| 1 | 307(B) 4210 |
CEMENT KILN DUST | 380 | TON |
$50.00 |
$60.00 |
$67.24 |
$42.00 |
| 2 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 13,620 | SY |
$2.40 |
$4.00 |
$3.92 |
$4.50 |
| 3 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 13,620 | SY |
$12.00 |
$30.00 |
$23.14 |
$34.00 |
| 4 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 3,410 | CY |
$99.00 |
$100.00 |
$145.23 |
$126.50 |
| 5 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 4,795 | LF |
$6.00 |
$0.9400 |
$10.22 |
$10.00 |
| 6 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 23 | SY |
$53.00 |
$164.31 |
$328.23 |
$85.00 |
| 7 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 521 | SY |
$53.00 |
$57.04 |
$87.14 |
$85.00 |
| 8 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 58 | SY |
$5.00 |
$37.76 |
$107.32 |
$75.00 |
| 9 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 48 | SF |
$23.00 |
$19.90 |
$50.87 |
$80.00 |
| 10 | 611(G) 5113 |
INLET CI DES. 2 (B) | 3 | EA |
$3,500.00 |
$4,295.48 |
$5,124.76 |
$4,500.00 |
| 11 | 611(G) 5115 |
INLET CI DES. 2 (D) | 1 | EA |
$4,000.00 |
$4,836.86 |
$5,955.32 |
$6,000.00 |
| 12 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 3 | EA |
$5,200.00 |
$4,812.41 |
$6,731.25 |
$5,500.00 |
| 13 | 611(H) 5305 |
ADD'L DEPTH IN INLET CI DES. 2(D) | 1.4 | VF |
$250.00 |
$228.30 |
$917.61 |
$600.00 |
| 14 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 5.8 | VF |
$250.00 |
$227.48 |
$641.45 |
$750.00 |
| 15 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 5.2 | VF |
$350.00 |
$326.10 |
$745.31 |
$750.00 |
| 16 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 6,655 | LF |
$5.00 |
$3.30 |
$5.86 |
$7.00 |
| 17 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 12,870 | SY |
$8.00 |
$9.20 |
$10.83 |
$10.00 |
| 18 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 7 | EA |
$400.00 |
$618.13 |
$675.27 |
$500.00 |
| 19 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,245 | LF |
$0.4500 |
$0.9300 |
$0.9000 |
$0.8800 |
| 20 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 88 | LF |
$2.00 |
$2.15 |
$2.11 |
$2.10 |
| 21 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 14 | EA |
$132.00 |
$107.58 |
$105.20 |
$105.00 |
| 22 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 2 | EA |
$500.00 |
$322.73 |
$315.60 |
$315.00 |
| 23 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 7 | EA |
$206.00 |
$107.58 |
$105.20 |
$105.00 |
| 24 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$11,429.92 |
$19,089.19 |
$40,000.00 |