| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| FY 2031 | 33874(04) J3-3874(004)PM | PushmatahaDivision 2 | SH-3 | Grade,Drain,Bridge & Surface SH-3: FROM 2.0 MI EAST JCT. US-271, EXT. EAST APPROX 5.22 MI | $20,000,0003 items | Planned | ||
| FY 2031 | 34224(04) J3-4224(004)PM | TulsaDivision 8 | SH-20 | Grade,Drain,Bridge & Surface SH-20: EAST FROM SH-11 TO 0.09 MILES EAST OF US-75 | $16,800,000 | Planned | ||
| FY 2031 | 34238(04) J3-4238(004)PM | WashitaDivision 5 | SH-54B | Bridge & Approaches SH-54B: AT AN UNNAMED CREEK LOCATED 2.6 M EAST OF SH-54. | $1,400,0001 items | Planned | ||
| FY 2031 | 34246(04) J3-4246(004)PM | GarvinDivision 3 | SH-76 | Bridge & Approaches SH-76: OVER UNNAMED CREEK, 4.8 MILES NORTH OF CARTER COUNTY LINE | $2,900,0002 items | Planned | ||
| FY 2031 | 34263(04) J3-4263(004)PM | BeckhamRoger MillsDivision 5 | US-283 | Widen & Resurface US-283: BEGIN 350' NORTH OF SH-6 JCT AND EXTEND NORTH 3.3 MILES. | $6,900,000 | Planned | ||
| FY 2031 | 34345(04) J3-4345(004)FP | WagonerDivision 1 | SH-72 | Pavement Rehabilitation SH-72: FROM 0.3 MI N OF SH-51B JCT. IN COWETA, N 0.4 MI | $2,000,000 | Planned | ||
| FY 2031 | 34353(04) J3-4353(004)PM | MuskogeeWagonerDivision 1 | SH-16 | Resurface SH-16: FROM 0.46 MI S OF ARKANSAS RIVER, N 4.9 MI TO SH-16/ SH-251A JCT. | $2,500,000 | Planned | ||
| FY 2031 | 34371(04) J3-4371(004)PM | MuskogeeDivision 1 | SH-10 | Bridge Rehabilitation SH-10: OVER BIG GREEN LEAF CREEK | $5,000,0001 items | Planned | ||
| FY 2031 | 34968(04) J3-4968(004)PM | WoodwardDivision 6 | SH-34 | Widen, Resurface & Bridge SH-34: BEGIN AT THE JCT US-183, EXTEND SOUTH 5.22 MI | $9,300,0001 items | Planned | ||
| FY 2031 | 35061(04) J3-5061(004)PM | BeckhamDivision 5 | SH-6 | Widen, Resurface & Bridge SH-6: BEGIN 5.6 MILES EAST OF SH-152 AND EXT EAST 5.2 MILES TO US-283. | $12,000,0003 items | Planned | ||
| FY 2031 | 35117(04) J3-5117(004)PM | OsageDivision 8 | SH-18 | Widen & Resurface SH-18: FROM RALSTON TO FAIRFAX | $8,000,000 | Planned | ||
| FY 2031 | 35122(04) NHPPI-2400-(008)PM | OklahomaDivision 4 | I-240 | Resurface I-240: FROM 0.21 MILES EAST OF I-44, EXT EAST 3.32 MI EAST TO BRIDGE OVER SANTA FE BOTH DIRECTIONS. | $4,000,000 | Planned | ||
| FY 2031 | 35123(04) J3-5123(004)FP | OklahomaDivision 4 | I-35 | Pavement Rehabilitation I-35: FROM I40/35 JCT, EXT SOUTH APPX 6 MILES TO SE 89TH STREET (CLEV. CL) | $7,000,000 | Planned | ||
| FY 2031 | 35124(04) J3-5124(004)PM | NobleDivision 4 | I-35 | Resurface I-35: FROM MM 179, EXTEND NORTH TO MM 185 | $5,000,000 | Planned | ||
