ODOT Jobs

All dates · 1,327 jobs · $11,112,429,462 Sign up free
★ My Jobs

1,327 jobs · $11,112,429,462 estimated

ExcelCSV
Let date Contract / J/P County / Division Highway Description Estimate Status Added Low bidder
Aug 1, 2029 estimated 13337(23) J1-3337(023)PM CimarronDivision 6 US-287 Grade,Drain,Bridge & Surface US-287: BEGIN APPROX 13.28 MILES N OF VAN BUREN ST IN BOISE CITY, EXTEND NORTH APPROX 4.5 MILES $27,500,0005 items Planned Nov 25 New
Aug 1, 2029 estimated 31262(04) J3-1262(004)PM GarvinDivision 3 SH-29 Widen, Resurface & Bridge SH-29: OVER WILDCAT, SALT, AND UNNAMED CREEKS EAST OF STEPHENS COUNTY LINE $15,800,0003 items Planned Nov 25 New
Aug 1, 2029 estimated 31809(04) STP-227B(050)PM GrantDivision 4 SH-11 Widen & Resurface SH-11: FROM SH-74 EXTEND EAST 5 MILES TO THE KAY C/L $20,500,0002 items Planned Nov 25 New
Aug 1, 2029 estimated 34334(04) J3-4334(004)FP MuskogeeSequoyahDivision 1 I-40 Bridge & Approaches I-40: OVER ARKANSAS RIVER, BEGIN MP 290, E 1.0 MI $86,000,0001 items Planned Nov 25 New
Aug 1, 2029 estimated 35883(04) J3-5883(004)PM McCurtainDivision 2 US-70 Intersect Modif US-70: AT JCT US-259 IN IDABEL INTERSECTION IMPROVEMENTS $500,000 Planned Nov 25 New
Aug 1, 2029 estimated 36222(04) J3-6222(004)PM CimarronDivision 6 US-287 Resurface US-287: BEGIN 7.94 MI SE OF JCT US-64 (US-412), EXTEND NW 7.0 MI $7,500,000 Planned Nov 25 New
Aug 1, 2029 estimated 36332(04) J3-6332(004)PM OttawaDivision 8 SH-125 Grade, Drain & Surface SH-125: FROM THE INTERSECTION OF SH-125 AND 20TH AVE SW, EXTEND NORTH 1.3 M TO NEOSHO RIVER $10,000,000 Planned Nov 25 New
Sep 1, 2029 estimated 33352(04) J3-3352(004)PM NobleDivision 4 US-177 Grade,Drain,Bridge & Surface US-177: FROM 6.0 MILES NORTH OF US-64, EXTEND NORTH 0.5 MILES $4,700,0001 items Planned Nov 25 New
Sep 1, 2029 estimated 33828(04) J3-3828(004)PM CraigDivision 8 US-60 Grade,Drain,Bridge & Surface US-60: FROM 0.67 MILES EAST OF SH-2 EXTENDING EAST 7.23 MILES. $16,600,0003 items Planned Nov 25 New
Sep 1, 2029 estimated 35471(04) J3-5471(004)PM McCurtainDivision 2 US-259 Grade,Drain,Bridge & Surface US-259: FROM 0.34 MI NORTH OF JCT SH-3, EXTEND NORTH APPROX 3.0 MI $39,200,000 Planned Nov 25 New
Sep 1, 2029 estimated 35694(04) J3-5694(004)PM GradyDivision 7 US-277 Money Only US-277: OVER I-44 (H.E. BAILEY TURNPIKE) (OTA PROJECT WITH ODOT PARTICIPATION WITH BRIDGE) $4,800,0001 items Planned Nov 25 New
Sep 1, 2029 estimated 35703(04) J3-5703(004)PM GradyDivision 7 US-81 Intersect Modif US-81: AT COUNTY ROAD 1280, APPROX. 2.0 MIS. S. OF POCASSET ADD LT. TURN LANE $1,900,000 Planned Nov 25 New
