Bid tab 210037

Let Jan 21, 2021 · Division 2 · Pushmataha Sign up free

‹ Jan 2021 results

BRIDGE REHABILITATION SH-3: OVER FRAZIER CREEK, 0.4 MILES WEST OF THE SH -147 JUNCTION NEAR RATTAN . PROJECT LENGTH = 0.211 MILE

Let date
Thursday, January 21, 2021
Contract
210037
J/P numbers
33848(04)
District
Division 2
County
Pushmataha
Highway
Limits
BRIDGE REHABILITATION SH-3: OVER FRAZIER CREEK, 0.4 MILES WEST OF THE SH -147 JUNCTION NEAR RATTAN . PROJECT LENGTH = 0.211 MILE
Project number
SBR-264N(073)SB

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,153,066
1 B & B CONSTRUCTION SERVICE J.T., INC. Low bidder $1,831,737 -14.9%
2 HUB Construction, Inc. $1,834,767 -14.8% +0.2%
3 L & N BRIDGE, LLC $1,908,719 -11.3% +4.2%
4 C3 Construction, Inc. $2,027,961 -5.8% +10.7%
5 Built Right Construction, LLC $2,146,738 -0.3% +17.2%
7 BRIDGECO CONTRACTORS, INC. $2,162,558 +0.4% +18.1%
8 CONCRETE SERVICES CORPORATION $2,203,595 +2.3% +20.3%
9 Treas Construction Inc $2,277,701 +5.8% +24.3%