| FY 2031 | 35162(04) J3-5162(004)PM | MurrayDivision 7 | US-177 | Grade,Drain,Bridge & Surface US-177: FROM 8.9 MIS. N. OF THE CARTER C/L N. 2.3 MIS. | $15,200,0001 items | Planned | ||
| FY 2031 | 35429(04) J3-5429(004)PM | WashitaDivision 5 | SH-55 | Widen, Resurface & Bridge SH-55: BEGIN .54 MILES EAST OF SH-44 AND EXTEND EAST 5.9 MILES | $11,500,0001 items | Planned | ||
| FY 2031 | 35430(04) J3-5430(004)PM | GreerDivision 5 | US-283 | Widen, Resurface & Bridge US-283: BEGIN 2.0 MILES N OF THE SH-9 NORTH JCT & EXT N 6.0 MILES. | $8,500,0002 items | Planned | ||
| FY 2031 | 35462(04) J3-5462(004)PM | TulsaDivision 8 | US-75 | Bridge & Approaches US-75: AT 96TH STREET NORTH 10.3 MILES NORTH OF I-244 | $5,000,000 | Planned | ||
| FY 2031 | 35464(04) J3-5464(004)PM | TulsaDivision 8 | US-75 | Bridge & Approaches US-75: AT 126TH STREET NORTH, 2 MILES SOUTH OF SH-20 JCT. | $5,000,000 | Planned | ||
| FY 2031 | 35513(04) J3-5513(004)PM | TulsaDivision 8 | US-64 | Grade,Drain,Bridge & Surface US-64: FROM SOUTH MINGO ROAD EXTEND EAST APPROX. 6.39 MILES TO WAGONER C/L | $29,400,000 | Planned | ||
| FY 2031 | 35561(04) J3-5561(004)PM | KiowaDivision 5 | SH-9 | Widen, Resurface & Bridge SH-9: BEGIN AT THE SH-44 WEST JCT & EXT EAST 7.85 MILES. | $9,100,0002 items | Planned | ||
| FY 2031 | 35564(04) J3-5564(004)PM | CusterDivision 5 | SH-33 | Widen, Resurface & Bridge SH-33: BEGIN 4.5 MILES EAST OF US-183 & EXT NE 8.0 MILES. | $17,100,0004 items | Planned | ||
| FY 2031 | 35581(04) J3-5581(004)PM | KiowaDivision 5 | SH-44 | Widen, Resurface & Bridge SH-44: BEGIN 0.15 MI SW OF SH-44A / SH-44 JCT, EXT NE APPROX 2.30 MI. | $7,300,0001 items | Planned | ||
| FY 2031 | 35584(04) J3-5584(004)PM | GradyDivision 7 | SH-37 | Grade,Drain,Bridge & Surface SH-37: FROM 0.83 MIS. W. OF SH-92, EXTEND E. 0.83 MIS. | $4,400,000 | Planned | ||
| FY 2031 | 35645(05) J3-5645(005)PM | GarvinDivision 3 | SH-19 | Widen, Resurface & Bridge SH-19: FROM 5.0 MILES EAST OF SH-74, EAST 4.3 MILES | $11,400,0001 items | Planned | ||
| FY 2031 | 35691(04) J3-5691(004)PM | CaddoDivision 7 | US-281 | Bridge & Approaches US-281: OVER WILDCAT & FLAT DRAW CREEKS, APPROX. 0.52 MIS. & 0.64 MIS. W. OF JCT US-281/SH-152E | $5,200,0002 items | Planned | ||
| FY 2031 | 35743(04) J3-5743(004)PM | HarperDivision 6 | US-283 | Widen, Resurface & Bridge US-283: BEGIN AT JCT US-270, EXTEND NORTH 7.0 MI (THRU LAVERNE) | $19,300,0001 items | Planned | ||
| FY 2031 | 35746(04) J3-5746(004)PM | EllisDivision 6 | US-60 | Widen, Resurface & Bridge US-60: BEGIN 0.5 MI EAST OF JCT US-283, EXTEND 6.5 MI EAST TO JCT OF US-283 (EAST OF ARNETT) | $14,000,0003 items | Planned | ||