Sep 1, 2029 estimated 38549(04) J3-8549(004)PM McCurtainDivision 2 US-259 Intersect Modif US-259: NB/SB AT SH-3/US-70 $2,100,000 Planned Nov 25 New
FY 2029 29529(06) J2-9529(006)PM DeweyDivision 5 US-60 Money Only US-60: MONEY PLACE HOLDER $1,000,000 Planned Nov 25 New
FY 2030 18835(04) NHPP-022N(052)PM MarshallDivision 2 00PHWY Grade,Drain,Bridge & Surface US-70: MADILL REALIGNMENT FROM APPR. 0.4 MI WEST OF US-177 EXTEND EAST APPR. 3.0 MI TO SOUTH SH-199 JCT $32,800,000 Planned Nov 25 New
FY 2030 20997(19) J2-0997(019)PM ClevelandDivision 3 US-77 Grade, Drain & Surface US-77: FROM 0.7 MILES EAST OF MCCLAIN COUNTY LINE, EAST AND NORTH 1.2 MILES $16,500,000 Planned Nov 25 New
FY 2030 24425(04) J2-4425(004)PM CreekDivision 8 US-75A Widen, Resurface & Bridge US-75A: APPROX. 0.34 MI. NORTH OF THE OKMULGEE C/L NORTH APPROX 5.5 MILES, TO KIEFER $10,900,0002 items Planned Nov 25 New
FY 2030 24428(14) J2-4428(014)PM GradyDivision 7 00PHWY Surface US-81 REALIGNMENT: SURFACE SB LANES FROM 0.46 MIS. N. OF QUAIL RD. N. 6.1 MIS. TO US 62 (INCLUDES RAMPS AT COUNTRY CLUB RD. & GRAND AVE. (PHASE 4) $46,900,000 Planned Nov 25 New
FY 2030 29650(04) J2-9650(004)PM LoveDivision 7 US-77 Widen & Resurface US-77: FROM APPROX 4.4 MILES N. OF TEXAS STATE LINE, EXTEND N. 1.8 MILES $4,400,000 Planned Nov 25 New
FY 2030 30389(04) NHPPI-3500-(180)FP GarvinMcClainDivision 3 I-35 Grade, Drain & Surface I-35: FROM SH-145, NORTH 4.3 MILES $45,800,000 Planned Nov 25 New
FY 2030 30637(04) J3-0637(004)PM OklahomaDivision 4 I-44 Bridge Rehabilitation I-44: OVER THE UPRR, 0.7 MILES NORTH OF I-40 $38,200,0002 items Planned Nov 25 New
FY 2030 31047(04) STP-253C(093)PM CoalJohnstonDivision 3 SH-48 Widen & Resurface SH-48: FROM 2.0 MILES NORTH OF SH-7, NORTH 6.0 MILES $15,200,000 Planned Nov 25 New
FY 2030 31050(04) STP-235C(065)PM JohnstonDivision 3 SH-48 Bridge Rehabilitation SH-48: OVER SANDY CREEK, 3.0 MILES SOUTH OF SH-7 $1,600,0001 items Planned Nov 25 New
FY 2030 31093(04) J3-1093(004)PM RogersDivision 8 US-412 Interchange US-412: AT 265TH E AVE, APPROX. 2.8 MILES EAST OF I-44 JCT $15,300,000 Planned Nov 25 New
FY 2030 31098(04) STP-272N(460)PM TulsaDivision 8 SH-20 Intersection Mod. & Traf. Signals SH-20: AT 145TH 0.5 MILES EAST OF US-169 $2,000,000 Planned Nov 25 New
FY 2030 31324(04) J3-1324(004)PM LincolnDivision 3 US-177 Widen & Resurface US-177: FROM 8.0 MILES NORTH OF SH-66, NORTH 5.0 MILES TO SH-105 $19,600,000 Planned Nov 25 New
FY 2030 31809(05) STP-236B(090)PM KayDivision 4 SH-11 Widen & Resurface SH-11: FROM THE GRANT C/L, EXTEND EAST 6.5 MILES TO I-35 $24,200,000 Planned Nov 25 New
