Bid tab LE055

Let Nov 6, 2020 · District 1 · Will

‹ Nov 2020 results

LEWIS UNIVERSITY

Let date
Friday, November 6, 2020
Contract
LE055
District
District 1
County
Will
Highway
Classification
·
Project number

Bidders 9

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Campanella and Sons, Inc. Low bidder $1,121,401
2 Austin Tyler Construction, Inc. $1,184,810 +5.7%
3 Martam Construction Incorporated $1,202,401 +7.2%
4 R. W. Dunteman Company $1,275,935 +13.8%
5 P. T. Ferro Construction Co. $1,277,173 +13.9%
6 Berger Excavating Contractors, Inc. $1,308,109 +16.6%
7 Pan-Oceanic Engineering Co., Inc. $1,349,273 +20.3%
8 D. Construction, Inc. $1,482,335 +32.2%
9 Gallagher Asphalt Corporation $1,533,964 +36.8%

Bid tab: unit prices 75 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Campanella and …#2 Austin Tyler Co…#3 Martam Construc…#4 R. W. Dunteman …#5 P. T. Ferro Con…#6 Berger Excavati…#7 Pan-Oceanic Eng…#8 D. Construction…
1AR108519 POWER CABLE IN UNIT DUCT868L.F. $19.12 $12.60 $11.45 $18.65 $17.50 $11.45 $19.02 $30.00
2AR110502 2-WAY CONCRETE ENCASED DUCT710L.F. $47.12 $61.70 $56.00 $45.97 $56.00 $56.00 $46.89 $125.00
3AR110600 CONCRETE UTILITY PAD1EACH $6,375.50 $6,600.00 $5,950.00 $6,220.00 $5,950.00 $5,950.00 $6,220.00 $9,075.00
4AR110610 ELECTRICAL HANDHOLE4EACH $5,114.40 $5,000.00 $4,490.00 $4,989.66 $4,490.00 $4,490.00 $4,989.66 $7,975.00
5AR110714 ELECTRICAL MANHOLE 4'1EACH $8,251.39 $7,900.00 $7,160.00 $8,050.14 $7,160.00 $7,160.00 $8,050.14 $9,900.00
6AR150510 ENGINEER'S FIELD OFFICE1L.S. $15,000.00 $2,500.00 $14,919.38 $9,750.00 $2,500.00 $26,000.00 $2,500.00 $15,000.00
7AR150520 MOBILIZATION1L.S. $44,406.00 $59,000.00 $72,144.04 $123,880.28 $75,000.00 $78,000.00 $75,500.00 $45,747.00
8AR150530 TRAFFIC MAINTENANCE1L.S. $9,737.50 $2,500.00 $66,666.02 $56,782.43 $66,825.00 $46,000.00 $2,100.00 $15,300.00
9AR152410 UNCLASSIFIED EXCAVATION7,914C.Y. $11.48 $17.00 $13.81 $11.90 $19.00 $19.90 $30.68 $20.00
10AR152540 SOIL STABILIZATION FABRIC1,016S.Y. $3.26 $1.70 $3.61 $9.41 $7.00 $11.00 $4.40 $4.50
11AR154606 GRANULAR DRAINAGE SUBBASE - 6"5,610S.Y. $7.55 $8.25 $8.42 $8.99 $11.50 $9.50 $8.84 $10.00
12AR156510 SILT FENCE2,420L.F. $3.69 $4.25 $3.60 $3.60 $3.60 $3.60 $3.83 $4.00
13AR156511 DITCH CHECK7EACH $115.83 $113.00 $746.95 $113.00 $113.00 $113.00 $102.00 $125.00
14AR156513 SEPARATION FABRIC4,423S.Y. $1.50 $1.70 $2.28 $3.65 $2.00 $6.00 $2.81 $3.00
15AR156520 INLET PROTECTION11EACH $143.50 $200.00 $140.00 $140.00 $140.00 $140.00 $204.00 $154.00
16AR156531 EROSION CONTROL BLANKET10,866S.Y. $1.13 $1.40 $1.10 $1.10 $1.10 $1.10 $1.27 $1.21
17AR156533 TEMPORARY SEED AND MULCH2.9ACRE $2,101.25 $2,900.00 $2,050.00 $2,050.00 $2,050.00 $2,050.00 $2,550.00 $2,255.00
18AR156534 TURF REINFORCING MAT144S.Y. $9.53 $13.50 $9.30 $9.30 $9.30 $9.30 $12.24 $20.00
19AR162506 CLASS E FENCE 6'382L.F. $71.24 $40.75 $36.22 $36.22 $36.22 $69.50 $35.70 $72.00
