| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| A2C049G5 | T-QUERC ALBA CG 5G | EACH | 2 | $104.84 | Jun 14, 2019 |
| A2C056G5 | T-QUERC MACR CG 5G | EACH | 2 | $85.66 | Jul 31, 2020 |
| A2C35G15 | T-QUERC BICL 15G RPMS | EACH | 2 | $254.69 | Jun 15, 2018 |
| A3005014 | T-GYMNO DIO S LATTE 2 | EACH | 2 | $467.70 | Aug 2, 2024 |
| A3005214 | T-ZELKOVA SER 3 | EACH | 2 | $624.75 | Apr 28, 2023 |
| AR101900 | BEACON REMOVAL | EACH | 2 | $3,750.00 | Aug 5, 2022 |
| AR103410 | BEACON TOWER | EACH | 2 | $68,202.50 | Aug 5, 2022 |
| AR103900 | REMOVE BEACON TOWER | EACH | 2 | $12,803.50 | Aug 5, 2022 |
| AR107408 | L-806 WIND CONE-8' LIGHTED | EACH | 2 | $13,649.56 | Aug 5, 2022 |
| AR107900 | REMOVE WIND CONE | EACH | 2 | $1,877.00 | Apr 26, 2019 |
| AR108040 | 1/C #4/0 600V UG CABLE | L.F. | 2 | $12.59 | Jun 17, 2022 |
| AR108082 | 1/C #2 XLP-USE | L.F. | 2 | $4.00 | Apr 26, 2019 |
| AR108208 | 2/C #8 5 KV UG CABLE | L.F. | 2 | $4.13 | Jan 15, 2021 |
| AR108402 | 1/C #2 600 V UG CABLE | L.F. | 2 | $4.10 | Jul 30, 2021 |
| AR108658 | 3/C #8 600 V UG CABLE IN UD | L.F. | 2 | $6.07 | Apr 26, 2019 |
| AR109410 | VAULT WIRING | L.S. | 2 | $5,000.00 | Sep 17, 2021 |
| AR110101 | CABLE MARKER | EACH | 2 | $560.00 | Jan 21, 2022 |
| AR110102 | DUCT MARKER - IN PAVEMENT | EACH | 2 | $212.05 | Apr 23, 2021 |
| AR110203 | 3" PVC DUCT, DIRECT BURY | L.F. | 2 | $13.39 | Nov 9, 2018 |
| AR110212 | 2" STEEL DUCT, DIRECT BURY | L.F. | 2 | $23.87 | Apr 24, 2020 |
| AR110213 | 3" STEEL DUCT, DIRECT BURY | L.F. | 2 | $115.82 | Mar 11, 2022 |
| AR110214 | 4" STEEL DUCT, DIRECT BURY | L.F. | 2 | $172.76 | Jun 17, 2022 |
| AR110508 | 8-WAY CONCRETE ENCASED DUCT | L.F. | 2 | $165.80 | Jun 17, 2022 |
| AR110550 | SPLIT DUCT | L.F. | 2 | $411.92 | Jul 30, 2021 |
| AR110600 | CONCRETE UTILITY PAD | EACH | 2 | $5,229.00 | Nov 6, 2020 |
| AR110615 | ELECTRICAL HANDHOLE, HIGH VOLTAGE | EACH | 2 | $7,409.13 | Jun 11, 2021 |
| AR110710 | ELECTRICAL MANHOLE | EACH | 2 | $5,720.00 | Nov 9, 2018 |
| AR110901 | CONCRETE DUCT REMOVAL | L.F. | 2 | $50.00 | Mar 5, 2021 |
| AR125106 | RELOC. ELEV. RETROREFLECTIVE MARKER | EACH | 2 | $221.98 | Jul 30, 2021 |
| AR125449 | TAXI GUIDANCE SIGN, 9 CHARACTER | EACH | 2 | $10,519.30 | Apr 29, 2022 |
| AR125462 | TAXI GUIDANCE SIGN, UNLIT | EACH | 2 | $3,060.00 | Aug 2, 2019 |
| AR125511 | MIRL, BASE MOUNTED-LED | EACH | 2 | $2,444.07 | Jan 21, 2022 |
| AR125515 | HIRL, BASE MOUNTED | EACH | 2 | $2,399.65 | Jun 11, 2021 |