FY 2030 31965(04) J3-1965(004)PM WashingtonDivision 8 US-60 Grade, Drain & Surface US-60: FROM SH-123 E 3.71 MILES $19,000,000 Planned Nov 25 New
FY 2030 32699(04) STP-221C(073)PM DelawareDivision 8 SH-10 Grade, Drain & Surface SH-10: BEGINNING APPROX. 1.10 MI E OF THE US-59/SH-10 JCT., EXTEND EAST APPROX. 1.35 MI $7,300,000 Planned Nov 25 New
FY 2030 32765(04) STP-209C(073)PM CanadianDivision 4 SH-66 Bridge Rehabilitation SH-66: WB & EB OVER SHELL CREEK, 8.2 MILES EAST OF US-81 $5,800,0002 items Planned Nov 25 New
FY 2030 32822(04) J3-2822(004)PM McIntoshDivision 1 US-69 Pavement Rehabilitation US-69: FROM MCINTOSH/MUSKOGEE C/L, S. 2.5 MI. $6,100,000 Planned Nov 25 New
FY 2030 32824(04) J3-2824(004)PM HaskellDivision 1 SH-71 Bridge & Approaches SH-71: OVER LONGTOWN CREEK, FROM 1.15 MI. N. OF PITTSBURG C/L, N. .3 MI $3,800,000 Planned Nov 25 New
FY 2030 32825(04) J3-2825(004)PM CherokeeDivision 1 SH-82 Widen, Resurface & Bridge SH-82: FROM APPROX 500' N OF SEQUOYAH C/L, N. 6.7 MI. $15,400,0001 items Planned Nov 25 New
FY 2030 33332(11) J3-3332(011)PM GrantDivision 4 SH-11 Widen, Resurface & Bridge SH-11: FROM SH-74 JCT EXTEND WEST APPROX 6 MI TO COUNTY RD 1000 WEST OF DEER CREEK $13,100,0006 items Planned Nov 25 New
FY 2030 33406(04) J3-3406(004)PM KayDivision 4 US-60 Widen, Resurface & Bridge US-60: FROM GRANT C/L, EXTEND EAST 6.5 MILES TO I-35 $26,400,000 Planned Nov 25 New
FY 2030 33462(04) J3-3462(004)PM MuskogeeDivision 1 SH-10 Widen & Resurface SH-10: FROM CR E0870 EXTEND NORTH APPROX. 1.89 MI. TO CR N4390 RD $4,400,000 Planned Nov 25 New
FY 2030 33816(04) J3-3816(004)PM OttawaDivision 8 US-60 Widen & Resurface US-60: FROM 2.6 MILES NORTH OF THE DELAWARE CO LN EXTENDING NORTH APPROX. 1.26 MILES $2,900,000 Planned Nov 25 New
FY 2030 33824(04) J3-3824(004)PM PawneeDivision 8 SH-18 Grade,Drain,Bridge & Surface SH-18: FROM THE PAYNE C/L TO THE CIMARRON TURNPIKE $14,200,000 Planned Nov 25 New
FY 2030 33825(04) J3-3825(004)PM PawneeDivision 8 SH-18 Grade, Drain & Surface SH-18: FROM THE CIMARRON TURNPIKE TO US-64 $24,600,000 Planned Nov 25 New
FY 2030 33863(04) NHPP-255N(645)PM OklahomaDivision 4 US-62 Bridge Rehabilitation US-62:OVER CHOCTAW CREEK, 11 MILES EAST OF I-35 $11,400,0004 items Planned Nov 25 New
FY 2030 34251(04) J3-4251(004)PM SeminoleDivision 3 SH-59 Bridge & Approaches SH-59: OVER UNNAMED CREEK, 1.0 MILE EAST OF US-270 $2,300,0001 items Planned Nov 25 New
FY 2030 34270(04) J3-4270(004)PM DeweyWoodwardDivision 6 SH-34 Widen, Resurface & Bridge SH-34: BEGIN AT THE JCT US-60 IN VICI, EXTEND NORTH APPROX 8.0 MILES $22,500,0001 items Planned Nov 25 New
