| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 1, 2027 estimated | 35577(04) STP-208C(129)PM | CaddoDivision 7 | SH-58 | Widen & Resurface SH-58: FROM 6.00 MIS. N. OF SH-152, EXTEND N. 5.00 MIS. | $13,300,000 | Planned | ||
| Nov 1, 2027 estimated | 35624(04) NHPP-255N(696)PM | OklahomaDivision 4 | US-62 | Bridge Rehabilitation US-62: OVER CRUTCHO CREEK, 0.1 MILE EAST OF AIR DEPOT BLVD | $1,600,0001 items | Planned | ||
| Nov 1, 2027 estimated | 35645(04) J3-5645(004)PM | GarvinDivision 3 | SH-19 | Widen, Resurface & Bridge SH-19: FROM SH-74, EAST 5.0 MILES | $13,200,0003 items | Planned | ||
| Jan 1, 2028 estimated | 32806(04) J3-2806(004)FP | TexasDivision 6 | US-64 | Grade, Drain & Surface US-64: BEGIN AT JCT OF MAIN STREET IN GUYMON, EXTEND EAST 0.8 MILES TO JCT US-54 | $9,000,000 | Planned | ||
| Jan 1, 2028 estimated | 32806(08) NHPP-017N(277)PM | TexasDivision 6 | US-64 | Crossing Impr. & R/R Signals UPRR CONCRETE SURFACE, DOT 596139E, MILEPOST 472.86 | $60,000 | Planned | ||
| Jan 1, 2028 estimated | 34285(09) J3-4285(009)PM | SeminoleDivision 3 | SH-39 | Money Only SH-39: FROM 1.0 MILE EAST OF POTTAWATOMIE COUNTY LINE, SOUTH AND EAST 1.0 MILE FROM KONAWA ST TO SWAN AVE IN KONAWA | $300,000 | Planned | ||
| Jan 1, 2028 estimated | 34343(04) J3-4343(004)FP | OkmulgeeDivision 1 | US-75 | Grade,Drain,Bridge & Surface US-75: FROM US-62 N 1.02 MI TO SH-56 JCT. | $12,300,0001 items | Planned | ||
| Jan 1, 2028 estimated | 38189(04) J3-8189(004)PM | CoalDivision 3 | US-75 | Resurface US-75: FROM 0.2 MILES NORTH OF SH-3, NORTH 6.35 MILES | $10,300,000 | Planned | ||
| Jan 1, 2028 estimated | 38529(04) J3-8529(004)PM | OkfuskeeSeminoleDivision 3 | I-40 | Resurface I-40: FROM 0.2 MILE WEST OF SEMINOLE COUNTY LINE, EAST 7.3 MILES | $3,000,000 | Planned | ||
| Jan 1, 2028 estimated | 38532(05) J3-8532(005)PM | OkfuskeeDivision 3 | US-62 | Resurface US-62: FROM 7.4 MILES EAST OF LINCOLN COUNTY LINE, EAST 7.0 MILES TO SH-48 | $5,400,000 | Planned | ||
| Feb 1, 2028 estimated | 31865(04) STP-276B(078)PM | WoodsDivision 6 | US-64 | Widen, Resurface & Bridge US-64: BEGIN 3.05 MI EAST OF THE JCT SH-14, EXTEND EAST 8.1 MILES | $19,200,0001 items | Planned | ||
| Feb 1, 2028 estimated | 33845(04) STP-254C(080)PM | OkfuskeeDivision 3 | SH-84 | Widen, Resurface & Bridge SH-84: OVER BAD AND UNNAMED CREEKS, 3.8 & 4.8 MILES EAST OF US-75 | $5,800,0002 items | Planned | ||
| Feb 1, 2028 estimated | 35578(04) J3-5578(004)PM | BeckhamDivision 5 | SH-152 | Bridge & Approaches SH-152: OVER DEEP CREEK, 1.9 MILES EAST OF US-283. | $4,100,0001 items | Planned | ||
| Mar 1, 2028 estimated | 17427(21) NHPP-022N(263)PM | McCurtainDivision 2 | US-70 | Grade,Drain,Bridge & Surface US-70: FROM 15.11 MI EAST OF BROKEN BOW EAST 0.59 MI | $9,400,0001 items | Planned | ||