| AR125546 | MI THRESHOLD LIGHT BASE MTD-LED | EACH | 2 | $2,380.67 | Jan 21, 2022 |
| AR125561 | RUNWAY DISTANCE REMAINING SIGN-LED | EACH | 2 | $7,159.00 | Jan 21, 2022 |
| AR125620 | ABBREVIATED PAPI (L-881 SYSTEM) | EACH | 2 | $19,995.00 | Sep 20, 2019 |
| AR125903 | REMOVE INPAVEMENT LIGHT | EACH | 2 | $2,558.33 | Jun 11, 2021 |
| AR125907 | REMOVE REILS | PAIR | 2 | $1,895.11 | Apr 24, 2020 |
| AR125908 | REMOVE PAPI | EACH | 2 | $3,558.13 | Mar 6, 2020 |
| AR125922 | REPLACE BASE MOUNTED LIGHT | EACH | 2 | $1,771.54 | Jan 21, 2022 |
| AR125931 | REPLACE LIGHT LENSE | EACH | 2 | $253.21 | Jul 30, 2021 |
| AR151412 | TREE CLEARING | ACRE | 2 | $12,285.35 | Aug 2, 2019 |
| AR151429 | STUMP REMOVAL 0.0-2.5 FT. DIA. | EACH | 2 | $131.40 | Jan 21, 2022 |
| AR152443 | OFFSITE TOPSOIL | CU YD | 2 | $54.46 | Aug 5, 2022 |
| AR152455 | EMBANKMENT IN PLACE | C.Y. | 2 | $16.99 | Jan 15, 2021 |
| AR152460 | TOPSOIL STRIPPING | C.Y. | 2 | $79.04 | Apr 23, 2021 |
| AR152610 | BUILDING DEMOLITION | L.S. | 2 | $42,844.50 | Jan 21, 2022 |
| AR154604 | GRANULAR DRAINAGE SUBBASE - 4" | S.Y. | 2 | $7.99 | Jan 15, 2021 |
| AR155540 | BY-PRODUCT LIME | TON | 2 | $122.80 | Jan 15, 2021 |
| AR156514 | DITCH CHECK | L.F. | 2 | $14.15 | Mar 8, 2019 |
| AR156516 | AGGREGATE DITCH CHECK | EACH | 2 | $1,516.67 | Jan 18, 2019 |
| AR156534 | TURF REINFORCING MAT | S.Y. | 2 | $19.22 | Nov 6, 2020 |
| AR161910 | REMOVE CLASS C GATE | EACH | 2 | $929.84 | Jan 15, 2021 |
| AR162531 | WALKWAY GATES, CLASS E | EACH | 2 | $1,112.50 | Aug 2, 2019 |
| AR162610 | CLASS E GATE-10' | EACH | 2 | $4,617.82 | Apr 23, 2021 |
| AR162624 | CLASS E GATE-24' | EACH | 2 | $7,414.74 | Jul 30, 2021 |
| AR162750 | DETECTOR LOOP | L.S. | 2 | $4,343.06 | Mar 6, 2020 |
| AR162810 | CLASS E FENCE 10' W/2' BURY | L.F. | 2 | $94.28 | Jun 17, 2022 |
| AR162948 | ADJUST ELECTRIC GATE | EACH | 2 | $1,569.20 | Apr 23, 2021 |
| AR208910 | REMOVE & REPLACE AGGREGATE BASE | S.Y. | 2 | $9.01 | Jan 18, 2019 |
| AR209613 | CRUSHED AGG. BASE COURSE - 13" | S.Y. | 2 | $28.49 | Nov 6, 2020 |
| AR401111 | PAVEMENT PREPARATION | SQ YD | 2 | $5.67 | Jan 21, 2022 |
| AR401662 | SURFACE COURSE CRACK REPAIR | SQ YD | 2 | $60.39 | Aug 5, 2022 |
| AR403611 | BITUMINOUS BASE COURSE-METHOD I | TON | 2 | $91.43 | Aug 3, 2018 |
| AR403621 | BIT. BASE CSE., LEVELING, SUPERPAVE | TON | 2 | $124.48 | Jan 21, 2022 |
| AR501120 | RUBBLIZE PAVEMENT | S.Y. | 2 | $4.28 | Jun 12, 2020 |