20AR162630 CLASS E GATE-30'2EACH $6,422.50 $4,400.00 $3,888.00 $3,888.00 $3,888.00 $6,265.85 $3,678.12 $4,750.00
21AR208515 POROUS GRANULAR EMBANKMENT336C.Y. $64.46 $37.00 $41.40 $47.00 $75.00 $63.00 $50.83 $50.00
22AR208604 4" AGGREGATE BASE COURSE85S.Y. $25.13 $22.00 $12.88 $12.72 $10.00 $17.00 $6.56 $14.00
23AR209610 CRUSHED AGG. BASE COURSE - 10"5,610S.Y. $9.78 $14.00 $10.07 $13.82 $16.00 $13.75 $10.43 $16.50
24AR209613 CRUSHED AGG. BASE COURSE - 13"380S.Y. $14.45 $18.00 $17.56 $26.19 $23.00 $22.00 $11.57 $22.00
25AR209708 CRUSHED AGG. SHOULDER - 8"385S.Y. $21.04 $19.00 $15.60 $19.00 $19.00 $22.00 $8.49 $15.00
26AR401613 BIT. SURF. CSE.-METHOD I, SUPERPAVE725TON $105.58 $89.00 $109.57 $88.30 $90.00 $103.00 $94.50 $82.00
27AR401660 SAW & SEAL BIT. JOINTS230L.F. $11.43 $21.00 $18.51 $5.00 $9.00 $16.00 $8.00 $8.50
28AR401665 BITUMINOUS PAVEMENT SAWING230L.F. $2.74 $4.50 $4.02 $4.00 $2.50 $8.00 $8.00 $3.00
29AR403613 BIT. BASE CSE.-METHOD I, SUPERPAVE1,018TON $92.61 $69.00 $96.12 $87.42 $80.00 $90.35 $84.00 $78.00
30AR501606 6" PCC SIDEWALK644S.F. $9.90 $10.50 $6.65 $10.31 $15.00 $14.00 $9.86 $8.00
31AR602510 BITUMINOUS PRIME COAT2,158GAL. $0.0100 $0.0100 $0.0100 $1.11 $0.0100 $0.0100 $0.0100 $0.0100
32AR603510 BITUMINOUS TACK COAT867GAL. $0.0100 $0.0100 $0.0100 $3.49 $0.0100 $0.0100 $0.0100 $0.0100
33AR620535 PAVEMENT MARKING-THERMOPLASTIC898S.F. $8.20 $5.00 $8.00 $4.40 $4.40 $4.40 $4.40 $18.15
34AR701006 6" PVC STORM SEWER30L.F. $78.44 $68.00 $53.96 $56.25 $90.00 $38.00 $94.86 $60.00
35AR701512 12" RCP, CLASS IV544L.F. $38.97 $42.00 $68.00 $47.00 $43.00 $43.00 $61.22 $65.00
36AR701518 18" RCP, CLASS IV110L.F. $52.22 $49.00 $83.00 $60.10 $68.00 $56.00 $83.09 $75.00
37AR701524 24" RCP, CLASS IV97L.F. $72.09 $59.00 $98.00 $70.25 $76.00 $67.00 $97.76 $95.00
38AR701530 30" RCP, CLASS IV240L.F. $72.62 $69.00 $125.00 $85.50 $81.00 $86.00 $109.35 $115.00
39AR701900 REMOVE PIPE75L.F. $25.14 $22.00 $27.48 $23.60 $28.00 $16.00 $35.00 $20.00
40AR705506 6" PERFORATED UNDERDRAIN3,093L.F. $27.61 $27.50 $22.00 $21.30 $15.00 $23.23 $31.49 $25.00
41AR705630 UNDERDRAIN INSPECTION HOLE11EACH $1,461.49 $1,100.00 $911.41 $721.50 $1,000.00 $650.00 $1,020.06 $600.00
42AR705640 UNDERDRAIN CLEANOUT5EACH $1,461.49 $1,100.00 $911.41 $721.50 $1,000.00 $685.00 $883.66 $600.00
43AR705901 REMOVE UNDERDRAIN HEADWALL1EACH $360.00 $200.00 $333.85 $50.00 $250.00 $150.00 $550.00 $150.00
44AR705904 REMOVE UNDERDRAIN CLEANOUT1EACH $360.00 $225.00 $333.85 $50.00 $250.00 $150.00 $275.00 $200.00
45AR751412 INLET-TYPE B6EACH $2,346.20 $2,350.00 $1,674.69 $2,412.00 $2,400.00 $2,050.00 $1,957.90 $1,500.00
46AR751540 MANHOLE 4'5EACH $2,464.65 $2,500.00 $2,777.86 $2,860.50 $2,900.00 $2,575.00 $2,697.52 $3,000.00
47AR751560 MANHOLE 6'2EACH $6,250.60 $4,000.00 $5,031.67 $4,665.00 $4,600.00 $3,650.00 $3,465.32 $6,000.00
48AR752412 PRECAST REINFORCED CONC. FES 12"1EACH $1,189.95 $825.00 $733.85 $1,045.00 $800.00 $1,200.00 $1,160.85 $600.00
