MT. VERNON
- Let date
- Friday, January 21, 2022
- Contract
- MV066
- District
- District 9
- County
- Jefferson
- Highway
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Southern Illinois Asphalt Co., Inc. Low bidder | $337,425 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Southern Illino… |
|---|---|---|---|---|---|---|
| 1 | AR150510 | ENGINEER'S FIELD OFFICE | 1 | L SUM | $2,355.00 | |
| 2 | AR150520 | MOBILIZATION | 1 | L SUM | $20,857.86 | |
| 3 | AR150530 | TRAFFIC MAINTENANCE | 1 | L SUM | $9,213.94 | |
| 4 | AR152411 | UNCLASSIFIED EXCAVATION | 1 | L SUM | $17,328.02 | |
| 5 | AR156500 | TEMPORARY EROSION CONTROL | 1 | L SUM | $3,532.50 | |
| 6 | AR156540 | RIPRAP | 40 | SQ YD | $138.00 | |
| 7 | AR401111 | PAVEMENT PREPARATION | 4,445 | SQ YD | $5.40 | |
| 8 | AR401613 | BIT. SURF. CSE.-METHOD I, SUPERPAVE | 903 | TON | $128.05 | |
| 9 | AR403621 | BIT. BASE CSE., LEVELING, SUPERPAVE | 530 | TON | $126.70 | |
| 10 | AR602510 | BITUMINOUS PRIME COAT | 1,612 | GALLON | $5.12 | |
| 11 | AR603510 | BITUMINOUS TACK COAT | 679 | GALLON | $3.27 | |
| 12 | AR701518 | 18" RCP, CLASS IV | 98 | FOOT | $208.81 | |
| 13 | AR701900 | REMOVE PIPE | 57 | FOOT | $38.88 | |
| 14 | AR752418 | PRECAST REINFORCED CONC. FES 18" | 2 | EACH | $2,049.97 | |
| 15 | AR800424 | INSTALL INFORMATION SIGN | 1 | EACH | $6,944.72 | |
| 16 | AR901510 | SEEDING | 0.54 | ACRE | $4,974.94 | |
| 17 | AR905530 | TOPSOILING | 2,622 | SQ YD | $8.37 | |
| 18 | AR908514 | LIGHT-DUTY HYDRAULIC MULCH | 0.54 | ACRE | $5,563.69 |