| 1 | 504(C) 6383 |
(PL)SILICONE EXPANSION JOINT | 76 | LF |
$178.00 |
$95.00 |
$50.00 |
$100.00 |
| 2 | 505(D) 6065 |
BRIDGE DECK OVERLAY | 248 | SY |
$170.00 |
$163.70 |
$105.00 |
$105.00 |
| 3 | 505(G) 1000 |
HYDRODEMOLITION | 248 | SY |
$260.00 |
$100.00 |
$150.00 |
$125.00 |
| 4 | 520(A) 6058 |
PREPARATION OF CRACKS ABOVE WATER | 50 | LF |
$55.00 |
$33.00 |
$30.00 |
$30.00 |
| 5 | 520(C) 6060 |
EPOXY RESIN ABOVE WATER | 2 | GAL |
$115.00 |
$80.00 |
$70.00 |
$70.00 |
| 6 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 50 | SY |
$522.00 |
$655.00 |
$600.00 |
$595.00 |
| 7 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 101.5 | LF |
$5.00 |
$6.40 |
$3.40 |
$2.00 |
| 8 | 523(B) 6560 |
(SP) SEALER RESIN | 2.3 | GAL |
$150.00 |
$90.00 |
$65.00 |
$50.00 |
| 9 | 504(C) 6383 |
(PL)SILICONE EXPANSION JOINT | 76 | LF |
$178.00 |
$95.00 |
$50.00 |
$100.00 |
| 10 | 505(D) 6065 |
BRIDGE DECK OVERLAY | 429 | SY |
$170.00 |
$163.70 |
$115.00 |
$105.00 |
| 11 | 505(G) 1000 |
HYDRODEMOLITION | 429 | SY |
$260.00 |
$100.00 |
$145.00 |
$125.00 |
| 12 | 520(A) 6058 |
PREPARATION OF CRACKS ABOVE WATER | 50 | LF |
$55.00 |
$33.00 |
$30.00 |
$30.00 |
| 13 | 520(C) 6060 |
EPOXY RESIN ABOVE WATER | 2 | GAL |
$115.00 |
$80.00 |
$70.00 |
$70.00 |
| 14 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 50 | SY |
$522.00 |
$655.00 |
$600.00 |
$595.00 |
| 15 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 101.5 | LF |
$5.00 |
$6.40 |
$3.40 |
$2.00 |
| 16 | 523(B) 6560 |
(SP) SEALER RESIN | 2.3 | GAL |
$150.00 |
$90.00 |
$65.00 |
$50.00 |
| 17 | 627(O) 4410 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,524 | LF |
$7.50 |
$6.60 |
$6.00 |
$5.00 |
| 18 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,524 | LF |
$32.75 |
$17.60 |
$16.00 |
$25.00 |
| 19 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 10,300 | LF |
$0.6000 |
$0.7000 |
$0.6500 |
$0.8100 |
| 20 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 180 | SD |
$15.00 |
$1.10 |
$1.00 |
$35.00 |
| 21 | 876(C) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 4 | SD |
$150.00 |
$66.00 |
$60.00 |
$175.00 |
| 22 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$14,275.00 |
$12,975.00 |
$34,652.00 |
| 23 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$10.00 |
$5.50 |
$5.00 |
$25.00 |
| 24 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$20,000.00 |
$55,000.00 |
$15,000.00 |