| FY 2031 | 35780(04) J3-5780(004)PM | TulsaDivision 8 | SH-11 | Pavement Rehabilitation SH-11: FROM ERIE AVE. EXTEND EAST TO I-244 | $51,600,000 | Planned | ||
| FY 2031 | 35781(04) J3-5781(004)PM | SequoyahDivision 1 | I-40 | Pavement Rehabilitation I-40: CONCRETE PATCHING, FROM APPROX 1.4 MI W OF US-64B, EXTEND E TO MM-325 | $8,300,000 | Planned | ||
| FY 2031 | 35851(04) J3-5851(004)PM | CanadianDivision 4 | US-270 | Widen, Resurface & Bridge US-270: FROM THE KINGFISHER C/L IN GEARY, EXTEND EAST 8 MILES TO N.MAPLE NEAR CALUMET | $25,300,000 | Planned | ||
| FY 2031 | 35854(04) J3-5854(004)PM | LoganDivision 4 | I-35 | Resurface I-35: FROM TRIPLETT RD. EXT NORTH APPROX 1 MI TO MM156 | $10,000,000 | Planned | ||
| FY 2031 | 36179(04) J3-6179(004)PM | LincolnDivision 3 | US-177 | Bridge & Approaches US-177: OVER BELLCOW CREEK, 6.2 MILES NORTH OF SH-66 | $2,200,0001 items | Planned | ||
| FY 2031 | 36220(04) J3-6220(004)PM | CimarronDivision 6 | US-287 | Resurface US-287: BEGIN AT TEXAS S/L, EXTEND NW 6.12 MILES | $8,000,000 | Planned | ||
| FY 2031 | 36228(04) J3-6228(004)PM | MajorDivision 6 | SH-8 | Widen, Resurface & Bridge SH-08: BEGIN 3.4 MI WEST JCT SH-58, EXTEND WEST 4.0 MI TOWARDS FAIRVIEW | $8,500,0001 items | Planned | ||
| FY 2031 | 36230(04) J3-6230(004)PM | WoodsDivision 6 | US-64 | Bridge Rehabilitation US-64: OVER UNNAMED CREEK (ALVA). 0.5 MI WEST JCT US-281 | $700,0001 items | Planned | ||
| FY 2031 | 36247(04) J3-6247(004)SB | PayneDivision 4 | SH-33 | Bridge Rehabilitation SH-33: OVER EUCHEE CREEK; APPROX. 5.1 MILES EAST OF JCT OF SH-18 | $1,000,0001 items | Planned | ||
| FY 2031 | 36256(04) J3-6256(004)PM | OklahomaDivision 4 | I-240 | Bridge Rehabilitation I-240: UNDER DOUGLAS BLVD; APPROX 7 MILES EAST OF JCT OF I-35 | $2,600,0002 items | Planned | ||
| FY 2031 | 36257(04) J3-6257(004)PM | OklahomaDivision 4 | I-240 | Bridge Rehabilitation I-240: UNDER HIWASSEE ROAD; APPROX 11.2 MILES EAST OF JCT OF I-35 | $3,000,0001 items | Planned | ||
| FY 2031 | 36300(04) J3-6300(004)PM | KayDivision 4 | I-35 | Resurface I-35: FROM MM224 TO MM230 | $8,000,000 | Planned | ||
| FY 2031 | 36323(04) J3-6323(004)PM | TulsaDivision 8 | US-75 | Bridge Rehabilitation US-75: AT BIRD CREEK AND BIRD CREEK OVERFLOW AND ROAD UNDER | $5,000,0004 items | Planned | ||
| FY 2031 | 38202(04) J3-8202(004)PM | KayDivision 4 | US-77 | Grade, Drain & Bridge US-77: OVER BNSF RR, 1 MILE NORTH OF PONCA CITY | $30,000,0001 items | Planned | ||
| FY 2031 | 38232(04) J3-8232(004)PM | CarterDivision 7 | I-35 | Interchange I-35: FROM MM 32.38, N. 1.72 MIS. TO MM 34.10 | $43,000,0002 items | Planned | ||
