Filtered by: County: Mclean Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 10, 2023 | 70541 | McLeanDistrict 5 | Bridge Superstructure Replacement at Kickapoo Creek 1 Mile North of US 136. | — | Executed | Stark Excavating, Inc. $2,231,946 · | ||
| Mar 10, 2023 | 70907 | McLeanDistrict 5 | Culvert replacement on US 51B over ditch 0.1 mile North of RAAB Rd, in Normal, | — | Executed | Stark Excavating, Inc. $552,000 · | ||
| Mar 10, 2023 | 70G18 | McLeanDistrict 5 | 2.5 miles of longitudinal joint repair from Colton Ave. to Carnahan Dr. in Bloomington. | — | Rejected | Rowe Construction, a div of UCM, Inc. $407,070 · | ||
| Apr 28, 2023 | 70A58 | McLeanDistrict 5 | 2.23 Mi, Standard Overlay ADA Improvements, Clearwater Ave to Old Route 66 in Bloomington/Normal. | — | Executed | Rowe Construction, a div of UCM, Inc. $7,537,504 · | ||
| Apr 28, 2023 | 70E17 | McLeanDistrict 5 | 10.67 Miles of Designed Overlay Resurfacing from Logan Co. Line to 1.8 Miles S. of Shirley. | — | Executed | Rowe Construction, a div of UCM, Inc. $22,580,956 · | ||
| Apr 28, 2023 | 70E86 | McLeanDistrict 5 | Resurfacing (3P) Standard Overlay of F.A.P. 693 (ILL 9) from 0.4 Mi E of ILL 165 to Arrowsmith Rd. | — | Executed | Rowe Construction, a div of UCM, Inc. $5,524,703 · | ||
| Apr 28, 2023 | 70F30 | McLeanDistrict 5 | 7.281 Miles of Micro-Surfacing 1 Pass and Crack and Joint Sealing on US 24 from Mclean St. in Gridley to 0.4 mile West of 1-55 at Chenoa. | — | Executed | Beniach Construction Co., Inc. $644,599 · | ||
| Apr 28, 2023 | 70G08 | McLeanDistrict 5 | 2.615 Miles of Interstate Smart Overlay on I-74 from 0.4 Mile North of I-55 Business to 0.3 Mile East of US 51 at Bloomington and 1-55 Business from I-55 to 0.4 Mile North. | — | Executed | Rowe Construction, a div of UCM, Inc. $7,968,555 · | ||
| Apr 28, 2023 | 91621 | McLeanDistrict 5 | Resurfacing, Base course widening, concrete curb and gutter and rumble strips on CH 18 from State Street in Donvers to US 150. | — | Executed | Rowe Construction, a div of UCM, Inc. $4,301,038 · | ||
| Jun 16, 2023 | 70A88 | McLeanDistrict 5 | 6.79 Mi., Standard Overlay 0.4 Mi. E of Grant St in Chenoa to Livingston Co. Line. | — | Executed | Kankakee Valley Construction Company, Inc. $3,924,420 · | ||
| Jun 16, 2023 | 70G15 | McLeanDistrict 5 | 0.292 Miles of Standard Overlay on FAS 488 (CH 53) from NB Ramp to SB Ramp of I-74 at Carlock Interchange. | — | Executed | Rowe Construction, a div of UCM, Inc. $486,088 · | ||
| Aug 4, 2023 | 70G83 | McLeanDistrict 5 | 30.7 mi of patching on I-55 0.3 mi SW of Airport Rd to N of Turkey Creek W of Lexington; I-55 0.2 mi S of Six Points Rd to up RR; I-74 Veterans Parkway to 1 mi S of Chestnut St SW of Leroy; I-74 Carlock to I-55 N of Bloomington; I-74 at Carlock weigh station ramps. | — | Executed | Kinney Contractors, Inc. $762,847 · | ||
| Aug 4, 2023 | 70G84 | McLeanDistrict 5 | 1.34 mi of longitudinal joint repair W of Colton Ave to Empire Crossing in Bloomington. | — | Executed | Rowe Construction, a div of UCM, Inc. $433,701 · | ||
| Nov 17, 2023 | 70G12 | McLeanDistrict 5 | Bridge painting of 3 structures on FAI 55 (I-55) and FAP 704 (I-55 Busn). | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,273,331 · |
1–14 of 14
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.