| Mar 1, 2028 estimated | 27944(04) STP-258B(073)PM | OttawaDivision 8 | SH-69A | Grade,Drain,Bridge & Surface SH-69A: FROM APPROX. 1.65 MILES NORTH OF SH-10, NORTH 1.3 MILES | $4,700,0001 items | Planned | ||
| Mar 1, 2028 estimated | 31100(04) STP-228B(031)PM | GreerDivision 5 | SH-6 | Widen & Resurface SH-6: BEGIN 1.0 MILE NORTH OF SH-9 AND EXTEND NORTH 4.0 MILES. NORTH BOUND LANES ONLY. | $9,300,000 | Planned | ||
| Mar 1, 2028 estimated | 31866(04) J3-1866(004)PM | CoalDivision 3 | SH-48 | Grade, Drain & Surface SH-48: FROM 3.1 MILES NORTH OF SH-31, NORTH 4.6 MILES TO SH-3 | $14,500,000 | Planned | ||
| Mar 1, 2028 estimated | 34255(04) J3-4255(004)FP | HarmonJacksonDivision 5 | US-62 | Widen & Resurface US-62: BEGIN 2.0 MILES WEST OF THE JACKSON C/L AND EXTEND EAST 7.0 MILES. | $16,300,000 | Planned | ||
| Mar 1, 2028 estimated | 35507(04) J3-5507(004)PM | MayesDivision 8 | SH-20 | Safety Improvement SH-20: AT CARBIDE RD 3.5 MILES EAST OF PRYOR | $3,600,000 | Planned | ||
| Mar 1, 2028 estimated | 36241(04) J3-6241(004)PM | OkmulgeeDivision 1 | US-75 | Pavement Rehabilitation US-75: FROM SH-16 N TO TULSA C/L, SB LANES ONLY | $4,700,000 | Planned | ||
| Mar 1, 2028 estimated | 38205(04) J3-8205(004)PM | OklahomaDivision 4 | I-44 | Resurface I-44: FROM SW 74TH STREET IN OKC, EXT SOUTH 1.2 MILES TO SW 89TH ST | $2,900,000 | Planned | ||
| Apr 1, 2028 estimated | 17670(20) J1-7670(020)PM | SequoyahDivision 1 | I-40 | Resurface I-40: I40/US59 INTERCHANGE IN SALLISAW | $1,800,000 | Planned | ||
| Apr 1, 2028 estimated | 33456(04) J3-3456(004)PM | SequoyahDivision 1 | I-40 | Pavement Rehabilitation I-40: FROM 0.15 MI. E OF MP 299 TO 0.35 MI. E OF DWIGHT MISSION RD. | $25,800,000 | Planned | ||
| Apr 1, 2028 estimated | 34354(04) NHPP-264N(107)FP | PushmatahaDivision 2 | SH-3 | Grade,Drain,Bridge & Surface SH-3: FROM JCT US-271, EXTEND E. 1.37 MI | $10,400,0002 items | Planned | ||
| Apr 1, 2028 estimated | 34357(04) J3-4357(004)PM | MuskogeeWagonerDivision 1 | SH-72 | Resurface SH-72: FROM US-64 JCT. N APPROX 4.44 MI | $4,100,000 | Planned | ||
| Apr 1, 2028 estimated | 39375(04) J3-9375(004)PM | CanadianDivision 4 | I-40 | Bridge & Approaches I-40: UNDER NORTH CIMARRON ROAD 7.0 MILES EAST OF US-81 | $15,500,0001 items | Planned | ||
| Apr 1, 2028 estimated | 39428(04) J3-9428(004)PM | HaskellDivision 1 | SH-9 | Resurface SH-9: FROM 1.0 MI E OF SH-2 JCT., EAST 5.0 MI | $1,300,000 | Planned | ||
| May 1, 2028 estimated | 24265(04) SSP-157B(113)SS | OsageDivision 8 | SH-11 | Widen & Resurface SH-11: FROM 2.0 MILES S.E. OF BARNSDALL EXTEND S.E. 3.75 MILES | $10,700,000 | Planned | ||
