FAU 1282 22 BJ
- Let date
- Friday, November 17, 2023
- Contract
- 62T36 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- (392-Ft) Bridge rehabilitation project and the scope consists of deck scarification, latex concrete overlay, joint replacement, approach slab and slope wall repairs on Tower Road over I-94/US41 (Edens Expressway) in the Villages of Glencoe and Northfield in Cook County. (SN 016-0815).
- Classification
- Deck scarification, latex concrete overlay, joint replacement, approach slab and slope wall repairs on Tower R
Bidders 5
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Lorig Construction Company Low bidder | $889,123 | ||
| 2 | Areatha Construction Co., Inc. | $978,595 | +10.1% | |
| 3 | Martam Construction Incorporated | $1,077,072 | +21.1% | |
| 4 | Herlihy Mid-Continent Company | $1,142,552 | +28.5% | |
| 5 | Rausch Infrastructure, LLC | $1,367,364 | +53.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Lorig Construct… | #2 Areatha Constru… | #3 Martam Construc… | #4 Herlihy Mid-Con… | #5 Rausch Infrastr… |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | K1004595 | PRUN SAFETY/EQUIP CLR | 1 | L SUM | $1,000.00 | $5,000.00 | $6,000.00 | $5,000.00 | $9,200.00 | |
| 2 | X0326766 | CLEAN RESEAL RLF JNT | 65 | FOOT | $80.00 | $80.35 | $90.00 | $87.00 | $134.00 | |
| 3 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $1,400.00 | $2,500.00 | $2,800.00 | $4,500.00 | $5,000.00 | |
| 4 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $90,000.00 | $16,900.00 | $86,000.00 | $60,000.00 | $40,000.00 | |
| 5 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $38,000.00 | $58,400.00 | $55,000.00 | $82,500.00 | $100,000.00 | |
| 6 | X7013820 | TR CONT SURVEIL EXPWY | 14 | CAL DA | $500.00 | $500.00 | $1,300.00 | $500.00 | $600.00 | |
| 7 | X7830050 | RRPM REFLECTOR REMOVL | 34 | EACH | $25.00 | $25.00 | $25.00 | $25.00 | $30.00 | |
| 8 | X7830052 | RRPM REFLECTOR REPLAC | 34 | EACH | $30.00 | $30.00 | $230.00 | $34.00 | $37.00 | |
| 9 | Z0001700 | APPR SLAB REPAIR (FD) | 48 | SQ YD | $1,300.00 | $1,061.15 | $880.00 | $640.00 | $1,200.00 | |
| 10 | Z0001800 | APPR SLAB REPAIR (PD) | 2 | SQ YD | $1,000.00 | $758.85 | $850.00 | $502.00 | $4,000.00 | |
| 11 | Z0001903 | STRUCT STEEL REMOV | 1,740 | POUND | $13.00 | $5.10 | $9.00 | $8.00 | $9.00 | |
| 12 | Z0001905 | STRUCT STEEL REPAIR | 960 | POUND | $35.00 | $41.30 | $35.00 | $50.25 | $70.00 | |
| 13 | Z0006012 | BR DK LTX C OLY 2 1/4 | 929 | SQ YD | $95.00 | $140.35 | $122.00 | $195.00 | $118.00 | |
| 14 | Z0012130 | BR DECK SCAR 3/4 | 929 | SQ YD | $45.00 | $103.65 | $53.00 | $65.00 | $79.00 | |
| 15 | Z0012754 | STR REP CON DP = < 5 | 331 | SQ FT | $190.00 | $171.90 | $195.00 | $200.12 | $225.00 | |
| 16 | Z0012755 | STR REP CON DP OVER 5 | 8 | SQ FT | $500.00 | $233.75 | $200.00 | $225.00 | $230.00 | |
| 17 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $5,000.00 | $2,500.00 | $6,000.00 | $15,000.00 | $10,000.00 | |
| 18 | Z0016001 | DECK SLAB REP (FD-T1) | 4 | SQ YD | $2,000.00 | $1,376.45 | $3,500.00 | $707.00 | $5,200.00 | |
| 19 | Z0016002 | DECK SLAB REP (FD-T2) | 4 | SQ YD | $2,000.00 | $1,376.45 | $3,200.00 | $707.00 | $5,200.00 | |
