Filtered by: County: Cook Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 18, 2026 | 61K82 | CookDistrict 1 | HMA resurfacing and widening at the intersection of Waukegan Rd. and East Lake Avenue in the village of Glenview. Additional work includes storm sewers, curb and gutter, traffic signal modernization, lighting, pavement marking and other required work. | — | Executed | |||
| Sep 18, 2026 | 61M29 | CookDistrict 1 | Full depth pavement reconstruction of Willow Rd. from Forestway Dr. to Provident Ave. in the village of Winnetka. Work includes PCC pavement, curb and gutter, sidewalk, drainage improvements, traffic signals, lighting and other required work. | — | Awarded | |||
| Sep 18, 2026 | 61M58 | CookDistrict 1 | Construction of a shared-use path from Strieby Drive to Fullerton Avenue in the River Grove Forest Protection District. Includes aggregate and HMA, precast concrete boardwalk, sidewalk, and traffic signal modernization. | — | Active | |||
| Sep 18, 2026 | 61M63 | CookDistrict 1 | HMA resurfacing on George Street from North Avenue (IL 64 to the north village limit of Melrose Park. Includes curb and gutter, sidewalk, water main installation and pavement markings. | — | Active | |||
| Sep 18, 2026 | 61M64 | CookDistrict 1 | HMA resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue in Western Springs. Includes patching, curb and gutter, sidewalks with ADA ramps, drainage improvements and flashing beacons. | — | Active | |||
| Sep 18, 2026 | 61M66 | CookDistrict 1 | Pedestrian signing and pavement markings to upgrade existing shared-use paths and bicycle routes at various locations in Glenview. | — | Active | |||
| Sep 18, 2026 | 62V55 | CookDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course Smart Overlay, ADA and APS improvements consist of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, installation of raised reflective pavement markers, placement of thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. | — | Executed | Gallagher Asphalt Corporation $3,712,308 · | ||
| Sep 18, 2026 | 62X09 | CookDistrict 1 | (1.33-Mile) Drainage Improvements of the Frontage Road Storm Sewers (FRS) in Harrison Street that include Open Cut Trenching and Jacking Sewer Installation for storm sewer size 66-, jacking and receiving chambers, pavement removal, backfilling, roadway reconstruction and patching, resurfacing, relocation of water main and combined sewers along Harrison Street, and jacking water main and combined sewers under I-290. Location is on Harrison Street and Bataan Dr. from West of 21st Ave. to East of 1 | — | Active | |||
| Sep 18, 2026 | 80D33 | CookDistrict 1 | (3.44-Mile) SMART Overlay, bridge latex overlay, and ADA improvement includes (HMA) removal, pavement patching, resurfacing with (HMA), drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, sidewalk replacement, curb and gutter replacement, pedestrian signals, detector loops, hydro-scarification, deck slab repair, diamond grinding, joint replacement with strip seals, replace diaphragms, approach slab repair, concrete sealer, asphalt butt joints, rel | — | Executed | K-Five Construction Corporation $6,437,242 · | ||
| Sep 18, 2026 | 80D39 | CookDistrict 1 | (2.46-Mile) Crack and Joint Sealant improvement consisting of routing, cleaning and sealing of longitudinal cracks and joints within the hot-mix asphalt pavement, restriping with modified urethane pavement marking. This improvement is located within the City of Berwyn and the Town of Cicero in Cook County. | — | Executed |
1–10 of 10
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.