| May 1, 2028 estimated | 27119(04) J2-7119(004)PM | KayDivision 4 | US-177 | Bridge & Approaches US-177: OVER UNNAMED CREEK 7.3 MILES NORTH OF SH-11 | $1,100,0001 items | Planned | ||
| May 1, 2028 estimated | 32689(04) J3-2689(004)PM | CanadianDivision 4 | I-40 | Bridge & Approaches I-40: COUNTRY CLUB ROAD OVER I-40, 2 MILES WEST OF US-81 | $18,100,0001 items | Planned | ||
| May 1, 2028 estimated | 34261(04) J3-4261(004)PM | BeckhamDivision 5 | SH-6 | Widen, Resurface & Bridge SH-6: BEGIN .1 MI ON THE EAST SIDE OF THE SH-152 JCT & EXTEND EAST 5.4 MI | $13,900,0003 items | Planned | ||
| May 1, 2028 estimated | 38376(04) J3-8376(004)PM | AtokaDivision 2 | US-69 | Intersect Modif US-69: NB/SB AT E FREDS FISH CAMP INTERSECTION IMPROVEMENTS | $1,000,000 | Planned | ||
| May 1, 2028 estimated | 38420(04) J3-8420(004)PM | ChoctawDivision 2 | US-271 | Intersect Modif US-271: NB/SB AT E 2120 RD JCT INTERSECTION IMPROVEMENTS | $1,000,000 | Planned | ||
| May 1, 2028 estimated | 38974(04) J3-8974(004)PM | PottawatomieDivision 3 | US-177 | Resurface US-177: FROM SH-39 NORTH 5.9 MILES TO SH-59 | $3,100,000 | Planned | ||
| May 1, 2028 estimated | 38974(05) J3-8974(005)PM | PottawatomieDivision 3 | US-177 | Resurface US-177: FROM SH-59 NORTH 5.0 MILES TO SH-59B | $3,100,000 | Planned | ||
| May 1, 2028 estimated | 38974(06) J3-8974(006)PM | PottawatomieDivision 3 | US-177 | Resurface US-177: FROM SH-59B NORTH 8.0 MILES TO US-270 | $3,100,000 | Planned | ||
| Jun 1, 2028 estimated | 24131(04) SSP-119C(157)SS | CreekDivision 8 | SH-16 | Grade, Drain & Surface SH-16: FROM 1.0 MILE EAST OF JCT. SH-48S, EAST 4.5 MILES | $15,000,000 | Planned | ||
| Jun 1, 2028 estimated | 24432(08) J2-4432(008)FP | KayDivision 4 | I-35 | Grade, Drain & Surface I-35: FROM 0.5 MILES NORTH OF FORK ROAD, EXTEND NORTH 5.2 MILES TO THE KANSAS STATE LINE | $33,300,000 | Planned | ||
| Jun 1, 2028 estimated | 31004(04) J3-1004(004)PM | NobleDivision 4 | US-64 | Grade,Drain,Bridge & Surface US-64: FROM US-177, EXTEND EAST 5.0 MILES THROUGH MORRISON | $15,700,0001 items | Planned | ||
| Jun 1, 2028 estimated | 31022(04) J3-1022(004)PM | KayDivision 4 | SH-11 | Grade,Drain,Bridge & Surface SH-11: FROM US-77, EXTEND EAST 7 MILES TOWARDS KAW CITY | $19,300,000 | Planned | ||
| Jun 1, 2028 estimated | 35470(04) J3-5470(004)PM | CreekTulsaDivision 8 | SH-67 | Intersect Modif SH-67: FROM US-75A CREEK COUNTY, EXTEND EAST 9.9 MILES TO US-64 (INTERSECTIONS ONLY) | $3,100,000 | Planned | ||
| Jun 1, 2028 estimated | 36262(04) J3-6262(004)PM | NobleDivision 4 | SH-15 | Bridge & Approaches SH-15: OVER UNNAMED CREEK 5.7 MILES EAST OF THE GARFIELD C/L | $1,500,0001 items | Planned | ||
| Jun 1, 2028 estimated | 36353(04) J3-6353(004)PM | OsageDivision 8 | US-64 | Interchange US-64: AT DIAMOND HEAD RD APPROX. 0.5 MILES WEST OF SH-151 | $32,100,000 | Planned | ||
