| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| A2004524 | T-GINKGO BIL PS 3 | EACH | 3 | $828.41 | Jan 16, 2026 |
| A2004621 | T-GLED TR-I IMP 3 | EACH | 3 | $634.55 | Jan 16, 2026 |
| A2004700 | T-GLEDIT TRI IN 2" | EACH | 3 | $399.00 | Jun 16, 2023 |
| A2005328 | T-LIQUDAMB STYR MOR 2 | EACH | 3 | $464.84 | Sep 20, 2024 |
| A2005330 | T-LIQUDAMB STYR 2-1/2 | EACH | 3 | $550.00 | Apr 24, 2026 |
| A2005466 | T-M POMF WH SHLD 2BB | EACH | 3 | $522.33 | Sep 20, 2024 |
| A2005820 | T-PLATANUS OCC 2-1/2 | EACH | 3 | $535.11 | Apr 26, 2024 |
| A2006316 | T-PRUNUS SERO 2 | EACH | 3 | $459.21 | Jun 17, 2022 |
| A2006515 | T-QUERCUS BICOL B&M 2 | EACH | 3 | $517.46 | Apr 24, 2026 |
| A2006600 | T-QUERCUS COCCI 1-3/4 | EACH | 3 | $385.86 | Sep 19, 2025 |
| A2006606 | T-QUERCUS COCCI 2-1/2 | EACH | 3 | $654.29 | Jan 17, 2025 |
| A2006812 | T-QUERCUS MUEH 1-1/2 | EACH | 3 | $500.43 | Jun 12, 2026 |
| A2006914 | T-QUERCUS PALUS 1-3/4 | EACH | 3 | $401.93 | Jan 21, 2022 |
| A2007102 | T-QUERC ROB ALBA 2 | EACH | 3 | $711.54 | Apr 24, 2026 |
| A2007114 | T-QUERCUS RUBRA 1-3/4 | EACH | 3 | $492.29 | Jun 12, 2026 |
| A2007132 | T-QUERCUS SCHUETTI 2 | EACH | 3 | $531.76 | Apr 24, 2026 |
| A2007632 | T-TAXODIUM DIS 4 | EACH | 3 | $711.90 | Jun 16, 2023 |
| A2007724 | T-TAXODI DIS SB 3 | EACH | 3 | $662.67 | Nov 7, 2025 |
| A2008320 | T-TILIA TOMEN 2-1/2 | EACH | 3 | $639.92 | Apr 24, 2026 |
| A2008748 | T-ULMUS X FRNTR 3 MH | EACH | 3 | $740.74 | Mar 7, 2025 |
| A2008750 | T-ULMUS X PAT PE 3 TF | EACH | 3 | $747.55 | Jun 12, 2026 |
| A2017816 | T-TILIA AMER MCK 2 | EACH | 3 | $412.13 | Apr 24, 2026 |
| A2C015G3 | T-BETULA NIGRA CG 3G | EACH | 3 | $215.45 | Jun 12, 2026 |
| A2C021G3 | T-CARYA LACINIO CG 3G | EACH | 3 | $158.34 | Nov 8, 2024 |
| A2C025G5 | T-CERCIS CANAD CG 5G | EACH | 3 | $207.12 | Jun 12, 2026 |
| A2C050G3 | T-QUERC BICOL CG 3G | EACH | 3 | $206.45 | Jun 16, 2023 |
| A2C060G3 | T-QUERC PALUS CG 3G | EACH | 3 | $205.97 | Jun 16, 2023 |
| A2C19G06 | T-CRAPE MYRTL SP 3 CG | EACH | 3 | $985.61 | Jan 17, 2025 |
| A3005238 | T-ZELKOVA SER GV 2 | EACH | 3 | $923.18 | Jan 17, 2025 |
| AR101510 | AIRPORT ROTATING BEACON | EACH | 3 | $13,402.67 | Aug 5, 2022 |
| AR108084 | 1/C #4 XLP-USE | L.F. | 3 | $4.37 | Jun 17, 2022 |
| AR109110 | ERECT PREFABRICATED VAULT | L.S. | 3 | $215,126.20 | Aug 5, 2022 |
| AR109311 | 7.5 KW REGULATOR, STYLE 1 | EACH | 3 | $17,562.50 | Jun 17, 2022 |
| AR109321 | 10 KW REGULATOR, STYLE 1 | EACH | 3 | $14,153.37 | Aug 5, 2022 |