Bid tab: unit prices 76 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 B & B CONSTRUCT…#2 HUB Constructio…#3 L & N BRIDGE, L…#4 C3 Construction…#5 Built Right Con…#7 BRIDGECO CONTRA…#8 CONCRETE SERVIC…#9 Treas Construct…
10201(A)1200 CLEARING AND GRUBBING1LSUM $12,000.00 $13,750.00 $3,500.00 $10,000.00 $8,991.00 $20,000.00 $17,500.00 $26,000.00 $7,140.00
20202(A)2200 UNCLASSIFIED EXCAVATION1,095CY $11.00 $8.80 $11.00 $7.50 $8.35 $12.00 $6.75 $11.25 $5.77
30202(D)2500 UNCLASSIFIED BORROW3,089CY $16.00 $11.00 $15.00 $15.00 $10.92 $15.00 $12.50 $22.00 $12.07
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $13,500.00 $8,800.00 $10,000.00 $5,000.00 $5,648.97 $20,000.00 $7,750.00 $13,500.00 $6,825.00
50221(B)2300 TEMPORARY SILT FENCE2,115LF $3.00 $2.65 $3.50 $2.39 $3.07 $3.50 $2.95 $5.00 $2.51
60221(E)2600 TEMPORARY SILT DIKE112LF $15.00 $11.00 $12.00 $9.89 $12.70 $16.00 $13.00 $30.00 $10.38
70230(A)7200 SOLID SLAB SODDING5,271SY $5.00 $3.00 $3.50 $2.69 $3.46 $4.50 $3.40 $9.00 $2.82
80232(A)9200 SEEDING METHOD A1.08AC $1,500.00 $2,000.00 $500.00 $1,850.00 $2,376.21 $2,000.00 $1,950.00 $4,950.00 $1,942.50
90233(A)0200 VEGETATIVE MULCHING1.08AC $1,750.00 $2,000.00 $350.00 $1,870.00 $2,401.91 $2,000.00 $1,970.00 $4,950.00 $1,963.50
100303(A)1200 AGGREGATE BASE TYPE A1,587CY $55.00 $47.00 $50.00 $45.00 $41.71 $50.00 $55.76 $85.00 $80.38
110326(A)1200 GEOTEXTILE REINFORCEMENT5,118SY $2.00 $2.75 $4.90 $5.00 $5.40 $7.00 $5.60 $2.50 $1.93
120402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E500TON $35.00 $39.00 $25.00 $20.00 $33.61 $50.00 $26.35 $35.00 $22.96
130408 8100 PRIME COAT1,792GAL $4.00 $6.00 $6.75 $6.75 $4.17 $7.00 $12.00 $5.00 $5.39
140414(A)5200 P.C.CONCRETE PAVEMENT(PLACEMENT)1,713SY $25.00 $21.00 $15.00 $30.00 $22.41 $60.00 $52.19 $32.00 $23.79
150414(B)5300 DOWEL JOINTED P.C.C.PAVT.(PLACEMENT)2,453SY $35.00 $28.00 $15.00 $35.00 $33.17 $45.00 $56.56 $40.00 $29.81
160414(G)5800 P.C. CONCRETE FOR PAVEMENT988CY $165.00 $155.00 $181.40 $225.00 $175.23 $165.00 $187.50 $185.00 $194.07
170509(D)0500 CLASS C CONCRETE148.79CY $550.00 $550.00 $300.00 $300.00 $379.39 $500.00 $375.00 $600.00 $472.22
180601(A)1100 TYPE I PLAIN RIPRAP130TON $65.00 $44.00 $60.00 $50.00 $51.87 $75.00 $48.00 $65.00 $37.64
190601(C)1300 TYPE I-A FILTER BLANKET26TON $50.00 $36.00 $46.00 $45.00 $38.47 $50.00 $45.00 $25.00 $26.14
200619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $4,000.00 $5,000.00 $5,000.00 $5,000.00 $2,825.77 $12,000.00 $6,500.00 $8,000.00 $7,875.00
210619(B)6364 REMOVAL OF ASPHALT PAVEMENT3,425SY $7.00 $3.30 $3.00 $2.50 $5.78 $6.00 $10.50 $6.00 $5.25
220619(B)6396 REMOVAL OF GUARDRAIL650LF $4.00 $3.00 $3.00 $2.50 $2.57 $6.50 $4.00 $4.00 $4.20
230619(C)6600 SAWING PAVEMENT56LF $3.00 $6.00 $5.00 $6.00 $2.57 $20.00 $14.00 $8.00 $9.45
240623 1100 (PL)GUARDRAIL CURBING4EA $1,500.00 $1,250.00 $710.00 $800.00 $1,975.47 $2,000.00 $1,850.00 $1,500.00 $1,716.93
250623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE650LF $20.00 $26.50 $25.00 $20.00 $30.83 $21.00 $25.00 $26.00 $25.20
260623(G)1820 GUARDRAIL END TREATMENT (31")4EA $3,000.00 $3,300.00 $3,000.00 $1,600.00 $3,853.33 $3,300.00 $3,250.00 $3,200.00 $3,150.00
270623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,200.00 $1,800.00 $1,650.00 $2,500.00 $2,119.33 $3,300.00 $1,950.00 $1,900.00 $1,732.50
280501(B)1300 SUBSTRUCTURE EXCAVATION COMMON160CY $25.00 $20.00 $20.00 $15.00 $17.98 $20.00 $16.00 $25.00 $31.50
290501(G)1800 CLSM BACKFILL102.3CY $180.00 $180.00 $160.00 $175.00 $161.64 $300.00 $192.00 $150.00 $260.53
300504(A)5200 APPROACH SLAB281.2SY $225.00 $215.00 $215.00 $175.00 $217.72 $240.00 $213.17 $286.00 $217.62
310504(B)5300 SAW-CUT GROOVING985.1SY $5.00 $4.50 $4.66 $3.85 $4.95 $8.00 $4.80 $7.00 $5.09
320504(D)5420 CONCRETE RAIL (TR4)443.4LF $90.00 $125.00 $114.00 $95.00 $105.22 $130.00 $92.00 $125.00 $91.91
330506(A)7200 STRUCTURAL STEEL132,610LB $2.25 $1.79 $2.00 $2.10 $1.83 $1.90 $1.98 $2.00 $3.39
340507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY12EA $2,500.00 $2,700.00 $3,039.00 $3,500.00 $3,367.26 $2,000.00 $2,065.00 $3,500.00 $2,989.00
350507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY24EA $2,750.00 $3,000.00 $3,039.00 $3,500.00 $3,367.26 $2,100.00 $2,358.00 $3,500.00 $2,989.00
360509 0120 ELASTOMERIC COATING686.2SF $15.00 $80.00 $14.00 $9.00 $19.27 $16.00 $19.00 $18.00 $15.75
370509(A)0210 CLASS AA CONCRETE178.7CY $650.00 $800.00 $825.00 $750.00 $889.31 $700.00 $875.00 $647.85 $804.31
380509(B)0320 CLASS A CONCRETE51.7CY $1,000.00 $850.00 $888.00 $1,500.00 $1,582.45 $700.00 $933.40 $1,358.03 $798.61