| Jul 1, 2028 estimated | 24266(04) SSP-157B(116)SS | OsageDivision 8 | SH-11 | Widen & Resurface SH-11: FROM 9.0 MI S.E. OF BARNSDALL EXTEND S.E. 4.96 MILE TO THE WASHINGTON C/L | $13,600,000 | Planned | ||
| Jul 1, 2028 estimated | 24351(04) STP-174B(058)PM | TulsaWashingtonDivision 8 | SH-11 | Widen, Resurface & Bridge SH-11: FROM THE OSAGE C/L EAST & SOUTH 3.33 MI | $15,500,0001 items | Planned | ||
| Jul 1, 2028 estimated | 24356(07) J2-4356(007)PM | OklahomaDivision 4 | SH-66 | Grade, Drain & Surface SH-66: FROM 5.6 MILES EAST OF I-35 AND EXTEND EAST 1 MILE THROUGH ARCADIA | $4,000,000 | Planned | ||
| Jul 1, 2028 estimated | 27123(04) J2-7123(004)PM | KayDivision 4 | US-177 | Bridge & Approaches US-177: OVER UNNAMED CREEK 5.6 MILES NORTH OF SH-11 | $900,0001 items | Planned | ||
| Jul 1, 2028 estimated | 35186(04) NHPP-022N(253)FP | BryanDivision 2 | US-70 | Grade, Drain & Surface US-70: RAMPS AT EAST MAIN STREET IN DURANT, APPROX 3.0 MI EAST OF SH-78 | $2,700,000 | Planned | ||
| Jul 1, 2028 estimated | 35582(04) J3-5582(004)PM | BeckhamDivision 5 | I-40 | Resurface I-40: FROM MP 0.00 TO MP 7.82. | $15,300,000 | Planned | ||
| Aug 1, 2028 estimated | 24322(07) STP-259C(079)PM | PawneeDivision 8 | US-64 | Grade, Drain & Surface US-64: FROM JCT. SH-18 EAST 4.2 MILES | $18,800,000 | Planned | ||
| Aug 1, 2028 estimated | 28029(04) STP-211C(087)PM | CherokeeDivision 1 | SH-100 | Bridge & Approaches SH-100: OVER DRY CREEK, 0.5 MILES EAST OF JCT SH-82 | $14,200,0001 items | Planned | ||
| Aug 1, 2028 estimated | 28894(04) J2-8894(004)PM | DelawareOttawaDivision 8 | US-59 | Grade, Drain & Surface US-59: FROM SAILBOAT BRIDGE TO JCT OF SH-125 | $20,500,000 | Planned | ||
| Aug 1, 2028 estimated | 29571(04) J2-9571(004)PM | McClainDivision 3 | SH-74 | Interchange SH-74: AT I-35, 2.8 MI SOUTH OF CLEVELAND COUNTY LINE | $21,300,0001 items | Planned | ||
| Aug 1, 2028 estimated | 29849(04) J2-9849(004)PM | KingfisherDivision 4 | US-81 | Bridge & Approaches US-81: NB & SB BRIDGES OVER THE UP RAILROAD 5.3 MILES NORTH OF SH-33 | $21,600,0002 items | Planned | ||
| Aug 1, 2028 estimated | 31066(04) STP-276B(077)PM | WoodsDivision 6 | US-281 | Widen & Resurface US-281: BEGIN AT THE JCT SH-14, EXTEND EAST 7.9 MILES | $18,000,000 | Planned | ||
| Aug 1, 2028 estimated | 31966(04) J3-1966(004)PM | TulsaDivision 8 | SH-151 | Grade, Drain & Surface SH-151: FROM SH-51 TO US-64 | $12,700,000 | Planned | ||
| Aug 1, 2028 estimated | 35092(04) J3-5092(004)PM | RogersDivision 8 | SH-167 | Intersect Modif SH-266/SH-167: INTERSECTION IMPROVEMENTS | $8,100,000 | Planned | ||
| Aug 1, 2028 estimated | 35485(04) STP-258B(111)PM | OttawaDivision 8 | SH-69A | Resurface SH-69A: E066 NORTH 1.66 MILES TO US-69 | $900,000 | Planned | ||