| 20 | Z0021916 | SILICONE JT SEAL 3 | 40 | FOOT | $100.00 | $87.50 | $80.00 | $135.00 | $110.00 | |
| 21 | Z0030850 | TEMP INFO SIGNING | 122 | SQ FT | $20.00 | $20.00 | $30.00 | $20.00 | $24.00 | |
| 22 | Z0049790 | RELOC NAME PLATES | 1 | EACH | $750.00 | $165.50 | $400.00 | $750.00 | $800.00 | |
| 23 | Z0064800 | SELECTIVE CLEARING | 30 | UNIT | $350.00 | $345.00 | $380.00 | $345.00 | $860.00 | |
| 24 | Z0073200 | TEMP SHORING & CRIB | 3 | EACH | $2,000.00 | $6,500.00 | $11,000.00 | $10,500.00 | $14,000.00 | |
| 25 | Z0073510 | TEMP TR SIGNAL TIMING | 5 | EACH | $300.00 | $600.00 | $1,800.00 | $300.00 | $370.00 | |
| 26 | 21101615 | TOPSOIL F & P 4 | 94 | SQ YD | $20.00 | $20.00 | $22.00 | $20.00 | $18.00 | |
| 27 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $6,000.00 | $6,000.00 | $8,000.00 | $6,000.00 | $9,000.00 | |
| 28 | 25000400 | NITROGEN FERT NUTR | 23 | POUND | $8.00 | $8.00 | $10.00 | $8.00 | $4.00 | |
| 29 | 25000500 | PHOSPHORUS FERT NUTR | 23 | POUND | $8.00 | $8.00 | $10.00 | $8.00 | $4.00 | |
| 30 | 25000600 | POTASSIUM FERT NUTR | 23 | POUND | $8.00 | $8.00 | $10.00 | $8.00 | $4.00 | |
| 31 | 25100630 | EROSION CONTR BLANKET | 94 | SQ YD | $7.50 | $7.50 | $9.00 | $7.50 | $11.00 | |
| 32 | 28100707 | STONE DUMP RIP CL A4 | 5 | SQ YD | $150.00 | $443.70 | $385.00 | $366.00 | $1,000.00 | |
| 33 | 31101200 | SUB GRAN MAT B 4 | 50 | SQ YD | $23.00 | $43.00 | $16.00 | $25.00 | $88.00 | |
| 34 | 40600290 | BIT MATLS TACK CT | 103 | POUND | $1.05 | $10.00 | $0.1000 | $0.0100 | $0.0100 | |
| 35 | 40600370 | LONG JOINT SEALANT | 160 | FOOT | $9.00 | $54.50 | $10.00 | $50.00 | $61.00 | |
| 36 | 40600982 | HMA SURF REM BUTT JT | 214 | SQ YD | $34.00 | $31.00 | $33.00 | $31.50 | $38.00 | |
| 37 | 40600985 | PCC SURF REM BUTT JT | 13 | SQ YD | $210.00 | $135.75 | $220.00 | $40.00 | $49.00 | |
| 38 | 40604060 | HMA SC IL-9.5 D N50 | 51 | TON | $410.00 | $258.25 | $420.00 | $335.00 | $400.00 | |
| 39 | 42001300 | PROTECTIVE COAT | 75 | SQ YD | $1.25 | $2.80 | $2.00 | $10.00 | $12.00 | |
| 40 | 44000500 | COMB CURB GUTTER REM | 226 | FOOT | $24.00 | $16.05 | $10.00 | $15.00 | $33.00 | |
| 41 | 44001980 | CONC BARRIER REMOV | 15 | FOOT | $200.00 | $383.50 | $265.00 | $65.00 | $640.00 | |
| 42 | 44201815 | CL D PATCH T2 14 | 14 | SQ YD | $400.00 | $626.55 | $485.00 | $400.00 | $490.00 | |
| 43 | 50102400 | CONC REM | 10.1 | CU YD | $2,100.00 | $1,490.20 | $1,800.00 | $2,150.00 | $3,000.00 | |
| 44 | 50104650 | SLOPE WALL REMOV | 15 | SQ YD | $200.00 | $349.25 | $165.00 | $265.00 | $780.00 | |
| 45 | 50157300 | PROTECTIVE SHIELD | 666 | SQ YD | $1.00 | $1.00 | $45.00 | $1.00 | $107.00 | |
| 46 | 50300255 | CONC SUP-STR | 11.1 | CU YD | $2,200.00 | $2,805.90 | $2,400.00 | $2,750.00 | $3,500.00 | |
| 47 | 50300260 | BR DECK GROOVING | 906 | SQ YD | $8.00 | $7.05 | $8.00 | $7.55 | $8.00 | |
| 48 | 50300300 | PROTECTIVE COAT | 963 | SQ YD | $1.00 | $2.35 | $1.00 | $3.00 | $6.00 | |
| 49 | 50500405 | F & E STRUCT STEEL | 1,470 | POUND | $22.00 | $21.50 | $18.00 | $44.94 | $20.00 | |
| 50 | 50800205 | REINF BARS, EPOXY CTD | 1,450 | POUND | $4.50 | $4.35 | $3.00 | $9.12 | $5.00 | |
| 51 | 51100100 | SLOPE WALL 4 | 15 | SQ YD | $355.00 | $727.20 | $365.00 | $250.00 | $308.00 | |
