| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$83,162.40 |
$3,680.60 |
$8,000.00 |
$15,743.79 |
| 2 | 609(B) 1514 |
1'-8" COMB. CURB & GUTTER (8" BARRIER) | 488 | LF |
$25.00 |
$30.63 |
$16.00 |
$29.28 |
| 3 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 810 | SY |
$88.00 |
$66.56 |
$48.00 |
$73.66 |
| 4 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 66 | SY |
$104.00 |
$75.62 |
$75.00 |
$93.59 |
| 5 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 128 | SF |
$29.00 |
$28.95 |
$27.00 |
$25.29 |
| 6 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 509 | LF |
$8.00 |
$4.44 |
$10.00 |
$5.92 |
| 7 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 46 | SY |
$13.00 |
$11.11 |
$10.00 |
$16.39 |
| 8 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 922 | SY |
$12.00 |
$5.65 |
$10.00 |
$9.81 |
| 9 | 619(C) 0924 |
SAWING PAVEMENT | 520 | LF |
$3.00 |
$4.00 |
$2.50 |
$5.44 |
| 10 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$268.60 |
$267.95 |
$350.00 |
$262.50 |
| 11 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 35 | SF |
$25.00 |
$26.80 |
$35.00 |
$26.25 |
| 12 | 851(C) 8324 |
2" SQUARE TUBE POST | 80 | LF |
$20.00 |
$12.86 |
$16.00 |
$12.60 |
| 13 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 86 | LF |
$8.50 |
$25.72 |
$32.00 |
$25.20 |
| 14 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$1,607.70 |
$10,000.00 |
$1,575.00 |
| 15 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,909.10 |
$2,143.61 |
$9,000.00 |
$5,301.42 |
| 16 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$12,264.45 |
$10,000.00 |
$23,297.00 |