| Aug 1, 2028 estimated | 35789(04) STP-258B(090)PM | OttawaDivision 8 | SH-69A | Widen & Resurface SH-69A: BEGIN 2.9 MILES NORTH OF SH-10 EXTEND NORTH .60 MILES TO E 066 RD | $2,300,000 | Planned | ||
| Sep 1, 2028 estimated | 24428(13) J2-4428(013)PM | GradyDivision 7 | 00PHWY | Interchange US-81 REALIGNMENT: QUAIL ROAD INTERCHANGE INCLUDES BR. A,B,C & D (PHASE 3) | $45,000,000 | Planned | ||
| Sep 1, 2028 estimated | 30447(04) J3-0447(004) | KingfisherDivision 4 | SH-51 | Widen, Resurface & Bridge SH-51: FROM THE LOGAN C/L, EXTEND WEST 4.9 MILES | $13,000,0001 items | Planned | ||
| Sep 1, 2028 estimated | 34262(04) J3-4262(004)PM | GradyDivision 7 | SH-4 | Interchange SH-4: AT FOX LANE (EW 122) 2.24 MIS. N. OF I-44 | $15,700,000 | Planned | ||
| Sep 1, 2028 estimated | 34333(04) NHPP-245N(084)FP | McCurtainDivision 2 | US-259 | Grade,Drain,Bridge & Surface US-259: FROM 8.25 MI N. OF JCT SH-3, EXTEND N. 4.00 MI | $58,600,0001 items | Planned | ||
| Sep 1, 2028 estimated | 35161(04) J3-5161(004)PM | GradyDivision 7 | SH-4 | Grade,Drain,Bridge & Surface SH-4: FROM H.E. BAILEY TPK., N. 5.26 MIS. TO SH-37 | $29,200,0001 items | Planned | ||
| Sep 1, 2028 estimated | 35492(04) STP-258B(114)PM | OttawaDivision 8 | SH-69A | Widen & Resurface SH-69A: FROM 0.60 MILES NORTH OF JCT. SH-69A/SH-10 1.65 MILES | $9,800,000 | Planned | ||
| Sep 1, 2028 estimated | 38610(04) NHPP-008N(112)PM | TexasDivision 6 | US-54 | Safety Improvement US-54: TRAFFIC SIGNAL AT US-54 & SW 5TH STREET | $700,000 | Planned | ||
| Nov 1, 2028 estimated | 27076(04) J2-7076(004)PM | CaddoDivision 7 | US-62 | Grade,Drain,Bridge & Surface US-62: FROM JCT. SH-9 EXTENDING E 6.15 MILES TO CURB SECTION IN ANADARKO | $30,000,0001 items | Planned | ||
| Nov 1, 2028 estimated | 30390(06) J3-0390(006)PM | GarvinDivision 3 | I-35 | Grade,Drain,Bridge & Surface I-35: FROM 4.2 MILES NORTH OF SH-7, NORTH 6.2 MILES TO SH-29 (SOUTHBOUND ONLY) | $49,600,0003 items | Planned | ||
| Nov 1, 2028 estimated | 35217(04) J3-5217(004)PM | LincolnDivision 3 | SH-66 | Bridge & Approaches SH-66: OVER SLWC RAILROAD, 0.9 MILES EAST OF SH-18 | $2,300,0001 items | Planned | ||
| Jan 1, 2029 estimated | 33827(04) J3-3827(004)PM | DelawareDivision 8 | SH-10 | Grade,Drain,Bridge & Surface SH-10: FROM US-59 EXTEND EAST TO SH-25 | $18,900,0001 items | Planned | ||
| Jan 1, 2029 estimated | 35156(04) J3-5156(004)PM | TulsaDivision 8 | US-169 | Bridge & Approaches US-169: UNDER E. 96TH STREET. APPROX. 5 MILES NORTH OF SH-266 | $9,400,0001 items | Planned | ||
| Feb 1, 2029 estimated | 33772(04) J3-3772(004)PM | OklahomaDivision 4 | SH-74 | Interchange SH-74:FROM 164TH ST.TO 192ND ST. | $21,200,000 | Planned | ||
