Bid tab 200158

Let Aug 20, 2020 · Division 1 · Muskogee Sign up free

‹ Aug 2020 results

RESURFACE (ASPHALT ) US-69: FROM 4.5 MILES NORTH OF THE MCINTOSH COUNTY LINE , EXTEND NORTH NEAR OKTAHA . PROJECT LENGTH = 8.000 MILES

Let date
Thursday, August 20, 2020
Contract
200158
J/P numbers
31211(04)
District
Division 1
County
Muskogee
Highway
Limits
RESURFACE (ASPHALT ) US-69: FROM 4.5 MILES NORTH OF THE MCINTOSH COUNTY LINE , EXTEND NORTH NEAR OKTAHA . PROJECT LENGTH = 8.000 MILES
Project number
NHPP-013N(173)PM

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$6,215,090
1 APAC-CENTRAL, INC. Low bidder $6,355,196 +2.3%
2 BECCO CONTRACTORS, INC. $6,537,000 +5.2% +2.9%

Bid tab: unit prices 16 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 APAC-CENTRAL, I…#2 BECCO CONTRACTO…
1402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E3,929TON $18.00 $22.30 $25.00
2407(D) 0401 (SP) NT TACK MATERIAL57,971GAL $3.00 $2.62 $2.90
3411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)18,612TON $80.00 $77.60 $69.00
4411(E) 5980 SUPERPAVE, TYPE S6(PG 76-28 OK)12,233TON $90.00 $91.00 $80.00
5411(J) 6410 (SP) RICH INTERMEDIATE LAYER27,153TON $95.00 $99.00 $110.00
6412 5267 COLD MILLING PAVEMENT74,853SY $2.00 $1.75 $2.50
7413(A) 4861 RUMBLE STRIP-METHOD HMA-CON65,476LF $0.5000 $0.2000 $0.3000
8413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC65,476LF $0.5000 $0.2000 $0.3000
9414(E) 0225 FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY)2,327SY $86.51 $142.85 $85.00
10414(G) 5275 P.C. CONCRETE FOR PAVEMENT520CY $175.00 $131.50 $130.00
11809(A) 8090 ROADWAY LUMINAIRE4EA $7,200.00 $8,220.00 $14,500.00
12856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)202,729LF $1.00 $0.4700 $0.4500
13856(B) 8525 TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.)41EA $250.00 $257.00 $300.00
14880(A) 8812 ARROW DISPLAY(TYPE C)90SD $10.00 $15.50 $10.00
15880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $45,000.00 $165,000.00 $364,779.95
16882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN194SD $30.00 $36.00 $10.00