| AR109342 | 20 KW REGULATOR, STYLE 2 | EACH | 3 | $29,713.30 | Jun 17, 2022 |
| AR109400 | POWER DISTRIBUTION SYSTEM | L.S. | 3 | $91,427.96 | Aug 5, 2022 |
| AR109440 | TEMPORARY WIRING | L.S. | 3 | $6,976.67 | Jul 30, 2021 |
| AR110024 | 2-4" DIRECTIONAL BORE | L.F. | 3 | $61.63 | Sep 17, 2021 |
| AR110906 | REMOVE ELECTRICAL HANDHOLE | EACH | 3 | $1,461.25 | Jul 30, 2021 |
| AR125400 | REPLACE ISOLATION TRANSFORMER | EACH | 3 | $482.05 | Jan 21, 2022 |
| AR125470 | MODIFY EXISTING SIGN PANEL | EACH | 3 | $1,545.17 | Jan 15, 2021 |
| AR125512 | MIRL, INPAVEMENT | EACH | 3 | $4,837.04 | Jan 21, 2022 |
| AR125615 | PAPI (L-880 SYSTEM) | EACH | 3 | $50,661.51 | Mar 6, 2020 |
| AR125932 | REPLACE SIGN PANEL | EACH | 3 | $316.62 | Jan 15, 2021 |
| AR125943 | ADJUST INPAVEMENT LIGHT | EACH | 3 | $2,382.98 | Jan 15, 2021 |
| AR151420 | CLEARING TREES 0-2.5' BUTT. DIA. | EACH | 3 | $461.22 | Jan 21, 2022 |
| AR151430 | CLEARING TREES 2.5'-5' BUTT DIA. | EACH | 3 | $1,335.63 | Aug 5, 2022 |
| AR151455 | CLEARING AND GRUBBING | L.S. | 3 | $10,684.60 | Jul 30, 2021 |
| AR152442 | OFFSITE BORROW EXCAVATION | C.Y. | 3 | $22.05 | Jan 18, 2019 |
| AR156515 | STRAW WATTLE | L.F. | 3 | $14.16 | Jul 30, 2021 |
| AR162224 | CLASS E MANUAL SLIDE GATE-24' | EACH | 3 | $9,646.71 | Apr 23, 2021 |
| AR162230 | CLASS E MANUAL SLIDE GATE-30' | EACH | 3 | $15,110.73 | Jan 15, 2021 |
| AR162510 | CLASS E FENCE 10' | L.F. | 3 | $44.43 | Jan 15, 2021 |
| AR162530 | WALKWAY GATES, CLASS E (5') | EACH | 3 | $1,900.00 | Jul 30, 2021 |
| AR162604 | CLASS E GATE-4' | EACH | 3 | $1,149.23 | Jan 18, 2019 |
| AR162606 | CLASS E GATE-6' | EACH | 3 | $804.17 | Jan 15, 2021 |
| AR162620 | CLASS E GATE-20' | EACH | 3 | $6,293.33 | Jul 30, 2021 |
| AR208604 | 4" AGGREGATE BASE COURSE | SQ YD | 3 | $12.74 | Jun 17, 2022 |
| AR209607 | CRUSHED AGG. BASE COURSE - 7" | SQ YD | 3 | $9.94 | Aug 5, 2022 |
| AR501509 | 9" PCC PAVEMENT | S.Y. | 3 | $121.14 | Nov 6, 2020 |
| AR501910 | REMOVE & REPLACE PCC PAVEMENT | S.Y. | 3 | $358.27 | Jun 12, 2020 |
| AR510905 | REMOVE GROUND ROD | EACH | 3 | $260.02 | Mar 5, 2021 |
| AR608530 | FRICTION TESTING | L.S. | 3 | $6,666.67 | Apr 29, 2022 |
| AR620535 | PAVEMENT MARKING-THERMOPLASTIC | S.F. | 3 | $9.62 | Nov 6, 2020 |
| AR701006 | 6" PVC STORM SEWER | L.F. | 3 | $39.73 | Mar 11, 2022 |
| AR701012 | 12" PVC STORM SEWER | L.F. | 3 | $58.67 | Aug 2, 2019 |
| AR701521 | 21" RCP, CLASS IV | L.F. | 3 | $108.45 | Aug 3, 2018 |