| Feb 1, 2029 estimated | 35702(04) J3-5702(004)PM | MurrayDivision 7 | SH-7 | Pavement Rehabilitation SH-7: FROM 0.52 MIS. E. OF SH-7 SPUR, EXTEND E. 1.52 MIS. IN SULPHUR | $10,500,000 | Planned | ||
| Feb 1, 2029 estimated | 35773(04) J3-5773(004)PM | CimarronDivision 6 | SH-325 | Bridge & Approaches SH-325: OVER S CARRIZO CREEK, 9.8 MI EAST OF THE NEW MEXICO S/L | $4,800,0001 items | Planned | ||
| Mar 1, 2029 estimated | 28993(04) J2-8993(004)PM | KayDivision 4 | US-60B | Bridge & Approaches US-60B: EB & WB OVER BOIS D' ARC CREEK 0.5 MIS. E. OF THE US-60 JCT. | $6,900,0002 items | Planned | ||
| Mar 1, 2029 estimated | 29529(05) J2-9529(005)PM | DeweyDivision 5 | SH-34 | Money Only SH-34: MONEY PLACE HOLDER | $1,500,000 | Planned | ||
| Mar 1, 2029 estimated | 29871(04) NHPPI-3500-(110)PM | OklahomaDivision 4 | I-35 | Pavement Rehabilitation I-35: FROM I-44, EXTEND NORTH 4.3 MILES TO THE KILPATRICK TURNPIKE | $8,300,000 | Planned | ||
| Mar 1, 2029 estimated | 31012(04) J3-1012(004)PM | PayneDivision 4 | SH-51 | Grade,Drain,Bridge & Surface SH-51: FROM WESTERN ROAD, EXTEND EAST TO US-177 | $31,200,000 | Planned | ||
| Mar 1, 2029 estimated | 34248(04) J3-4248(004)PM | BeckhamDivision 5 | SH-152 | Widen, Resurface & Bridge SH-152: BEGIN 1.5 MILES EAST OF I-40 AND EXTEND EAST 5.0 M TO SH-34. | $18,800,0003 items | Planned | ||
| Mar 1, 2029 estimated | 35882(04) J3-5882(004)PM | Le FloreDivision 2 | US-0 | Intersect Modif US-59B: AT PLEASANT VALLEY ROAD, APPROX 0.6 MI NORTH OF JCT US-59 (POTEAU BYPASS) INTERSECTION IMPROVEMENTS | $500,000 | Planned | ||
| Mar 1, 2029 estimated | 36409(04) NHPP-019N(172)PM | RogersDivision 8 | US-412 | Interchange US-412: AT 4190RD APPROX. 1.50 MILES WEST OF SH-88. | $26,000,000 | Planned | ||
| Apr 1, 2029 estimated | 30503(04) J3-0503(004)PM | LoganDivision 4 | SH-74 | Pavement Rehabilitation SH-74: FROM ADAMS STREET, EXTEND SOUTH 0.5 MILES IN CRESCENT | $10,000,000 | Planned | ||
| Apr 1, 2029 estimated | 35563(04) J3-5563(004)PM | GreerDivision 5 | SH-9 | Widen, Resurface & Bridge SH-9: BEGIN AT THE US-283 JCT & EXT EAST 6.2 MILES. | $16,800,0007 items | Planned | ||
| May 1, 2029 estimated | 21720(04) STP-169B(100)SS | StephensDivision 7 | SH-53 | Grade,Drain,Bridge & Surface SH-53: FROM 6.08 MI EAST OF THE COTTON C/L, EAST APPROX 4.0 MI TO 5TH ST. INTERSECTION | $14,100,0002 items | Planned | ||
| May 1, 2029 estimated | 31013(06) NHPPI-STIM-(006)SS | OklahomaDivision 4 | I-240 | Pavement Rehabilitation I-240: FROM 0.2 MILES EAST OF I-35, EXTEND EAST 5.8 MILES TO AIR DEPOT | $2,400,000 | Planned | ||
| May 1, 2029 estimated | 33361(04) NHPP-277N(058)PM | WoodwardDivision 6 | SH-34 | Grade, Drain & Surface SH-34: BEGIN AT JCT US-412, EXTEND NORTH 0.8 MI | $10,600,000 | Planned | ||
