 36 | CY |
$280.00 |
$52.98 |
$300.00 |
| 140 | 221(G)2800 |
TEMPORARY FIBER LOG | 165,823 | LF |
$4.00 |
$6.70 |
$5.00 |
| 150 | 229 6100 |
DITCH LINER PROTECTION | 24,264 | LF |
$2.50 |
$4.58 |
$4.00 |
| 160 | 230(A)7200 |
SOLID SLAB SODDING | 611,372 | SY |
$2.00 |
$3.04 |
$2.50 |
| 170 | 232(A)9200 |
SEEDING METHOD A | 190.82 | AC |
$1,000.00 |
$609.51 |
$500.00 |
| 180 | 233(A)0200 |
VEGETATIVE MULCHING | 381.64 | AC |
$800.00 |
$792.73 |
$600.00 |
| 190 | 241 3100 |
MOWING | 763.28 | AC |
$100.00 |
$238.18 |
$200.00 |
| 200 | 303(A)1200 |
AGGREGATE BASE TYPE A | 43,481 | CY |
$55.00 |
$39.15 |
$50.00 |
| 210 | 307(K)4200 |
STABILIZED SUBGRADE | 176,612 | SY |
$6.50 |
$4.22 |
$5.00 |
| 220 | 326(A)1200 |
GEOTEXTILE REINFORCEMENT | 157,415 | SY |
$4.00 |
$1.76 |
$2.00 |
| 230 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 92,199 | TON |
$20.00 |
$19.77 |
$27.00 |
| 240 | 407(B)7300 |
TACK COAT | 23,867 | GAL |
$3.00 |
$4.02 |
$2.00 |
| 250 | 408 8100 |
PRIME COAT | 38,675 | GAL |
$3.50 |
$0.2500 |
$2.00 |
| 260 | 409(A)9200 |
FABRIC REINFORCEMENT | 4,797 | SY |
$2.00 |
$4.81 |
$2.00 |
| 270 | 409(B)9300 |
BITUMINOUS BINDER | 960 | GAL |
$4.00 |
$5.43 |
$3.00 |
| 280 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 52,424 | TON |
$70.00 |
$76.85 |
$70.00 |
| 290 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 18,314 | TON |
$75.00 |
$100.14 |
$80.00 |
| 300 | 412 3100 |
COLD MILLING PAVEMENT | 13,191 | SY |
$4.00 |
$2.91 |
$2.00 |
| 310 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 353 | CY |
$25.00 |
$40.17 |
$25.00 |
| 320 | 509(A)0200 |
CLASS AA CONCRETE | 1,085 | CY |
$500.00 |
$673.28 |
$1,350.00 |
| 330 | 509(D)0500 |
CLASS C CONCRETE | 3,798 | CY |
$300.00 |
$252.43 |
$400.00 |
| 340 | 511(A)2200 |
REINFORCING STEEL | 147,743 | LB |
$1.50 |
$1.25 |
$1.25 |
| 350 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 2,033 | TON |
$40.00 |
$33.51 |
$45.00 |
| 360 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 1,897 | TON |
$35.00 |
$35.98 |
$47.00 |
| 370 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 390 | TON |
$30.00 |
$26.06 |
$35.00 |
| 380 | 613(A)5216 |
24" R.C.PIPE CLASS III | 268 | LF |
$95.00 |
$139.67 |
$110.00 |
| 390 | 613(A)5220 |
30" R.C.PIPE CLASS III | 84 | LF |
$110.00 |
$164.11 |
$135.00 |
| 400 | 613(A)5276 |
36" R.C.PIPE CLASS IV | 212 | LF |
$185.00 |
$170.65 |
$140.00 |
| 410 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 848 | LF |
$50.00 |
$57.72 |
$95.00 |
| 420 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 1,076 | LF |
$55.00 |
$67.44 |
$105.00 |
| 430 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 78 | LF |
$75.00 |
$133.48 |
$125.00 |
| 440 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 170 | LF |
$85.00 |
$144.05 |
$135.00 |
| 450 | 613(B)5536 |
48" CORR. GALV. STEEL PIPE | 226 | LF |
$100.00 |
$240.52 |
$180.00 |
| 460 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 268 | LF |
$35.00 |
$70.90 |
$100.00 |
| 470 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 360 | LF |
$60.00 |
$80.77 |
$110.00 |
| 480 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 16 | EA |
$250.00 |
$186.00 |
$600.00 |
| 490 | 613(L)6624 |
28" X 20" PREFAB. CULVERT END SEC., ARCH | 14 | EA |
$300.00 |
$258.34 |
$700.00 |
| 500 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 22 | EA |
$800.00 |
$503.45 |
$1,000.00 |
| 510 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$700.00 |
$798.26 |
$1,200.00 |
| 520 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,500.00 |
