| 1 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 200 | TON |
$10.00 |
$28.00 |
$34.00 |
$33.36 |
| 2 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 20,300 | TON |
$70.00 |
$72.37 |
$79.10 |
$84.99 |
| 3 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 100 | TON |
$100.00 |
$72.37 |
$212.50 |
$139.68 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 60,000 | SY |
$1.50 |
$0.7500 |
$1.46 |
$0.7400 |
| 5 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 8 | EAGP |
$1,000.00 |
$1,300.00 |
$650.00 |
$976.98 |
| 6 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 432 | LF |
$5.00 |
$1.60 |
$5.60 |
$5.03 |
| 7 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$15.00 |
$17.00 |
$22.50 |
$20.13 |
| 8 | 623(C) 5202 |
BEAM GUARDRAIL THRIE-BEAM SINGLE | 250 | LF |
$60.00 |
$75.00 |
$84.50 |
$75.48 |
| 9 | 623(D) 5203 |
BEAM GUARDRAIL THRIE-BEAM DOUBLE | 100 | LF |
$50.00 |
$72.00 |
$73.00 |
$65.41 |
| 10 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 8 | EA |
$750.00 |
$1,100.00 |
$281.00 |
$251.59 |
| 11 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,200.00 |
$2,200.00 |
$2,530.00 |
$2,264.30 |
| 12 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 42 | EA |
$12.00 |
$9.00 |
$22.50 |
$20.13 |
| 13 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 40 | LF |
$3.00 |
$11.00 |
$11.25 |
$10.06 |
| 14 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 116,100 | LF |
$0.3000 |
$0.3200 |
$0.3500 |
$0.3100 |
| 15 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$6,750.00 |
$80,704.97 |
| 16 | 884(C) 8424 |
REMOVE BRIDGE RAIL & POSTS(CONC.) | 150 | LF |
$10.00 |
$30.00 |
$42.00 |
$124.79 |