FY 2030 34284(04) J3-4284(004)PM DeweyMajorDivision 6 US-60 Widen, Resurface & Bridge US-60: BEGIN AT JCT US-270 IN SEILING, EXTEND NORTH APPROX 4.5 MI TO JCT US-281 IN CHESTER $10,600,0001 items Planned Nov 25 New
FY 2030 34351(04) J3-4351(004)PM CherokeeDivision 1 SH-82 Resurface SH-82: BEGIN AT S. INDIAN RD. IN PETTIT, EXTEND N 4.6 MI TO US-62 JCT. $3,300,000 Planned Nov 25 New
FY 2030 34355(04) J3-4355(004)FP McIntoshMuskogeeDivision 1 I-40 Resurface I-40: FROM MP 271.6 TO MP 276.8 $5,100,000 Planned Nov 25 New
FY 2030 34826(04) J3-4826(004)PM OsageDivision 8 US-60 Pavement Rehabilitation US-60: BEGIN 13.86 MILES EAST OF SH-18 , EXTEND EAST 4.90 MILES $6,500,000 Planned Nov 25 New
FY 2030 34967(04) J3-4967(004)PM WoodwardDivision 6 SH-34 Widen, Resurface & Bridge SH-34: BEGIN APPROX 8.0 MI NORTH OF JCT US-60, EXTEND NORTH APPROX 4.2 MI $14,500,0001 items Planned Nov 25 New
FY 2030 35015(04) J3-5015(004)PM SeminoleDivision 3 SH-9 Bridge & Approaches SH-9: OVER TIGER & UNNAMED CREEKS, 4.9 & 5.0 MILES EAST OF SH-99 $4,900,0002 items Planned Nov 25 New
FY 2030 35050(04) STP-249C(089)PM MayesDivision 8 SH-412B Interchange SH-412B: AT US-412 JUNCTION $26,800,000 Planned Nov 25 New
FY 2030 35091(04) STP-266C(133)PM RogersDivision 8 SH-266 Intersect Modif SH-266: AT SH-167 JUNCTION TO SH-66 JUNCTION $1,300,000 Planned Nov 25 New
FY 2030 35113(04) J3-5113(004)PM CreekDivision 8 US-75A Widen & Resurface US-75A: FROM 5.17 MILES NORTH OF THE OKMULGEE CL, EXT. NORTH 6.30 MILES TO SH-33 $22,900,000 Planned Nov 25 New
FY 2030 35114(04) J3-5114(004)PM CreekDivision 8 SH-16 Widen, Resurface & Bridge SH-16: FROM 6.0 MILES EAST OF SH-48, EAST 9.37 MILES $27,300,000 Planned Nov 25 New
FY 2030 35200(04) J3-5200(004)PM AtokaDivision 2 US-69 Grade,Drain,Bridge & Surface US-69: FROM 6.8 MI N. OF JCT. SH-7W., EXTEND N. 1.85 MI THRU STRINGTOWN $27,300,000 Planned Nov 25 New
FY 2030 35427(04) J3-5427(004)PM WashitaDivision 5 SH-152 Bridge & Approaches SH-152: OVER THE WASHITA RIVER AND OVERFLOW LOCATED 8.25 AND 8.5 MILES EAST OF US-183. $9,200,0002 items Planned Nov 25 New
FY 2030 35468(04) J3-5468(004)PM TulsaDivision 8 US-64 Grade, Drain & Surface US-64: FROM 111TTH STREET SOUTH TO 131ST STREET (INTERIM IMPROVEMENTS) $10,500,000 Planned Nov 25 New
FY 2030 35560(04) J3-5560(004)PM HarmonDivision 5 US-62 Widen, Resurface & Bridge US-62: BEGIN 1.0 M EAST OF SH-30 & EXT EAST 7.17 MILES. $20,300,0003 items Planned Nov 25 New
FY 2030 35562(04) J3-5562(004)PM GreerDivision 5 US-283 Widen, Resurface & Bridge US-283: BEGIN AT THE SH-6 N JCT & EXT WEST 7.3 MILES. $17,200,0003 items Planned Nov 25 New