| 52 | 52000110 | PREF JT STRIP SEAL | 87 | FOOT | $200.00 | $293.50 | $245.00 | $275.00 | $245.00 | |
| 53 | 59000200 | EPOXY CRACK INJECTION | 45 | FOOT | $110.00 | $90.00 | $70.00 | $85.00 | $74.00 | |
| 54 | 60605000 | COMB CC&G TY B-6.24 | 226 | FOOT | $69.00 | $68.15 | $61.00 | $75.00 | $92.00 | |
| 55 | 63000001 | SPBGR TY A 6FT POSTS | 150 | FOOT | $36.00 | $32.15 | $34.00 | $32.12 | $39.00 | |
| 56 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $3,800.00 | $3,410.00 | $3,600.00 | $3,410.00 | $4,200.00 | |
| 57 | 63100167 | TR BAR TRM T1 SPL TAN | 3 | EACH | $3,400.00 | $3,116.00 | $3,400.00 | $3,116.00 | $3,800.00 | |
| 58 | 63200310 | GUARDRAIL REMOV | 106 | FOOT | $9.00 | $12.20 | $13.00 | $12.16 | $15.00 | |
| 59 | 63300575 | R&R RAIL ELEM EX GDRL | 20 | FOOT | $46.00 | $21.40 | $25.00 | $21.40 | $26.00 | |
| 60 | 63700805 | CONC BAR TRANS | 15 | FOOT | $400.00 | $538.90 | $852.00 | $750.00 | $2,000.00 | |
| 61 | 67100100 | MOBILIZATION | 1 | L SUM | $40,000.00 | $58,780.00 | $64,000.00 | $70,000.00 | $82,000.00 | |
| 62 | 70107025 | CHANGEABLE MESSAGE SN | 240 | CAL DA | $30.00 | $30.00 | $33.00 | $30.00 | $37.00 | |
| 63 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $100.00 | $490.95 | $5,000.00 | $1.00 | $15,000.00 | |
| 64 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 1,150 | FOOT | $0.7500 | $0.7500 | $0.8000 | $0.7500 | $0.9000 | |
| 65 | 70307120 | TEMP PVT MK L4 T4 TAPE | 5,020 | FOOT | $1.35 | $1.35 | $1.20 | $1.35 | $1.60 | |
| 66 | 70307125 | TEMP PVT MK L5 T4 TAPE | 1,260 | FOOT | $1.50 | $1.50 | $1.30 | $1.50 | $1.80 | |
| 67 | 70400100 | TEMP CONC BARRIER | 1,150 | FOOT | $24.00 | $38.85 | $32.00 | $30.00 | $33.00 | |
| 68 | 70600260 | IMP ATTN TEMP FRN TL3 | 2 | EACH | $8,100.00 | $4,960.00 | $5,200.00 | $4,960.00 | $5,400.00 | |
| 69 | 72501000 | TERMINAL MARKER - DA | 3 | EACH | $50.00 | $35.00 | $40.00 | $35.00 | $43.00 | |
| 70 | 78000200 | THPL PVT MK LINE 4 | 5,241 | FOOT | $0.9000 | $0.9000 | $1.50 | $0.9000 | $1.10 | |
| 71 | 78000300 | THPL PVT MK LINE 5 | 1,256 | FOOT | $1.15 | $1.15 | $1.80 | $1.12 | $1.30 | |
| 72 | 78000400 | THPL PVT MK LINE 6 | 110 | FOOT | $1.50 | $1.35 | $2.40 | $1.35 | $1.60 | |
| 73 | 78000500 | THPL PVT MK LINE 8 | 1,080 | FOOT | $2.00 | $1.80 | $3.00 | $1.79 | $2.20 | |
| 74 | 78000600 | THPL PVT MK LINE 12 | 402 | FOOT | $8.50 | $8.50 | $4.60 | $8.50 | $10.50 | |
| 75 | 78009000 | MOD URETH PM LTR-SYM | 84 | SQ FT | $31.00 | $31.00 | $12.00 | $24.00 | $38.20 | |
| 76 | 78009004 | MOD URETH PM LINE 4 | 1,300 | FOOT | $3.50 | $3.40 | $3.00 | $3.37 | $4.10 | |
| 77 | 78009006 | MOD URETH PM LINE 6 | 76 | FOOT | $5.25 | $5.10 | $5.00 | $5.06 | $6.20 | |
| 78 | 78009012 | MOD URETH PM LINE 12 | 66 | FOOT | $15.50 | $35.00 | $10.00 | $35.00 | $19.10 | |
| 79 | 78100100 | RAISED REFL PAVT MKR | 5 | EACH | $915.00 | $915.00 | $2,000.00 | $915.00 | $1,100.00 | |
| 80 | 78200005 | GRDRAIL REF TYPE A | 63 | EACH | $15.00 | $10.00 | $15.00 | $10.00 | $12.00 | |
| 81 | 78200011 | BARR WALL REF TYPE C | 50 | EACH | $20.00 | $20.00 | $12.00 | $20.00 | $24.00 | |
| 82 | 78300200 | RAISED REF PVT MK REM | 5 | EACH | $40.00 | $15.00 | $30.00 | $50.00 | $12.00 | |
| 83 | 78300202 | PVT MKG REM WTR BLAST | 7,153 | SQ FT | $0.8500 | $0.8500 | $3.30 | $0.8400 | $1.00 |