| 1 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$4,000.00 |
$25,000.00 |
$5,000.00 |
| 2 | 505(C) 6075 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 870 | SY |
$40.00 |
$32.00 |
$50.00 |
$39.00 |
| 3 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 15 | EA |
$2,000.00 |
$1,400.00 |
$1,200.00 |
$1,450.00 |
| 4 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 15 | EA |
$2,000.00 |
$1,400.00 |
$1,200.00 |
$1,450.00 |
| 5 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$400.00 |
$250.00 |
$275.25 |
$385.00 |
| 6 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$35,000.00 |
$30,000.00 |
$49,250.00 |
$39,266.00 |
| 7 | 501(G) 6309 |
CLSM BACKFILL | 60 | CY |
$300.00 |
$250.00 |
$125.00 |
$280.00 |
| 8 | 504(A) 1304 |
APPROACH SLAB | 176 | SY |
$350.00 |
$300.00 |
$325.00 |
$357.58 |
| 9 | 504(B) 1305 |
SAW-CUT GROOVING | 176 | SY |
$5.00 |
$17.00 |
$18.15 |
$19.00 |
| 10 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 46 | LF |
$35.00 |
$10.00 |
$20.00 |
$48.00 |
| 11 | 505(C) 6075 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 1,600 | SY |
$40.00 |
$32.00 |
$50.00 |
$36.00 |
| 12 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 70 | SY |
$400.00 |
$250.00 |
$275.25 |
$385.00 |
| 13 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$50.00 |
$20.00 |
$15.75 |
$52.00 |
| 14 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$80.00 |
$50.00 |
$125.00 |
| 15 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 20 | SY |
$850.00 |
$565.00 |
$600.15 |
$750.00 |
| 16 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 1 | EA |
$35,000.00 |
$20,000.00 |
$33,063.73 |
$27,400.00 |
| 17 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 2 | EA |
$35,000.00 |
$30,000.00 |
$41,935.80 |
$39,266.00 |
| 18 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 120 | LF |
$35.00 |
$10.00 |
$20.00 |
$32.00 |
| 19 | 505(C) 6075 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY | 740 | SY |
$40.00 |
$35.00 |
$50.00 |
$39.00 |
| 20 | 510(C) 6137 |
SLOPE WALL (4") | 150 | SY |
$250.00 |
$225.00 |
$225.00 |
$280.58 |
| 21 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$400.00 |
$250.00 |
$275.25 |
$385.00 |
| 22 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 20 | SY |
$800.00 |
$350.00 |
$400.00 |
$560.00 |
| 23 | 540 4545 |
(PL)REPAIR BRIDGE ITEM (TYPE D) | 2 | EA |
$35,000.00 |
$18,000.00 |
$25,600.00 |
$29,500.00 |
| 24 | 540 4555 |
(PL)REPAIR BRIDGE ITEM (TYPE E) | 4 | EA |
$35,000.00 |
$12,000.00 |
$14,600.00 |
$29,500.00 |
| 25 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 75 | SD |
$160.00 |
$72.00 |
$79.20 |
$83.00 |
| 26 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 300 | SD |
$10.00 |
$5.00 |
$5.50 |
$5.60 |
| 27 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 950 | LF |
$23.00 |
$41.00 |
$30.00 |
$40.70 |
| 28 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$3.00 |
$10.00 |
$3.00 |
$4.50 |
| 29 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 150 | SD |
$3.00 |
$15.00 |
$16.50 |
$16.80 |
| 30 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,000 | SD |
$0.3500 |
$0.0300 |
$0.0300 |
$0.0500 |
| 31 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,400 | SD |
$0.7500 |
$0.0500 |
$0.0600 |
$0.1000 |
| 32 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,150 | SD |
$1.50 |
$0.0500 |
$0.0600 |
$0.1000 |
| 33 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$0.8500 |
$3.00 |
$3.30 |
$3.45 |
| 34 | 880(C) 8848 |
WING BARRICADES | 900 | SD |
$1.10 |
$0.0500 |
$0.0600 |
$0.1000 |
| 35 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,200 | SD |
$0.3500 |
$0.0200 |
$0.0200 |
$0.0500 |
| 36 | 880(F) 8878 |
DRUMS | 4,200 | SD |
$0.2500 |
$0.1500 |
$0.1700 |
$0.2000 |
| 37 | 880(G) 8890 |
CHANNELIZER CONES | 8,700 | SD |
$0.3000 |
$0.1500 |
$0.1700 |
$0.2000 |
| 38 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 328 | SD |
$13.00 |
$6.00 |
$6.60 |
$7.00 |
| 39 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 250 | LF |
$0.5000 |
$8.00 |
$8.80 |
$6.75 |
| 40 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 250 | LF |
$0.2000 |
$7.00 |
$7.70 |
$7.70 |
| 41 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$84,588.20 |
$66,400.00 |
$99,000.00 |