| FY 2031 | 38344(04) J3-8344(004)PM | HaskellDivision 1 | Safety Improvement HASKELL COUNTY SAFETY IMPROVEMENT | $150,000 | Planned | |||
| FY 2031 | 38347(04) J3-8347(004)PM | PittsburgDivision 2 | US-270 | Bridge Rehabilitation US-270: OVER RR, 11.3 MI EAST OF US-69B JCT | $3,100,0001 items | Planned | ||
| FY 2031 | 38351(04) J3-8351(004)PM | McCurtainDivision 2 | SH-3 | Bridge Rehabilitation SH-3: OVER LITTLE RIVER, 2.5 MI EAST OF PUSH C/L | $4,000,0001 items | Planned | ||
| FY 2031 | 38596(04) J3-8596(004)PM | TulsaDivision 8 | US-75 | Bridge Rehabilitation US-75: UNDER W. 96TH STREET SOUTH | $4,500,000 | Planned | ||
| FY 2032 | 18835(09) J1-8835(009)PM | MarshallDivision 2 | 00PHWY | Grade,Drain,Bridge & Surface US-70: MADILL REALIGNMENT FROM 2.0 MI EAST & SOUTH OF SH-199, SOUTH 2.8 MI | $20,200,000 | Planned | ||
| FY 2032 | 20288(04) SSP-157B(046)SS | OsageDivision 8 | SH-11 | Grade,Drain,Bridge & Surface SH-11: FR BARNSDALL, EXTEND SOUTHEAST APPROX. 2.0 MILES | $16,100,0002 items | Planned | ||
| FY 2032 | 21007(10) J2-0040(010)FP | PottawatomieDivision 3 | I-40 | Grade,Drain,Bridge & Surface I-40: FROM 2.5 MILES EAST OF THE OKLAHOMA COUNTY LINE, EAST 2.2 MILES | $42,800,0004 items | Planned | ||
| FY 2032 | 24322(04) J2-4322(004)PM | PawneeDivision 8 | US-64 | Grade,Drain,Bridge & Surface US-64: FROM APPROX. 4.2 MILES EAST OF SH-18 EAST 2.3 MILES | $12,000,0002 items | Planned | ||
| FY 2032 | 24382(04) SSP-149C(107)SS | MayesDivision 8 | SH-28 | Grade,Drain,Bridge & Surface SH-28: BEGIN US-69/SH-28 JCT. AND EXTEND EAST 7.0 MILES | $39,200,0002 items | Planned | ||
| FY 2032 | 24432(05) J2-4432(005)PM | KayDivision 4 | I-35 | Grade, Drain & Surface I-35: FROM THE SALT FORK RIVER, EXTEND NORTH 6.0 MILES TO HUBBARD ROAD | $41,600,000 | Planned | ||
| FY 2032 | 27978(06) J2-7978(006)PM | PayneDivision 4 | SH-51 | Grade, Drain & Surface SH-51: FROM THE EAST SIDE OF YALE, EXTEND EAST TO THE CREEK COUNTY LINE | $17,000,000 | Planned | ||
| FY 2032 | 28831(04) STP-208C(131)PM | CaddoDivision 7 | SH-152 | Intersect Modif SH-152: INTERSECTION MODIFICATION AT JCT SH-58, EAST AND WEST | $5,200,0001 items | Planned | ||
| FY 2032 | 28893(04) J2-8893(004)PM | OttawaDivision 8 | US-59 | Widen, Resurface & Bridge US-59: FROM JCT OF SH-125 NORTHWEST TO JCT I-44 | $21,800,000 | Planned | ||
| FY 2032 | 28896(04) J2-8896(004)PM | TulsaDivision 8 | US-64 | Grade, Drain & Surface US-64: FROM SOUTH 161ST STREET EXTEND SE 1.85 MILES TO MINGO ROAD | $12,000,000 | Planned | ||
| FY 2032 | 28901(04) J2-8901(004)PM | CraigDivision 8 | US-60 | Grade,Drain,Bridge & Surface US-60: BEGIN 3.03 MILES EAST OF NOWATA C/L EXTEND EAST 4.45 MI | $11,000,0001 items | Planned | ||
