| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| 56103000 | D I WATER MAIN 6 | FOOT | 82 | $109.95 | Jul 31, 2026 |
| 78005110 | EPOXY PVT MK LINE 4 | FOOT | 82 | $0.5249 | Jul 31, 2026 |
| X8809005 | LED SF LENS COVER | EACH | 82 | $494.61 | Sep 18, 2026 |
| Z0062458 | TEMP PAVEMT VAR DEPTH | TON | 82 | $118.12 | Jul 31, 2026 |
| 48101600 | AGGREGATE SHLDS B 8 | SQ YD | 81 | $17.48 | Jun 12, 2026 |
| 60108104 | PIPE UNDERDR T 1 4 | FOOT | 81 | $8.59 | Jul 31, 2026 |
| 70107007 | PAVT MK BLKOUT TAPE 7 | FOOT | 81 | $2.81 | Jun 12, 2026 |
| 80500100 | SERV INSTALL TY A | EACH | 81 | $5,323.39 | Jul 31, 2026 |
| 89501250 | RELOC EX TS EQUIP | EACH | 81 | $2,504.71 | Sep 18, 2026 |
| X5509900 | ABANDON FILL SS | FOOT | 81 | $64.41 | Sep 18, 2026 |
| Z0015500 | DEBRIS REMOVAL | L SUM | 81 | $14,694.32 | Jun 12, 2026 |
| 28000315 | AGG DITCH CHECKS | TON | 80 | $75.79 | Jun 12, 2026 |
| 70600240 | IMP ATTN TEMP NRD TL2 | EACH | 80 | $3,364.70 | Apr 24, 2026 |
| 84100110 | REM TEMP LIGHT UNIT | EACH | 80 | $1,015.29 | Jul 31, 2026 |
| 87700240 | S MAA & P 40 | EACH | 80 | $15,954.08 | Sep 18, 2026 |
| X0326812 | CAT 5 ETHERNET CABLE | FOOT | 80 | $4.42 | Jul 31, 2026 |
| X8900104 | TEMP TR SIGNAL TIMING | EACH | 80 | $1,097.36 | Sep 18, 2026 |
| Z0043800 | P P CONC I-BM REPAIR | SQ FT | 80 | $251.59 | Jul 31, 2026 |
| 42000301 | PCC PVT 8 JOINTED | SQ YD | 79 | $70.60 | Sep 18, 2026 |
| 51603000 | DRILLED SHAFT IN SOIL | CU YD | 79 | $891.77 | Jun 12, 2026 |
| 52200900 | CONC STR RETAIN WALL | CU YD | 79 | $1,412.05 | Jul 31, 2026 |
| 81300530 | JUN BX SS AS 12X10X6 | EACH | 79 | $1,530.00 | Jul 31, 2026 |
| 82500350 | LT CONT BASEM 240V100 | EACH | 79 | $13,819.02 | Jun 12, 2026 |
| 88200100 | TS BACKPLATE | EACH | 79 | $284.14 | Sep 18, 2026 |
| X0326643 | LITTER PICKING | MILE | 79 | $700.69 | Jun 12, 2026 |
| Z0007103 | C&D LEAD PT CL RS N3 | L SUM | 79 | $32,994.43 | Jun 12, 2026 |
| Z0054400 | ROCK FILL | CU YD | 79 | $51.05 | Jul 31, 2026 |
| 20200200 | ROCK EXCAVATION | CU YD | 78 | $53.96 | Apr 24, 2026 |
| 50300285 | FORM LINER TEX SURF | SQ FT | 78 | $14.04 | Jul 31, 2026 |
| 542D0217 | P CUL CL D 1 12 | FOOT | 78 | $65.23 | Jun 12, 2026 |
| 56400400 | FIRE HYDNTS RELOCATED | EACH | 78 | $5,511.73 | Jul 31, 2026 |
| 60208240 | CB TC T24F&G | EACH | 78 | $2,322.25 | Jun 12, 2026 |
| 78008240 | POLYUREA PM T1 LN 8 | FOOT | 78 | $2.12 | Apr 24, 2026 |