| AR701530 | 30" RCP, CLASS IV | L.F. | 3 | $96.23 | Apr 23, 2021 |
| AR701713 | RCEP SPAN 30 RISE 19 | L.F. | 3 | $89.33 | Jan 15, 2021 |
| AR705903 | REMOVE UNDERDRAIN INSP. HOLE | EACH | 3 | $157.78 | Jul 31, 2020 |
| AR751952 | ADJUST UNDERDRAIN STRUCTURE | EACH | 3 | $3,716.61 | Jan 21, 2022 |
| AR751980 | RECONSTRUCT INLET | EACH | 3 | $1,909.17 | Nov 6, 2020 |
| AR752415 | PRECAST REINFORCED CONC. FES 15" | EACH | 3 | $1,128.33 | Apr 24, 2020 |
| AR752424 | PRECAST REINFORCED CONC. FES 24" | EACH | 3 | $1,332.59 | Apr 29, 2022 |
| AR752512 | GRATING FOR CONC. FES 12" | EACH | 3 | $510.06 | Nov 6, 2020 |
| AR752724 | P R CONC. FES EQ. ROUND SIZE 24" | EACH | 3 | $1,766.25 | Jan 15, 2021 |
| AR754904 | REMOVE COMB CURB & GUTTER | L.F. | 3 | $10.65 | Jan 18, 2019 |
| AR800009 | PCC SPALL REPAIR | S.F. | 3 | $60.87 | Nov 6, 2020 |
| AR800159 | SEEDING | S.Y. | 3 | $2.56 | Nov 6, 2020 |
| AR800469 | REMOVE BITUMINOUS & PCC PAVEMENT | SQ YD | 3 | $20.65 | Jan 21, 2022 |
| AR800545 | MITL-BASE MOUNTED SIZE D | EACH | 3 | $1,566.05 | Apr 29, 2022 |
| AR800564 | CABLE & CCR TESTING & CALIBRATION | L.S. | 3 | $3,410.77 | Apr 29, 2022 |
| AR901515 | SEEDING | SQ YD | 3 | $4.14 | Jun 17, 2022 |
| AS108108 | 1/C #8 5 KV UG CABLE | L.F. | 3 | $3.93 | Apr 23, 2021 |
| AS150520 | MOBILIZATION | L.S. | 3 | $5,100.00 | Aug 5, 2022 |
| AS152540 | SOIL STABILIZATION FABRIC | SQ YD | 3 | $3.22 | Aug 5, 2022 |
| AS156520 | INLET PROTECTION | EACH | 3 | $575.59 | Apr 23, 2021 |
| AS201670 | CRACK CONTROL FABRIC | S.Y. | 3 | $7.03 | Apr 23, 2021 |
| AS208515 | POROUS GRANULAR EMBANKMENT | CU YD | 3 | $48.86 | Aug 5, 2022 |
| AS208540 | OVERSIZE AGGREGATE | TON | 3 | $30.82 | Apr 23, 2021 |
| AS209510 | CRUSHED AGGREGATE BASE COURSE | TON | 3 | $34.38 | Apr 23, 2021 |
| AS209608 | CRUSHED AGGREGATE BASE COURSE - 8" | S.Y. | 3 | $29.87 | Jul 30, 2021 |
| AS501900 | REMOVE PCC PAVEMENT | S.Y. | 3 | $22.67 | Nov 6, 2020 |
| AS908515 | HEAVY-DUTY HYDRAULIC MULCH | ACRE | 3 | $4,920.67 | Jan 15, 2021 |
| AT152410 | UNCLASSIFIED EXCAVATION | C.Y. | 3 | $21.69 | Jan 15, 2021 |
| AT401613 | BIT. SURF. CSE.-METHOD I, SUPERPAVE | TON | 3 | $123.35 | Apr 23, 2021 |
| AU401610 | BITUMINOUS SURFACE COURSE | TON | 3 | $101.20 | Apr 23, 2021 |
| AU603510 | BITUMINOUS TACK COAT | GAL. | 3 | $2.70 | Apr 23, 2021 |
| B2000562 | T-AMELAN CAN SF 4' | EACH | 3 | $285.69 | Jan 19, 2024 |
| B2000664 | T-AMELAN X GF SF 5' | EACH | 3 | $465.72 | Jun 12, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.