| FY 2032 | 28901(07) J2-8901(007)PM | CraigDivision 8 | US-60 | Grade,Drain,Bridge & Surface US-60: BEGIN 7.48 MILES EAST OF NOWATA C/L EXTEND EAST 4.5 MI TO JCT SH 66 | $15,300,0001 items | Planned | ||
| FY 2032 | 28920(04) J2-8920(004)PM | JohnstonDivision 3 | SH-48 | Widen & Resurface SH-48: FROM ATOKA COUNTY LINE, NORTH 7.5 MILES TO SH-48A | $27,000,000 | Planned | ||
| FY 2032 | 28951(08) J2-8951(008)PM | OklahomaDivision 4 | I-40 | Interchange I-40: OVER I-44 5.3 MIS. E. OF THE CANADIAN C/L ("K" INTERCHANGE PH II). | $93,700,0002 items | Planned | ||
| FY 2032 | 29657(10) J2-9657(010)PM | StephensDivision 7 | SH-29 | Grade,Drain,Bridge & Surface SH-29: FROM 16.92 MILES E. OF US-81 EXTEND E. 6.08 MIS. TO THE GARVIN C/L. | $41,200,0003 items | Planned | ||
| FY 2032 | 30373(04) J3-0373(004)PM | DelawareDivision 8 | US-412A | Grade,Drain,Bridge & Surface US-412A: JCT. US-412A/US-412 EXTEND EAST 7.35 MI TO SH 412A JCT | $18,000,0002 items | Planned | ||
| FY 2032 | 30426(08) STP-226C(122)PM | GradyDivision 7 | SH-19 | Grade, Drain & Surface SH-19: FROM 16.76 MIS. E. OF US-81, EXTEND E. 0.89 MIS. TO THE WASHITA RIVER BRIDGE | $3,600,000 | Planned | ||
| FY 2032 | 31873(08) J3-1873(008)PM | GarvinDivision 3 | US-177 | Widen & Resurface US-177: FROM 5.5 MILES NORTH OF MURRAY COUNTY LINE, NORTH 5.0 MILES | $17,600,000 | Planned | ||
| FY 2032 | 32705(04) NHPPI-4440-(014)PM | TulsaDivision 8 | I-444 | Bridge Rehabilitation I-444: AT 12TH STREET, 0.5 MILES EAST OF JCT. I-244 | $7,000,0001 items | Planned | ||
| FY 2032 | 33311(07) J3-3311(007)PM | BeckhamWashitaDivision 5 | I-40 | Grade,Drain,Bridge & Surface I-40: BEGIN MP 40.1 AND EXT TO MP 45.17 TO INCLUDE EXITS 40 & 41 E & WB LN | $68,500,0005 items | Planned | ||
| FY 2032 | 33465(04) J3-3465(004)PM | SequoyahDivision 1 | US-64 | Bridge & Approaches US-64: OVER GARRISON CR. TRIB. O'FLOW, & GENERAL OVERFLOWS APPROX. 20 MI. EAST OF US-59 JCT. WB ONLY | $11,600,0003 items | Planned | ||
| FY 2032 | 33465(07) J3-3465(007)PM | SequoyahDivision 1 | US-64 | Bridge & Approaches US-64: OVER GARRISON CR. TRIB. O'FLOW, & GENERAL OVERFLOWS APPROX. 20 MI. EAST OF US-59 JCT. WB ONLY | $10,200,0002 items | Planned | ||
| FY 2032 | 33793(04) STP-246C(068)PM | McIntoshDivision 1 | SH-9 | Bridge & Approaches SH-9: OVER UNNAMED CRK & WALLACE CRK 6.0 & 6.2 MI E OF JCT SH-52 | $8,600,0002 items | Planned | ||
| FY 2032 | 34338(04) J3-4338(004)PM | MuskogeeDivision 1 | US-64B | Bridge & Approaches US-64B: OVER UP R.R., APPROX. 2.25 MI S OF US-64B / US-62B JCT. | $7,500,0002 items | Planned | ||