49AR752424 PRECAST REINFORCED CONC. FES 24"2EACH $1,646.02 $1,000.00 $1,090.61 $1,310.75 $950.00 $1,600.00 $1,288.45 $900.00
50AR752430 PRECAST REINFORCED CONC. FES 30"1EACH $2,585.94 $1,200.00 $1,463.46 $1,683.00 $1,100.00 $1,900.00 $1,538.33 $1,000.00
51AR752512 GRATING FOR CONC. FES 12"1EACH $410.38 $600.00 $509.16 $471.00 $560.00 $450.00 $277.75 $400.00
52AR752524 GRATING FOR CONC. FES 24"2EACH $613.35 $800.00 $685.30 $739.00 $725.00 $650.00 $694.38 $600.00
53AR752530 GRATING FOR CONC. FES 30"1EACH $782.98 $1,000.00 $843.75 $941.00 $875.00 $830.00 $634.15 $900.00
54AR752900 REMOVE END SECTION1EACH $485.00 $225.00 $500.78 $350.00 $250.00 $235.00 $110.00 $300.00
55AR754312 CONCRETE GUTTER, TYPE A89L.F. $34.10 $35.00 $28.81 $46.31 $45.00 $40.00 $34.18 $40.00
56AR754410 COMB CONCRETE CURB & GUTTER147L.F. $33.00 $35.00 $29.41 $42.54 $40.00 $40.00 $27.51 $38.00
57AR760000 WATER MAIN CONNECTION1L.S. $12,524.20 $9,500.00 $8,830.48 $14,400.00 $8,000.00 $11,850.00 $8,097.35 $4,500.00
58AR760508 8" DUCTILE IRON WATER MAIN32L.F. $118.14 $177.00 $137.22 $138.50 $150.00 $138.00 $202.85 $300.00
59AR760965 RELOCATE FIRE HYDRANT1EACH $5,571.80 $3,150.00 $2,914.65 $1,815.00 $6,750.00 $5,400.00 $8,040.56 $3,500.00
60AR770506 6" SANITARY SEWER290L.F. $43.51 $70.00 $65.79 $82.70 $82.00 $63.00 $159.44 $85.00
61AR770701 SANITARY SEWER CONNECTION1L.S. $4,061.25 $3,400.00 $2,070.36 $960.00 $5,000.00 $5,200.00 $3,666.43 $1,000.00
62AR770704 SANITARY MANHOLE 4'2EACH $3,004.84 $3,400.00 $3,560.35 $5,300.00 $5,000.00 $3,450.00 $3,714.75 $4,500.00
63AR801005 1-WAY SPLIT DUCT, CONC. ENCASED97L.F. $70.70 $42.50 $38.60 $68.98 $38.60 $38.60 $70.36 $1,180.00
64AR801009 2-WAY 4" PVC DUCT, DIRECT BURY1,645L.F. $23.39 $42.00 $38.10 $22.82 $44.00 $38.10 $23.28 $65.00
65AR801010 INFILTRATION TRENCH - TYPE A254L.F. $79.25 $65.00 $75.45 $151.70 $125.00 $67.00 $104.74 $150.00
66AR801011 INFILTRATION TRENCH - TYPE B229L.F. $40.41 $55.00 $35.54 $74.65 $35.00 $48.00 $61.74 $125.00
67AR801012 CONCRETE CABLE BOTTOM81S.Y. $206.34 $305.00 $183.18 $200.55 $200.00 $290.68 $178.83 $250.00
68AR801013 PROTECTION BOLLARD7EACH $2,005.21 $800.00 $740.00 $765.00 $740.00 $740.00 $1,956.30 $1,200.00
69AR901510 SEEDING3.3ACRE $2,108.43 $3,900.00 $2,057.00 $2,057.00 $2,057.00 $2,057.00 $3,570.00 $2,265.00
70AR904510 SODDING1,895S.Y. $8.20 $13.50 $8.00 $8.00 $8.00 $8.00 $12.24 $8.80
71AR905510 TOPSOILING (FROM ON SITE)1,983C.Y. $7.31 $16.25 $5.42 $20.32 $9.00 $9.00 $15.30 $12.00
72AR908510 MULCHING1ACRE $586.30 $5,000.00 $572.00 $572.00 $572.00 $572.00 $4,590.00 $635.00
73AR910110 RDWY LIGHT POLE W/FIXTURE7EACH $7,686.18 $7,100.00 $6,460.00 $7,498.71 $6,910.00 $6,460.00 $7,498.71 $53.50
74AR910200 ROADWAY SIGN10EACH $615.00 $450.00 $500.00 $375.00 $375.00 $375.00 $375.00 $750.00
75AR910905 REMOVE RDWY LGT POLE W/FIXTURE1EACH $3,310.02 $463.00 $420.00 $3,229.29 $870.00 $420.00 $3,229.29 $1,100.00

Showing the first 8 bidders. The Excel and CSV downloads include all 9.