| 88030080 | SH LED 1F 4S MAM | EACH | 78 | $1,126.76 | Sep 18, 2026 |
| AR620525 | PAVEMENT MARKING-BLACK BORDER | SQ FT | 78 | $1.47 | Aug 5, 2022 |
| X1400238 | LUMINAIRE LED SPECIAL | EACH | 78 | $1,712.21 | Jul 31, 2026 |
| Z0004002 | BOLLARDS | EACH | 78 | $1,121.62 | Jun 12, 2026 |
| Z0004556 | HMA SURFACE RM (DECK) | SQ YD | 78 | $15.39 | Sep 18, 2026 |
| Z0005216 | HMA STAB 6 AT SPBGR | SQ YD | 78 | $44.34 | Mar 7, 2025 |
| 44201827 | CL D PATCH T2 15 | SQ YD | 77 | $146.48 | Sep 18, 2026 |
| 52100020 | ELAST BEARING ASSY T2 | EACH | 77 | $2,806.93 | Apr 24, 2026 |
| 59200104 | BRIDGE WASHING N4 | EACH | 77 | $19,497.88 | Jun 12, 2026 |
| 70300912 | PAVT MARK TAPE T4 12 | FOOT | 77 | $2.50 | Nov 5, 2021 |
| 78008200 | POLYUREA PM T1 LTR-SY | SQ FT | 77 | $11.30 | Sep 18, 2026 |
| 81400730 | HANDHOLE C CONC | EACH | 77 | $1,971.37 | Jul 31, 2026 |
| 87700180 | S MAA & P 28 | EACH | 77 | $13,270.51 | Sep 18, 2026 |
| X0327698 | LED IN IL STNAME SIGN | EACH | 77 | $3,878.01 | Jul 31, 2026 |
| X7810300 | REC REF PVT MARKER | EACH | 77 | $32.25 | Sep 18, 2026 |
| XZ013798 | CONSTR STA LAYOUT | L SUM | 77 | $8,672.93 | Jul 31, 2026 |
| Z0028415 | GEOTECHNICAL REINF | SQ YD | 77 | $2.67 | Mar 7, 2025 |
| 44201007 | CL B PATCH T2 13 | SQ YD | 76 | $234.30 | Jul 31, 2026 |
| 44201749 | CL D PATCH T1 9 | SQ YD | 76 | $29.68 | Jul 31, 2026 |
| 48203023 | HMA SHOULDERS 6 1/2 | SQ YD | 76 | $45.75 | Jun 12, 2026 |
| 52200015 | PERM SHT PILING | SQ FT | 76 | $38.61 | Jul 31, 2026 |
| 70100455 | TRAF CONT-PROT 701206 | L SUM | 76 | $3,607.15 | Sep 18, 2026 |
| 70100815 | TRAF CONT-PROT 701446 | L SUM | 76 | $71,582.16 | Jun 12, 2026 |
| 81100320 | CON AT ST 1 PVC GS | FOOT | 76 | $57.79 | Jul 31, 2026 |
| 87700270 | S MAA & P 46 | EACH | 76 | $17,001.74 | Sep 18, 2026 |
| 89501410 | REL EM VEH PR SYS P U | EACH | 76 | $212.84 | Jul 31, 2026 |
| X8760201 | PED PUSHBUTTON POST | EACH | 76 | $1,628.96 | Jun 12, 2026 |
| Z0033072 | VIDEO VEH DET SYS | EACH | 76 | $37,361.80 | Apr 26, 2024 |
| 21101600 | TOPSOIL F & P VAR DP | SQ YD | 75 | $7.24 | Sep 18, 2026 |
| 40603315 | HMA SC "C" N70 | TON | 75 | $84.12 | Jan 17, 2020 |
| 550A0160 | STORM SEW CL A 1 36 | FOOT | 75 | $147.09 | Jul 31, 2026 |
| 56103300 | D I WATER MAIN 12 | FOOT | 75 | $157.57 | Jul 31, 2026 |
| 56400100 | FIRE HYDNTS TO BE MVD | EACH | 75 | $5,286.66 | Jun 12, 2026 |
| 60250400 | CB ADJ NEW T1F OL | EACH | 75 | $862.98 | Feb 27, 2026 |