FY 2030 35565(04) J3-5565(004)PM JacksonDivision 5 SH-6 Widen & Resurface SH-6: BEGIN AT THE SH-34 JCT & EXT NE 8.0 MILES. $14,000,000 Planned Nov 25 New
FY 2030 35671(06) J3-5671(006)PM GarfieldDivision 4 US-64 Resurface US-64: FROM JCT OF SH-74 EXT EAST APPX 7.0 MI TO THE NOBLE C/L - N3110 RD $4,400,000 Planned Nov 25 New
FY 2030 35672(04) J3-5672(004)SR LoganDivision 4 SH-33 Resurface SH-33: FROM JCT OF SH-105, EXTEND EAST APPX 5.7 MILES TO ANDERSON RD APPX 3 MI EAST OF LANGSTON $5,500,000 Planned Nov 25 New
FY 2030 35672(05) J3-5672(005)PM LoganDivision 4 SH-33 Resurface SH-33: FROM ANDERSON RD, APPX EAST 3 MILES EAST OF LANGSTON, EXT EAST APPX 6 MILES TO S LOGAN AVE IN LANGSTON $5,500,000 Planned Nov 25 New
FY 2030 35680(04) J3-5680(004)PM KayDivision 4 US-60 Resurface US-60: FROM I-35 EXTEND EAST TO TONKAWA $3,300,000 Planned Nov 25 New
FY 2030 35692(04) J3-5692(004)PM CaddoDivision 7 US-281 Bridge & Approaches US-281: OVER MEDICINE CREEK, APPROX. 2.64 MIS. W. OF JCT US-281/SH-152E $4,800,0001 items Planned Nov 25 New
FY 2030 35693(04) J3-5693(004)PM CaddoDivision 7 SH-37 Bridge & Approaches SH-37: OVER BUGGY CREEK, APPROX. 0.80 MIS. S. OF CANADIAN C/L $4,400,0001 items Planned Nov 25 New
FY 2030 35696(04) J3-5696(004)FP CarterMurrayDivision 7 I-35 Pavement Rehabilitation I-35: FROM MM 41, EXTEND N. 4.83 MIS. $2,900,000 Planned Nov 25 New
FY 2030 35715(04) J3-5715(004)PM KiowaDivision 5 SH-9B Bridge & Approaches SH-9B: OVER AN UNNAMED CREEK, 1.5 MILES NORTH AND EAST OF SH-9 IN HOBART. $1,400,0001 items Planned Nov 25 New
FY 2030 35850(04) J3-5850(004)SR OklahomaDivision 4 US-62 Resurface US-62: FROM I-35 EXT EAST APPX 7.3 MILES TO WESTMINSTER ROAD $5,500,000 Planned Nov 25 New
FY 2030 35850(05) J3-5850(005)PM OklahomaDivision 4 US-62 Resurface US-62: FROM WESTMINSTER ROAD APPX 7.3 MILES EAST OF I-35, EXT EAST APPX 8 MILES TO KICKAPOO TPK $5,500,000 Planned Nov 25 New
FY 2030 35854(05) J3-5854(005)PM LoganDivision 4 I-35 Resurface I-35: FROM E. COLLEGE AVE EXT NORTH APPROX 7.5 MI TO CIMMARON RIVER $5,500,000 Planned Nov 25 New
FY 2030 36143(04) J3-6143(004)PM CusterDivision 5 I-40 Bridge & Approaches I-40: S FRONTAGE ROAD OVER BEAR CR, 3.7 MILES EAST OF THE I-40B EAST JCT IN CLINTON. $2,800,0001 items Planned Nov 25 New
FY 2030 36144(04) J3-6144(004)PM CusterDivision 5 I-40 Bridge & Approaches I-40: N FRONTAGE ROAD OVER UNNAMED CR, 0.4 MILE WEST OF SH-54. $1,300,0001 items Planned Nov 25 New