390511 2100 MECHANICAL SPLICES558EA $55.00 $25.00 $33.00 $45.00 $40.87 $30.00 $58.73 $35.00 $65.97
400511(B)2310 EPOXY COATED REINFORCING STEEL54,360LB $1.25 $1.20 $1.30 $1.27 $1.17 $1.60 $1.21 $1.33 $1.40
410515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)399SY $4.00 $4.00 $4.84 $4.00 $5.14 $7.00 $5.00 $4.00 $5.25
420516(A)8210 DRILLED SHAFTS 24" DIAMETER84LF $400.00 $275.00 $373.00 $300.00 $614.32 $500.00 $718.89 $500.00 $451.34
430516(A)8220 DRILLED SHAFTS 36" DIAMETER138LF $600.00 $573.00 $784.00 $800.00 $743.30 $650.00 $993.94 $600.00 $756.18
440516(C)8400 CROSSHOLE SONIC LOGGING2EA $3,000.00 $2,700.00 $2,500.00 $1,750.00 $2,247.78 $3,000.00 $2,500.00 $4,500.00 $3,675.00
450518(B)0300 SEALED EXPANSION JOINTS43.17LF $250.00 $275.00 $275.00 $250.00 $278.55 $325.00 $323.99 $339.51 $312.91
460520(A)1200 PREPARATION OF CRACKS, ABOVE WATER20LF $25.00 $40.00 $24.19 $30.00 $57.80 $35.00 $48.00 $25.00 $47.25
470520(C)1400 EPOXY RESIN, ABOVE WATER0.3GAL $150.00 $100.00 $241.87 $800.00 $192.67 $125.00 $165.00 $150.00 $157.50
480521(A)2200 PNEUMATICALLY PLACED MORTAR11.3SY $600.00 $700.00 $450.00 $400.00 $1,348.66 $1,000.00 $1,250.00 $950.00 $1,102.50
490523(A)3200 SEALER CRACK PREPARATION203LF $4.00 $3.00 $4.84 $4.00 $5.14 $6.00 $6.00 $4.00 $4.20
500523(B)3300 SEALER RESIN1.7GAL $150.00 $100.00 $181.41 $150.00 $192.67 $125.00 $165.00 $150.00 $157.50
510535 7100 CORROSION INHIBITOR(SURFACE APPLIED)33.2SY $60.00 $35.00 $36.00 $30.00 $64.22 $50.00 $60.00 $60.00 $52.50
520613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND20LF $30.00 $50.00 $20.00 $40.00 $17.60 $30.00 $30.00 $30.00 $21.89
530613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.97LF $25.00 $25.00 $20.00 $25.00 $14.86 $25.00 $25.00 $25.00 $21.89
540619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $75,000.00 $45,000.00 $50,000.00 $40,000.00 $48,950.10 $35,000.00 $96,500.00 $65,000.00 $161,700.00
550413(D)4510 RUMBLE STRIP METHOD PCC-CYC1,800LF $0.3500 $4.50 $4.00 $4.20 $8.88 $2.50 $4.00 $1.00 $3.67
560805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS1EA $240.00 $110.00 $110.00 $100.00 $128.44 $450.00 $125.00 $240.00 $105.00
570853 5175 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)20EA $15.00 $11.00 $10.50 $20.00 $12.84 $15.00 $12.00 $11.00 $10.50
580856(A)8200 TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE)3,520LF $1.25 $1.50 $1.38 $1.38 $1.77 $1.75 $1.46 $2.00 $1.45
590823 6100 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM200SD $150.00 $105.00 $100.00 $95.00 $122.02 $94.00 $99.00 $150.00 $99.75
600857(C)9400 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)288LF $0.5000 $2.20 $2.00 $2.00 $2.57 $7.00 $2.10 $2.20 $2.10
610857(E)9600 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS992EA $1.30 $2.20 $2.00 $2.00 $2.57 $5.50 $2.16 $2.20 $2.10
620857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)300LF $0.1500 $1.10 $1.00 $1.00 $1.28 $6.50 $1.08 $1.10 $1.05
630871(B)2300 CONST.ZONE IMPACT ATTEN.280SD $12.00 $5.50 $5.00 $5.00 $6.42 $28.00 $4.51 $8.00 $5.25
640877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER1,513LF $30.00 $29.00 $30.00 $11.00 $34.68 $21.00 $31.00 $30.00 $28.35
650877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER1,513LF $6.00 $3.15 $4.00 $2.00 $3.72 $4.00 $4.50 $5.00 $3.04
660880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF2,280SD $0.2500 $0.1200 $0.2000 $0.1000 $0.1300 $0.6500 $0.1200 $0.1000 $0.1100
670880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,150SD $0.5000 $3.30 $3.00 $3.00 $3.85 $1.50 $3.18 $3.00 $3.15
680880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,020SD $1.50 $0.0600 $0.1000 $0.0500 $0.0600 $1.50 $0.0800 $0.0500 $0.0500
690880(C)6420 WING BARRICADES800SD $2.00 $0.3000 $0.3000 $0.2500 $0.3200 $0.0200 $0.2800 $0.2500 $0.2600
700880(D)6500 VERTICAL PANELS1,400SD $0.3500 $0.3000 $0.3000 $0.2500 $0.3200 $1.25 $0.2800 $0.2500 $0.2600
710880(E)6600 WARNING LIGHTS(TYPE A)1,480SD $0.1500 $2.20 $2.50 $2.00 $2.57 $1.00 $2.16 $2.00 $2.10
720880(F)6700 DRUMS5,180SD $0.3000 $0.1700 $0.1800 $0.1500 $0.1900 $1.25 $0.1900 $0.1500 $0.1500
730882(A)8210 PORT.CHANGEABLE MESSAGE SIGN428SD $8.00 $11.00 $15.00 $10.00 $12.84 $6.00 $12.00 $15.00 $10.50
740642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $12,000.00 $8,000.00 $10,000.00 $11,559.98 $12,000.00 $17,500.00 $12,500.00 $14,700.00
750220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $3,500.00 $2,500.00 $3,500.00 $1,926.66 $4,000.00 $3,500.00 $5,000.00 $2,625.00
760641 2100 MOBILIZATION1LSUM $123,000.00 $110,000.00 $120,000.00 $120,000.00 $167,791.88 $210,000.00 $92,500.00 $123,000.00 $118,022.90