| FY 2032 | 34342(04) J3-4342(004)PM | McIntoshDivision 1 | SH-9 | Grade, Drain & Surface SH-9: SLIDE REPAIR 1.0 MI E OF INDIAN NATION TURNPIKE | $2,000,000 | Planned | ||
| FY 2032 | 34349(04) J3-4349(004)PM | MuskogeeDivision 1 | US-62 | Widen & Resurface US-62: FROM 0.26 MI N OF CLOUD CREEK, N 7.86 MI TO US-62/US-64/SH-16 JCT. | $11,800,000 | Planned | ||
| FY 2032 | 34372(04) J3-4372(004)PM | AdairCherokeeDivision 1 | SH-100 | Grade,Drain,Bridge & Surface SH-100: FROM CR S585 RD, EXTEND E 5.10 MI | $11,300,0001 items | Planned | ||
| FY 2032 | 34962(04) J3-4962(004)PM | BeaverDivision 6 | US-64 | Widen & Resurface US-64: BEGIN APPROX 6.0 MI WEST OF THE JCT US-270, EXTEND EAST APPROX 6 MI (THRU FORGAN) | $12,200,000 | Planned | ||
| FY 2032 | 35039(04) J3-5039(004)PM | CraigOttawaDivision 8 | US-59 | Widen & Resurface US-59: FROM 4 MILES WEST OF SH-10/US-59 JCT EXTEND WEST 2.69 MILES | $5,500,000 | Planned | ||
| FY 2032 | 35040(04) J3-5040(004)PM | OttawaDivision 8 | US-59 | Widen & Resurface US-59: FROM SH-10/US-59 JCT WEST 2.24 MILES | $9,100,000 | Planned | ||
| FY 2032 | 35083(04) J3-5083(004)PM | MajorDivision 6 | US-60 | Intersect Modif US-60: BEGIN APPROX 0.5 MILES WEST OF JCT SH-58, EXTEND EAST APPROX 1.0 MI | $3,700,000 | Planned | ||
| FY 2032 | 35170(04) J3-5170(004)PM | GradyDivision 7 | SH-92 | Widen, Resurface & Bridge SH-92: FROM US-62, EXTEND N. 5. MIS. TO COUNTY ROAD E1310 | $24,600,0001 items | Planned | ||
| FY 2032 | 35194(04) J3-5194(004)SB | GrantDivision 4 | SH-74 | Bridge Rehabilitation SH-74: OVER SALT FORK OF THE ARKANSAS RIVER, 3.2 MILES NORTH OF GRANT C/L | $4,000,0001 items | Planned | ||
| FY 2032 | 35195(04) J3-5195(004)SB | GrantDivision 4 | US-81 | Bridge Rehabilitation US-81: OVER SALT FORK CREEK APPROX. 1.5 MILES NORTH OF US81/US60 JCT NORTH OF POND CREEK. | $4,000,0001 items | Planned | ||
| FY 2032 | 35463(04) J3-5463(004)PM | TulsaDivision 8 | US-75 | Interchange US-75: AT 106TH STREET NORTH, 4 MILES SOUTH OF SH-20 JCT. | $10,000,000 | Planned | ||
| FY 2032 | 35471(08) J3-5471(008)PM | McCurtainDivision 2 | US-259 | Grade,Drain,Bridge & Surface US-259: FROM 0.34 MI NORTH OF JCT SH-3, EXTEND NORTH APPROX 3.0 MI | $30,900,000 | Planned | ||
| FY 2032 | 35558(04) J3-5558(004)PM | TexasDivision 6 | SH-136 | Widen, Resurface & Bridge SH-136: BEGINNING AT JCT US-64, EXTEND NORTH 4.88 MI | $12,000,0002 items | Planned | ||
| FY 2032 | 35566(04) J3-5566(004)PM | JacksonDivision 5 | SH-6 | Widen & Resurface SH-6: BEGIN 8.0 MILES NE OF SH-34 & EXT N 6.8 MILES. | $8,700,000 | Planned | ||
| FY 2032 | 35575(04) STP-210C(112)PM | CarterDivision 7 | SH-53 | Widen & Resurface SH-53: FROM JCT SH-53/SH-76S, EXTEND N. 3.05 MIS. | $5,700,000 | Planned | ||
