| 1 | 404(A) 4810 |
POLYMER-MODIFIED EMULSIFIED ASPHALT | 9,924 | GAL |
$4.00 |
$2.85 |
$2.60 |
| 2 | 404(C) 4825 |
TYPE II MINERAL AGGREGATE | 321 | TON |
$100.00 |
$69.24 |
$213.21 |
| 3 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 16,803 | LF |
$0.5000 |
$0.7500 |
$1.00 |
| 4 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 10,511 | LF |
$0.7500 |
$1.07 |
$1.40 |
| 5 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 880 | LF |
$1.25 |
$2.14 |
$2.80 |
| 6 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 214 | LF |
$4.00 |
$5.35 |
$7.00 |
| 7 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 6 | EA |
$85.00 |
$133.75 |
$176.00 |
| 8 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 3 | EA |
$65.00 |
$160.50 |
$211.00 |
| 9 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 29 | EA |
$250.00 |
$214.00 |
$282.00 |
| 10 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 12,800 | LF |
$0.2500 |
$0.5400 |
$0.7000 |
| 11 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$17,800.00 |
$3,200.00 |
| 12 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$12,000.00 |
$16,000.00 |
$33,500.00 |