IDOT Jobs

2023 · 14 jobs · — Sign up free
★ My Jobs

Filtered by: County: Mclean Clear all

14 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 10, 2023 70541 McLeanDistrict 5 Bridge Superstructure Replacement at Kickapoo Creek 1 Mile North of US 136. — Executed Nov 26 New Stark Excavating, Inc. $2,231,946 ·
Mar 10, 2023 70907 McLeanDistrict 5 Culvert replacement on US 51B over ditch 0.1 mile North of RAAB Rd, in Normal, — Executed Nov 26 New Stark Excavating, Inc. $552,000 ·
Mar 10, 2023 70G18 McLeanDistrict 5 2.5 miles of longitudinal joint repair from Colton Ave. to Carnahan Dr. in Bloomington. — Rejected Nov 26 New Rowe Construction, a div of UCM, Inc. $407,070 ·
Apr 28, 2023 70A58 McLeanDistrict 5 2.23 Mi, Standard Overlay ADA Improvements, Clearwater Ave to Old Route 66 in Bloomington/Normal. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $7,537,504 ·
Apr 28, 2023 70E17 McLeanDistrict 5 10.67 Miles of Designed Overlay Resurfacing from Logan Co. Line to 1.8 Miles S. of Shirley. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $22,580,956 ·
Apr 28, 2023 70E86 McLeanDistrict 5 Resurfacing (3P) Standard Overlay of F.A.P. 693 (ILL 9) from 0.4 Mi E of ILL 165 to Arrowsmith Rd. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $5,524,703 ·
Apr 28, 2023 70F30 McLeanDistrict 5 7.281 Miles of Micro-Surfacing 1 Pass and Crack and Joint Sealing on US 24 from Mclean St. in Gridley to 0.4 mile West of 1-55 at Chenoa. — Executed Nov 26 New Beniach Construction Co., Inc. $644,599 ·
Apr 28, 2023 70G08 McLeanDistrict 5 2.615 Miles of Interstate Smart Overlay on I-74 from 0.4 Mile North of I-55 Business to 0.3 Mile East of US 51 at Bloomington and 1-55 Business from I-55 to 0.4 Mile North. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $7,968,555 ·
Apr 28, 2023 91621 McLeanDistrict 5 Resurfacing, Base course widening, concrete curb and gutter and rumble strips on CH 18 from State Street in Donvers to US 150. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $4,301,038 ·
Jun 16, 2023 70A88 McLeanDistrict 5 6.79 Mi., Standard Overlay 0.4 Mi. E of Grant St in Chenoa to Livingston Co. Line. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,924,420 ·
Jun 16, 2023 70G15 McLeanDistrict 5 0.292 Miles of Standard Overlay on FAS 488 (CH 53) from NB Ramp to SB Ramp of I-74 at Carlock Interchange. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $486,088 ·
Aug 4, 2023 70G83 McLeanDistrict 5 30.7 mi of patching on I-55 0.3 mi SW of Airport Rd to N of Turkey Creek W of Lexington; I-55 0.2 mi S of Six Points Rd to up RR; I-74 Veterans Parkway to 1 mi S of Chestnut St SW of Leroy; I-74 Carlock to I-55 N of Bloomington; I-74 at Carlock weigh station ramps. — Executed Nov 26 New Kinney Contractors, Inc. $762,847 ·
Aug 4, 2023 70G84 McLeanDistrict 5 1.34 mi of longitudinal joint repair W of Colton Ave to Empire Crossing in Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $433,701 ·
Nov 17, 2023 70G12 McLeanDistrict 5 Bridge painting of 3 structures on FAI 55 (I-55) and FAP 704 (I-55 Busn). — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $1,273,331 ·
1–14 of 14

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.