FY 2030 36198(04) J3-6198(004)PM CherokeeDivision 1 US-62 Pavement Rehabilitation US-62: FROM APPROX 6.0 MI E OF SH-82, E TO SH-51 JCT. $5,500,000 Planned Nov 25 New
FY 2030 36199(04) J3-6199(004)PM MuskogeeDivision 1 SH-80 Widen & Resurface SH-80: FROM US-62 JCT, N APPROX 1.63 MI TO E ELM AVE. $3,300,0001 items Planned Nov 25 New
FY 2030 36242(04) J3-6242(004)PM WagonerDivision 1 SH-16 Bridge Rehabilitation SH-16: OVER THE VERDIGRIS RIVER $3,300,0001 items Planned Nov 25 New
FY 2030 36249(04) J3-6249(004)SB KayDivision 4 US-60 Bridge Rehabilitation US-60: OVER DUCK CREEK; APPROX. 3.3 MILES EAST OF US-177 $2,200,0002 items Planned Nov 25 New
FY 2030 36250(04) J3-6250(004)PM LoganDivision 4 SH-74 Bridge Rehabilitation SH-74: OVER COTTONWOOD CREEK (O'FLOW); APPROX. 3.2 MILES NORTH OF THE OKLAHOMA C/L $300,0001 items Planned Nov 25 New
FY 2030 36251(04) J3-6251(004)PM LoganDivision 4 SH-74 Bridge Rehabilitation SH-74: OVER COTTONWOOD CREEK; APPROX. 3.4 MILES NORTH OF THE OKLAHOMA C/L. $500,0001 items Planned Nov 25 New
FY 2030 36253(04) J3-6253(004)PM GarfieldDivision 4 US-60 Bridge Rehabilitation US-60/412: OVER UNNAMED CREEK; APPROX. 4.5 MILES EAST OF THE MAJOR COUNTY LINE. $500,0002 items Planned Nov 25 New
FY 2030 36255(04) J3-6255(004)PM OklahomaDivision 4 I-44 Bridge Rehabilitation I-44: UNDER SW 44TH (SOUTHBOUND); APPOX. 1.7 MILES NORTH OF I-240 $1,600,0002 items Planned Nov 25 New
FY 2030 36350(04) J3-6350(004)PM CanadianDivision 4 I-40B Resurface I-40B: FROM JCT OF US-81/I-40B (ELM ST.) EXT N. TO WADE ST. THEN W. TO ELLISON ST. $1,100,000 Planned Nov 25 New
FY 2031 21714(04) STP-108B(129)SS CaddoKiowaDivision 7 SH-9 Grade,Drain,Bridge & Surface SH-9: FROM JUST E. OF THE STINKING CR. BRIDGE IN KIOWA CO. E. 2.75 MIS. TO THE SH 58 JCT. IN CARNEGIE (DIST. 5 PARTICIPATION JP 29529(04)) $11,000,0001 items Planned Nov 25 New
FY 2031 24418(04) STP-208C(119)PM CaddoDivision 7 SH-8 Grade, Drain & Surface SH-8: FROM APPROX. 8.0 MIS S. OF US-62 IN ANADARKO, EXT N. 5.0 MIS $19,700,0003 items Planned Nov 25 New
FY 2031 24428(17) J2-4428(017)PM GradyDivision 7 00PHWY Grade,Drain,Bridge & Surface US-81 REALIGNMENT: I-44 INTERCHANGE IMPROVEMENTS INCLUDING RAMP SURFACING (INCLUDES BR. G & I) (PHASE 7) (OTA FUNDING) $49,700,000 Planned Nov 25 New
FY 2031 27101(09) J2-7101(009)PM CherokeeDivision 1 SH-82 Grade, Drain & Surface SH-82: BEGIN @ SH-82/W. 710 RD JCT, N. APPROX 2.25 MI. TO FOURTEEN MILE CRK $17,300,000 Planned Nov 25 New
FY 2031 27978(05) STP-260B(099)PM PayneDivision 4 SH-51 Grade, Drain & Surface SH-51: FROM 3.25 MILES EAST OF SH-18, EXTEND EAST 1.5 MILES THROUGH YALE (TIE WITH 06) $13,200,000 Planned Nov 25 New