| AR501501 | TEST BATCH PCC CONCRETE | EACH | 2 | $1,358.93 | Nov 9, 2018 |
| AR501511 | 11" PCC PAVEMENT | S.Y. | 2 | $69.02 | Nov 6, 2020 |
| AR501604 | 4" PCC SIDEWALK | S.F. | 2 | $9.58 | Jan 15, 2021 |
| AR501690 | PCC SIDEWALK REMOVAL | S.F. | 2 | $2.25 | Jan 18, 2019 |
| AR501905 | REMOVE PAVEMENT | S.Y. | 2 | $23.54 | Nov 6, 2020 |
| AR605541 | CLEAN & SEAL CRACKS | L.F. | 2 | $2.59 | Jul 31, 2020 |
| AR605542 | CLEAN & SEAL EXPANSION JOINTS | L.F. | 2 | $24.56 | Mar 6, 2020 |
| AR620510 | PAVEMENT MARKING | S.F. | 2 | $2.07 | Jun 15, 2018 |
| AR620555 | PREFORMED THERMOPLASTIC | S.F. | 2 | $22.84 | Jul 31, 2020 |
| AR701212 | 12" CMP | L.F. | 2 | $91.45 | Jan 18, 2019 |
| AR701318 | 18" RCP, CLASS II | L.F. | 2 | $63.18 | Mar 8, 2019 |
| AR705620 | UNDERDRAIN END SECTION | EACH | 2 | $529.38 | Nov 9, 2018 |
| AR705943 | ADJUST UNDERDRAIN INSP. HOLE | EACH | 2 | $641.60 | Apr 29, 2022 |
| AR705945 | ADJUST COLLECTION STRUCTURE | EACH | 2 | $893.02 | Aug 5, 2022 |
| AR751410 | INLET | EACH | 2 | $6,690.86 | Nov 6, 2020 |
| AR751530 | MANHOLE | EACH | 2 | $13,727.59 | Nov 6, 2020 |
| AR751550 | MANHOLE 5' | EACH | 2 | $3,500.00 | Jan 18, 2019 |
| AR751920 | REPLACE INLET | EACH | 2 | $7,355.42 | Apr 26, 2019 |
| AR751927 | REPLACE FRAME & GRATE | EACH | 2 | $511.30 | Jan 18, 2019 |
| AR752421 | PRECAST REINFORCED CONC. FES 21" | EACH | 2 | $1,680.00 | Aug 3, 2018 |
| AR752430 | PRECAST REINFORCED CONC. FES 30" | EACH | 2 | $1,940.73 | Nov 6, 2020 |
| AR754610 | PAVED DITCH | L.F. | 2 | $34.07 | Jan 21, 2022 |
| AR760999 | WELL ABANDONMENT | EACH | 2 | $8,750.00 | Jun 17, 2022 |
| AR770506 | 6" SANITARY SEWER | L.F. | 2 | $49.74 | Nov 6, 2020 |
| AR770704 | SANITARY MANHOLE 4' | EACH | 2 | $4,317.15 | Nov 6, 2020 |
| AR770908 | REMOVE SEPTIC SYSTEM | L.S. | 2 | $3,814.65 | Jan 21, 2022 |
| AR800056 | VAULT FOUNDATION AND FLOOR | L.S. | 2 | $20,536.19 | Jun 17, 2022 |
| AR800085 | RETROFIT EXIST EDGE LIGHT OR GUIDAN | EACH | 2 | $814.88 | Jan 21, 2022 |
| AR800140 | 2 1/C #6 XLP-USE, 1/C #10 GND-1" UD | L.F. | 2 | $9.43 | Mar 5, 2021 |
| AR800162 | MULCHING | S.Y. | 2 | $3.03 | Nov 6, 2020 |
| AR800872 | 2 #4 XLP-USE 600V, 1 #8 GND IN 1-1/ | L.F. | 2 | $10.86 | Mar 11, 2022 |
| AR800905 | EDGE REPAIR | S.Y. | 2 | $82.12 | Jan 18, 2019 |
| AR800907 | INFILTRATION TRENCH | L.F. | 2 | $58.08 | Jan 18, 2019 |
| AR801759 | WILDLIFE DETERRENT BARRIER | L.F. | 2 | $18.99 | Apr 23, 2021 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.