| 87700170 | S MAA & P 26 | EACH | 75 | $11,763.70 | Jun 12, 2026 |
| 87700190 | S MAA & P 30 | EACH | 75 | $12,692.36 | Jun 12, 2026 |
| X0326898 | CENTERLN RUM STRIP 16 | FOOT | 75 | $0.7251 | Jun 14, 2024 |
| Z0056616 | STORM SEW WM REQ 24 | FOOT | 75 | $193.53 | Jul 31, 2026 |
| Z0070202 | SURVEY MARKER VAULT | EACH | 75 | $1,170.09 | Apr 25, 2025 |
| 44000151 | HMA SURF REM 1/2 | SQ YD | 74 | $1.23 | Jun 12, 2026 |
| 45200300 | JT OR CRACK FILLING | POUND | 74 | $1.96 | Sep 18, 2026 |
| 51201900 | FUR STL PILE HP14X89 | FOOT | 74 | $87.50 | Sep 18, 2026 |
| 60624600 | CORRUGATED MED | SQ FT | 74 | $17.81 | Sep 18, 2026 |
| 87700280 | S MAA & P 48 | EACH | 74 | $18,172.11 | Sep 18, 2026 |
| X2501800 | SEEDING CL 4 MOD | ACRE | 74 | $3,032.90 | Jun 12, 2026 |
| X5537900 | SS CLEANED 15 | FOOT | 74 | $7.79 | Jun 12, 2026 |
| X7010218 | TRAF CONT & PROT SPL | EACH | 74 | $1,636.15 | Sep 18, 2026 |
| XP000001 | JOURNEY ELECTRICIAN | HOUR | 74 | $121.98 | Sep 18, 2026 |
| XP000009 | PICK-UP TRUCK | HOUR | 74 | $16.78 | Sep 18, 2026 |
| 42000401 | PCC PVT 9 JOINTED | SQ YD | 73 | $79.84 | Sep 18, 2026 |
| 44000153 | HMA SURF REM 1 | SQ YD | 73 | $2.39 | Jun 12, 2026 |
| 50201122 | COFFERDAM TYP 2 LOC 2 | EACH | 73 | $120,258.62 | Jun 12, 2026 |
| 63800920 | MOD GLAR SCR SYS TEMP | FOOT | 73 | $9.57 | Sep 18, 2026 |
| 87700260 | S MAA & P 44 | EACH | 73 | $16,400.56 | Sep 18, 2026 |
| 89501150 | RELOC EX TS POST | EACH | 73 | $813.25 | Jun 12, 2026 |
| AR401650 | BITUMINOUS PAVEMENT MILLING | SQ YD | 73 | $3.71 | Aug 5, 2022 |
| X2503110 | MOWING SPL | ACRE | 73 | $347.82 | Sep 18, 2026 |
| X7200203 | DETOUR SIGNING | L SUM | 73 | $34,225.25 | Sep 18, 2026 |
| X8300001 | LIGHT POLE SPECIAL | EACH | 73 | $7,900.68 | Apr 24, 2026 |
| 28100205 | STONE RIPRAP CL A3 | TON | 72 | $55.62 | Sep 18, 2026 |
| 44003510 | MEDIAN REMOVAL (PD) | SQ FT | 72 | $2.15 | Sep 18, 2026 |
| 48100100 | AGGREGATE SHLDS A | TON | 72 | $37.65 | Jun 12, 2026 |
| 51604000 | DRILLED SHAFT IN ROCK | CU YD | 72 | $2,849.17 | Jun 12, 2026 |
| 52200250 | UNTREATED TIMBER LAG | SQ FT | 72 | $17.48 | Jun 12, 2026 |
| 53212754 | STR REP CON DP = < 5 | SQ FT | 72 | $188.82 | Sep 18, 2026 |
| 542A0241 | P CUL CL A 1 36 | FOOT | 72 | $176.74 | Jul 31, 2026 |
| 59200105 | BRIDGE WASHING N5 | EACH | 72 | $17,357.80 | Jun 12, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.