$1,515.15 |
$1,900.00 |
| 530 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$3,000.00 |
$1,907.83 |
$2,500.00 |
| 540 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$190,000.00 |
$134,019.48 |
$247,000.00 |
| 550 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 69,553 | SY |
$5.00 |
$5.47 |
$4.00 |
| 560 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,678 | LF |
$4.00 |
$4.41 |
$4.00 |
| 570 | 619(C)6600 |
SAWING PAVEMENT | 13,460 | LF |
$3.00 |
$2.03 |
$3.00 |
| 580 | 624(A)3200 |
FENCE-STYLE WWF | 1,393 | LF |
$10.00 |
$11.24 |
$20.00 |
| 590 | 624(B)3330 |
GATES-STYLE WWF (4.5'HIGH X 10'LONG) | 3 | EA |
$750.00 |
$1,221.45 |
$1,200.00 |
| 600 | 624(B)3340 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 1 | EA |
$800.00 |
$1,343.60 |
$1,400.00 |
| 610 | 624(B)3350 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 1 | EA |
$1,100.00 |
$1,465.74 |
$1,500.00 |
| 620 | 624(B)3360 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 2 | EA |
$900.00 |
$1,587.89 |
$1,700.00 |
| 630 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 33,960 | LF |
$5.00 |
$8.92 |
$12.00 |
| 640 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 145,400 | LF |
$0.1500 |
$0.1200 |
$0.1000 |
| 650 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 4,500 | EA |
$0.8000 |
$0.6100 |
$1.00 |
| 660 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 50,000 | LF |
$0.3000 |
$0.0600 |
$0.1500 |
| 670 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 730 | SD |
$19.10 |
$12.21 |
$3.00 |
| 680 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,410 | SD |
$0.4000 |
$0.4300 |
$1.00 |
| 690 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 21,170 | SD |
$0.7500 |
$0.6100 |
$0.0500 |
| 700 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 18,980 | SD |
$1.50 |
$2.44 |
$2.25 |
| 710 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 21,900 | SD |
$0.8000 |
$0.6100 |
$0.3000 |
| 720 | 880(D)6500 |
VERTICAL PANELS | 186,880 | SD |
$0.1000 |
$0.0600 |
$0.0500 |
| 730 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 51,100 | SD |
$0.3300 |
$0.1200 |
$0.1000 |
| 740 | 880(F)6700 |
DRUMS | 114,610 | SD |
$0.3000 |
$0.0600 |
$0.0500 |
| 750 | 880(G)6805 |
CHANNELIZER CONES | 52,560 | SD |
$0.4200 |
$0.4300 |
$0.1500 |
| 760 | 880(W)7700 |
PILOT CAR | 1 | LSUM |
$12,000.00 |
$10,883.17 |
$10,000.00 |
| 770 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,488 | SD |
$11.25 |
$18.32 |
$10.00 |
| 780 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 52,000 | LF |
$0.2000 |
$0.2600 |
$0.3000 |
| 790 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 31 | EA |
$95.00 |
$61.08 |
$50.00 |
| 800 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$210.00 |
$244.29 |
$300.00 |
| 810 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 125 | SF |
$23.00 |
$21.98 |
$40.00 |
| 820 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 267 | LF |
$11.60 |
$12.21 |
$20.00 |
| 830 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 100,075 | LF |
$0.6500 |
$0.7900 |
$0.6500 |
| 840 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 36 | LF |
$7.50 |
$12.21 |
$15.00 |
| 850 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$500,000.00 |
$147,307.55 |
$235,000.00 |
| 860 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$4,000.00 |
$65,000.00 |
| 870 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$12,000.00 |
$15,000.00 |
| 880 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,375,000.00 |
|
|