FAI 290 22 BJ
- Let date
- Friday, January 20, 2023
- Contract
- 62T96 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- (2546-Ft) Improvement consists of Bridge deck patching and bridge joint reconstruction on FAI 290 (WB) ramp to SB 1-355 located in the Village of Addison and Medinah in DuPage County.
- Classification
- Bridge deck patching and bridge joint reconstruction on FAI 290 (WB) ramp to SB 1-355 located in the Village o
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Alliance Contractors, Inc. Low bidder | $915,316 | ||
| 2 | R. W. Dunteman Company | $1,039,979 | +13.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Alliance Contra… | #2 R. W. Dunteman … |
|---|---|---|---|---|---|---|---|
| 1 | X6700407 | ENGR FLD OFF A D1 | 12 | CAL MO | $500.00 | $3,000.00 | |
| 2 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $86,315.00 | $140,793.40 | |
| 3 | X7013820 | TR CONT SURVEIL EXPWY | 30 | CAL DA | $100.00 | $100.00 | |
| 4 | X7200057 | TEMP SIGN PAN OVERLAY | 36 | SQ FT | $65.00 | $25.00 | |
| 5 | X7830050 | RAISD REF PM REFL REM | 178 | EACH | $20.00 | $5.00 | |
| 6 | Z0001800 | APPROACH SL REP (PD) | 3.2 | SQ YD | $2,000.00 | $1,550.00 | |
| 7 | Z0012755 | STR REP CON DP OVER 5 | 10 | SQ FT | $625.00 | $1,140.00 | |
| 8 | Z0016200 | DECK SLAB REP (PART) | 5 | SQ YD | $1,200.00 | $340.00 | |
| 9 | Z0030850 | TEMP INFO SIGNING | 100 | SQ FT | $20.00 | $16.00 | |
| 10 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | |
| 11 | 40600290 | BIT MATLS TACK CT | 1,480 | POUND | $0.0100 | $1.00 | |
| 12 | 40600370 | LONG JOINT SEALANT | 275 | FOOT | $26.10 | $26.37 | |
| 13 | 40605026 | P HMA SC SMA 9.5 F N80 | 369 | TON | $272.00 | $208.37 | |
| 14 | 44000157 | HMA SURF REM 2 | 3,289 | SQ YD | $9.00 | $10.92 | |
| 15 | 50102400 | CONC REM | 8.7 | CU YD | $4,775.00 | $6,000.00 | |
| 16 | 50300255 | CONC SUP-STR | 8.7 | CU YD | $6,895.00 | $7,000.00 | |
| 17 | 50300260 | BR DECK GROOVING | 11 | SQ YD | $125.00 | $1.00 | |
| 18 | 50300300 | PROTECTIVE COAT | 13 | SQ YD | $10.00 | $20.00 | |
| 19 | 50800205 | REINF BARS, EPOXY CTD | 1,620 | POUND | $4.25 | $5.50 | |
| 20 | 50800515 | BAR SPLICERS | 16 | EACH | $75.00 | $134.00 | |
| 21 | 52000216 | FINGER PLT EXP JT 5 | 40 | FOOT | $7,725.00 | $8,495.00 | |
| 22 | 52000600 | FAB REINF ELAS TROUGH | 87.9 | FOOT | $625.00 | $777.00 | |
| 23 | 59200101 | BRIDGE WASHING N1 | 1 | EACH | $7,500.00 | $5,400.00 | |
| 24 | 67100100 | MOBILIZATION | 1 | L SUM | $54,000.00 | $70,564.75 | |
| 25 | 70300150 | SHRT TRM PAVT MK REM | 3,562 | SQ FT | $0.6000 | $0.4000 | |
| 26 | 70307120 | TEMP PVT MK L4 T4 TAPE | 10,686 | FOOT | $1.25 | $1.15 | |
| 27 | 70400100 | TEMP CONC BARRIER | 600 | FOOT | $48.00 | $38.00 | |
| 28 | 70400200 | REL TEMP CONC BARRIER | 375 | FOOT | $18.00 | $24.00 | |
| 29 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $4,000.00 | $3,000.00 | |
| 30 | 70600260 | IMP ATTN TEMP FRN TL3 | 1 | EACH | $6,000.00 | $4,820.00 | |
| 31 | 70600332 | IMP ATTN REL FRN TL3 | 1 | EACH | $2,500.00 | $2,160.00 | |
| 32 | 70600350 | IMP ATTN REL NRD TL3 | 2 | EACH | $1,500.00 | $1,000.00 | |
| 33 | 78008210 | POLYUREA PM T1 LN 4 | 3,121 | FOOT | $2.43 | $2.43 | |
| 34 | 78008220 | POLYUREA PM T1 LN 5 | 884 | FOOT | $2.68 | $2.68 | |
| 35 | 78008240 | POLYUREA PM T1 LN 8 | 2,128 | FOOT | $3.96 | $3.96 | |
| 36 | 78008250 | POLYUREA PM T1 LN 12 | 588 | FOOT | $4.25 | $4.25 | |
| 37 | 78009004 | MOD URETH PM LINE 4 | 2,519 | FOOT | $2.22 | $2.22 | |
| 38 | 78009005 | MOD URETH PM LINE 5 | 315 | FOOT | $5.00 | $5.00 | |
| 39 | 78100100 | RAISED REFL PAVT MKR | 178 | EACH | $41.00 | $41.00 | |
| 40 | 78200011 | BARR WALL REF TYPE C | 78 | EACH | $11.00 | $7.00 | |
| 41 | 78300202 | PAVMT MRKG REM WTR BL | 4,389 | SQ FT | $1.25 | $1.10 |