RESURFACE (ASPHALT ) SH-45: FROM THE US -281 JUNCTION, EXTEND EAST. PROJECT LENGTH = 4.5 MILES
- Let date
- Thursday, January 20, 2011
- Contract
- 110111
- J/P numbers
- 27398(04)
- District
- Division 6
- County
- Woods
- Highway
- Limits
- RESURFACE (ASPHALT ) SH-45: FROM THE US -281 JUNCTION, EXTEND EAST. PROJECT LENGTH = 4.5 MILES
- Project number
- STPY-176C(173)3P
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | $1,249,914 | ||
| 1 | Venture Corporation dba VCO Paving Low bidder | $1,203,747 | -3.7% | |
| 2 | THE CUMMINS CONSTRUCTION CO., INC. | $1,262,453 | +1.0% | +4.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Venture Corpora… | #2 THE CUMMINS CON… |
|---|---|---|---|---|---|---|---|
| 1 | 202(C) 0184 | UNCLASSIFIED BORROW | 2,500 | CY | $7.00 | $1.00 | $8.95 |
| 2 | 202(G) 0185 | EARTHWORK | 1 | LSUM | $10,000.00 | $20,000.00 | $2,575.00 |
| 3 | 230(A) 2806 | SOLID SLAB SODDING | 18,500 | SY | $4.00 | $1.75 | $1.60 |
| 4 | 407 0250 | TACK COAT | 10,150 | GAL | $3.00 | $2.25 | $3.75 |
| 5 | 411(S4) 5960 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 14,400 | TON | $70.00 | $67.00 | $74.25 |
| 6 | 413(A) 4861 | RUMBLE STRIP-METHOD AC-CON | 47,520 | LF | $0.1000 | $0.1500 | $0.1600 |
| 7 | 855(A) 8812 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 83,160 | LF | $0.7000 | $0.3500 | $0.3600 |
| 8 | 880(J) 8905 | CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM | $7,000.00 | $25,000.00 | $3,100.00 |
| 9 | 641 1552 | MOBILIZATION | 1 | LSUM | $40,000.00 | $100,000.00 | $60,000.00 |