| May 1, 2029 estimated | 33361(08) NHPP-277N(050)PM | WoodwardDivision 6 | SH-34 | Crossing Impr. & R/R Signals BNSF RAILROAD SURFACE, DOT 014439M, MP 387.77 | $120,000 | Planned | ||
| May 1, 2029 estimated | 34969(04) J3-4969(004)FP | HarmonDivision 5 | US-62 | Bridge & Approaches US-62: AT THE WEST FORK OF SANDY CREEK, LOCATED 0.3 M EAST OF THE TEXAS STATE LINE. | $4,200,0001 items | Planned | ||
| May 1, 2029 estimated | 35629(04) J3-5629(004)PM | OklahomaDivision 4 | I-240 | Bridge Rehabilitation I-240: OVER EASTERN AVE, 1.0 MILE EAST OF I-35 | $3,000,0002 items | Planned | ||
| May 1, 2029 estimated | 38443(04) SSP-263C(117)PM | PottawatomieDivision 3 | SH-18 | Intersection Safety Improvement SH-18: AT GARRETT'S LAKE RD, 1.5 MILES NORTH OF I-40 | $1,500,000 | Planned | ||
| Jun 1, 2029 estimated | 34368(04) J3-4368(004)PM | PittsburgDivision 2 | US-69 | Pavement Rehabilitation US-69: FROM 0.24 MI S. OF JCT US-69B, EXTEND N. 1.20 MI. | $2,900,000 | Planned | ||
| Jun 1, 2029 estimated | 35115(04) J3-5115(004)PM | TulsaDivision 8 | US-169 | Pavement Rehabilitation US-169: FROM 51ST STREET EXT. NORTH 3.64 MILES | $84,400,000 | Planned | ||
| Jun 1, 2029 estimated | 35681(04) J3-5681(004)PM | CanadianDivision 4 | SH-4 | Intersect Modif SH-4: FROM THE NW EXPRESSWAY EXT NORTH APPROX 3.5 MI TO KINGFISHER C/L | $5,300,000 | Planned | ||
| Jul 1, 2029 estimated | 31020(04) J3-1020(004)PM | LoganPayneDivision 4 | I-35 | Bridge Rehabilitation I-35: NB AND SB BRIDGES OVER THE CIMARRON RIVER AT THE LOGAN/PAYNE CL | $5,800,0002 items | Planned | ||
| Jul 1, 2029 estimated | 33771(04) NHPPI-3500-(209)FP | OklahomaDivision 4 | I-35 | Grade, Drain & Surface I-35: SOUTHBOUND BETWEEN MEMORIAL ROAD AND NE 122ND STREET, 4 MILES NORTH OF I-44/I-35 INTERCHANGE | $27,600,000 | Planned | ||
| Jul 1, 2029 estimated | 34256(04) J3-4256(004)PM | BeckhamDivision 5 | I-40 | Resurface I-40: BEGIN AT MP 25.1 AND EXT TO MP 32.6. | $17,000,000 | Planned | ||
| Jul 1, 2029 estimated | 34336(04) J3-4336(004)PM | JohnstonDivision 3 | SH-7 | Widen & Resurface SH-7/SH-1: FROM 1.3 MILES EAST OF MURRAY COUNTY LINE, SOUTH 7.2 MILES | $21,800,000 | Planned | ||
| Jul 1, 2029 estimated | 34832(04) J3-4832(004)PM | CanadianDivision 4 | SH-3A | Resurface SH-3: FROM SH-4, EXTEND SE TO HEFNER RD/JKT RAMP. | $5,800,000 | Planned | ||
| Jul 1, 2029 estimated | 36141(04) J3-6141(004)PM | BeckhamDivision 5 | I-40B | Bridge & Approaches I-40B: OVER W FORK OF ELK CR, 4.0 MILES NE OF THE WEST I-40 JCT IN ELK CITY. | $3,000,0001 items | Planned | ||
| Jul 1, 2029 estimated | 39426(04) J3-9426(004)PM | RogersDivision 8 | SH-167 | Intersect Modif SH-167: AT PINE ST. IN CATOOSA, 1.0 MILE NORTH OF I-44 | $3,700,000 | Planned |
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.