| FY 2032 | 35576(04) J3-5576(004)PM | OkmulgeeDivision 1 | I-40 | Bridge Rehabilitation I-40: OVER WOLF CREEK WB, 9.8 MI EAST OF OKFUSKEE C/L | $4,000,0002 items | Planned | ||
| FY 2032 | 35612(04) J3-5612(004)PM | KayDivision 4 | US-60 | Bridge & Approaches US-60: OVER US-77 2 MILES EAST OF I-35 NEAR TONKAWA | $2,000,0002 items | Planned | ||
| FY 2032 | 35621(04) J3-5621(004)PM | NobleDivision 4 | I-35 | Bridge Rehabilitation I-35: OVER BNSF RR APPROX 3.3 MILES SOUTH OF PERRY | $2,500,0002 items | Planned | ||
| FY 2032 | 35622(04) J3-5622(004)PM | NobleDivision 4 | I-35 | Bridge Rehabilitation I-35: OVER BNSF APPROX 1 MILE SOUTH OF PERRY | $1,800,0002 items | Planned | ||
| FY 2032 | 35676(04) J3-5676(004)PM | KingfisherDivision 4 | US-81 | Pavement Rehabilitation US-81: FROM THE CIMARRON RIVER SOUTH 5.5 MI TO AIRPORT RD | $3,000,000 | Planned | ||
| FY 2032 | 35678(04) J3-5678(004)PM | CanadianDivision 4 | SH-66 | Resurface SH-66: FROM BANNER RD EXT EAST APPROX 6 MILES TO SH-4 | $4,000,000 | Planned | ||
| FY 2032 | 35679(04) J3-5679(004)PM | CanadianDivision 4 | SH-66 | Dowel Bar Retrofit & Diamond Grind SH-66: FROM SH-4 EXT EAST APPROX 2.5 MILES TO THE JCT OF THE JKT | $4,000,000 | Planned | ||
| FY 2032 | 35745(04) J3-5745(004)PM | EllisDivision 6 | US-60 | Widen, Resurface & Bridge US-60: BEGIN 2.0 MI EAST OF THE TEXAS S/L, EXTEND EAST 5.24 MI (0.5 MI EAST OF JCT US-283 | $11,600,0001 items | Planned | ||
| FY 2032 | 35749(04) J3-5749(004)PM | OklahomaDivision 4 | I-40 | Interchange I-40: COUNCIL ROAD OVER I-40 INTERCHANGE | $20,000,0002 items | Planned | ||
| FY 2032 | 35841(04) J3-5841(004)PM | AlfalfaDivision 6 | SH-8 | Grade,Drain,Bridge & Surface SH-08: BEGIN AT THE JCT OF US-64, EXTEND NORTH 7.0 MI TO THE JCT OF SH-58 | $18,000,0003 items | Planned | ||
| FY 2032 | 35846(04) J3-5846(004)PM | OkmulgeeDivision 1 | US-75 | Bridge & Approaches US-75: OVER OKMULGEE CREEK, 2.27 MI N OF US-62 JCT. | $5,600,0002 items | Planned | ||
| FY 2032 | 35857(04) J3-5857(004)PM | ClevelandDivision 3 | US-77 | Money Only US-77: AT THE INTERSECTION OF POST OAK RD IN NORMAN | $1,000,000 | Planned | ||
| FY 2032 | 36134(04) J3-6134(004)PM | WashitaDivision 5 | SH-54 | Widen & Resurface SH-54: BEGIN AT THE SH-152 JCT AND EXT NORTH 6.0 MILES TO THE SH-54A JCT. | $13,700,000 | Planned | ||
| FY 2032 | 36140(04) J3-6140(004)PM | BeckhamDivision 5 | I-40 | Bridge & Approaches I-40: SOUTH FRONTAGE ROAD OVER TIMBER CREEK AND OVERFLOW, 2.7 & 2.8 MILES EAST OF EAST I-40B JCT IN SAYRE. | $3,600,0002 items | Planned |
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.