FY 2031 29529(04) J2-9529(004)PM KiowaDivision 5 SH-9 Money Only SH-9: MONEY PLACE HOLDER $4,600,000 Planned Nov 25 New
FY 2031 29838(04) J2-9838(004)PM GrantDivision 4 US-60 Widen & Resurface US-60: FROM 1 MILES EAST OF US-81 (POND CREEK) EXTEND EAST 8.0 MILES $21,000,000 Planned Nov 25 New
FY 2031 30373(07) J3-0373(007)PM DelawareDivision 8 US-412A Grade,Drain,Bridge & Surface US-412A: SH 412A JCT AND EXTEND EAST 4.0 MI TO SH 10 $13,100,0001 items Planned Nov 25 New
FY 2031 30392(04) J3-0392(004)PM JohnstonDivision 3 SH-78 Widen & Resurface SH-78: FROM 5.4 MI NORTH OF BRYAN COUNTY LINE, NORTH 4.0 MILES $9,500,000 Planned Nov 25 New
FY 2031 30575(04) J3-0575(004)PM CherokeeDivision 1 SH-82 Widen & Resurface SH-82: FROM 2.57 MI S OF SH-82C JCT., NORTH 6 MILES $8,500,000 Planned Nov 25 New
FY 2031 31002(04) J3-1002(004)PM LoganDivision 4 SH-105 Grade, Drain & Surface SH-105: FROM JCT OF SH-33, EXTEND EAST 3.20 MILES $22,900,000 Planned Nov 25 New
FY 2031 31043(04) J3-1043(004)PM GarvinDivision 3 I-35 Grade, Drain & Surface I-35: FROM 3.2 MILES NORTH OF SH-19, NORTH 3.5 MILES TO SH-145 $57,000,000 Planned Nov 25 New
FY 2031 31854(04) J3-1854(004) ChoctawDivision 2 US-70 Grade,Drain,Bridge & Surface US-70: BEGIN JCT SH-209 EXTEND EAST 5.76 MILES TO MCCURTAIN COUNTY LINE $29,300,0002 items Planned Nov 25 New
FY 2031 32693(04) J3-2693(004)FP MayesDivision 8 US-69 Grade,Drain,Bridge & Surface US-69: SB FROM 8.0 MILES N OF SH-20, EXTEND N 5.35 MILES $29,000,000 Planned Nov 25 New
FY 2031 32693(08) J3-2693(008)PM CraigMayesDivision 8 US-69 Grade,Drain,Bridge & Surface US-69: SB FROM 13.35 MILES N OF SH-20, EXTEND 3.18 MILES $17,300,0002 items Planned Nov 25 New
FY 2031 32819(04) STP-273B(126)PM WagonerDivision 1 SH-51 Widen & Resurface SH-51:FROM SH-51/SH-16, EAST 4.3 MI. $19,000,000 Planned Nov 25 New
FY 2031 33332(04) J3-3332(004)PM GrantDivision 4 SH-11 Widen, Resurface & Bridge SH-11: FROM US-81, EXTEND EAST APPROX 4 MI TO COUNTY ROAD 1000 $29,600,0006 items Planned Nov 25 New
FY 2031 33365(04) J3-3365(004)PM PayneDivision 4 SH-18 Grade,Drain,Bridge & Surface SH-18: FROM SH-33, EXTEND NORTH 2 MILES TO E690 $17,400,0001 items Planned Nov 25 New
FY 2031 33844(04) J3-3844(004)PM GarvinDivision 3 SH-29 Widen, Resurface & Bridge SH-29: FROM 0.4 MILES EAST OF US-77, EAST 4.3 MILES $16,100,0002 items Planned Nov 25 New
FY 2031 33861(04) J3-3861(004) MayesDivision 8 US-69 Pavement Rehabilitation US-69: BEGIN AT THE WAGONER C/L AND EXTEND NORTH 6 MILES $18,000,000 Planned Nov 25 New
901–1,000 of 1,327‹ PrevNext ›

Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.