| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| X0100020 | EARTH EXCAV UNS MAT | CU YD | 4 | $18.82 | Jun 17, 2022 |
| X0100027 | TEMP SOIL RET SYS TRP | SQ FT | 4 | $35.16 | Apr 28, 2023 |
| X0200004 | HES PCC PVT 11 JTD | SQ YD | 4 | $21.56 | Apr 24, 2020 |
| X0300002 | HMA SC IL-9.5FG N70 | TON | 4 | $222.09 | Jun 14, 2019 |
| X0301271 | REM EX UNDERDRAINS | FOOT | 4 | $1.95 | Jan 21, 2022 |
| X0301728 | CONC COLLAR SPECIAL | CU YD | 4 | $6,870.90 | Apr 28, 2023 |
| X0301847 | WATER TRANSPORT- ENGR | CAL MO | 4 | $522.35 | Nov 7, 2025 |
| X0320009 | DRAINAGE SYSTEM, N4 | EACH | 4 | $24,651.78 | Jan 21, 2022 |
| X0320031 | SIGN LIGHT UNIT COMPL | EACH | 4 | $1,815.42 | Jan 21, 2022 |
| X0320239 | CONC WALL REMOV | FOOT | 4 | $47.68 | Jul 30, 2021 |
| X0320581 | DRUMS | EACH | 4 | $11.14 | Sep 20, 2024 |
| X0320882 | GUTTERS TO BE CLEANED | FOOT | 4 | $7.84 | Apr 26, 2024 |
| X0322121 | SHEET WAT PRF MEM SYS | SQ YD | 4 | $48.68 | Nov 8, 2024 |
| X0322330 | HANDICAP SIGN | EACH | 4 | $228.33 | Apr 26, 2024 |
| X0322690 | POLE ST AB 10 3G 34-6 | EACH | 4 | $7,793.38 | Jan 16, 2026 |
| X0322692 | POLE ST AB 12.5 3G 34-6 | EACH | 4 | $13,175.53 | Jan 16, 2026 |
| X0324044 | EROS CON TEMP P SL DR | EACH | 4 | $2,997.02 | Apr 29, 2022 |
| X0324078 | CONFLICT MANHOLES | EACH | 4 | $11,050.00 | Mar 10, 2023 |
| X0324159 | WHITEWASH CONC PAVT | SQ YD | 4 | $0.1682 | Apr 24, 2026 |
| X0324487 | CONC FDN 30 AR 16.5 BC | FOOT | 4 | $712.85 | Jun 12, 2026 |
| X0324519 | CONC FDN30 AR 17.25 BC | FOOT | 4 | $736.50 | Jun 12, 2026 |
| X0324582 | PLUMB EQ, ACCESS & RS | L SUM | 4 | $84,368.50 | Apr 26, 2024 |
| X0324775 | SED CON STAB CON EN M | SQ YD | 4 | $6.34 | Jan 16, 2026 |
| X0324857 | AQU WC GLY | GALLON | 4 | $310.85 | Jan 18, 2019 |
| X0324858 | AQU WC IMAZ | GALLON | 4 | $684.59 | Jan 18, 2019 |
| X0324900 | SERV CON TO CECO LINE | EACH | 4 | $5,601.33 | Nov 7, 2025 |
| X0324911 | REPL DECAL W/NEW LM D | EACH | 4 | $187.15 | Nov 8, 2024 |
| X0324930 | DUCT IRON SLEEVE, 12" | EACH | 4 | $1,196.27 | Jan 20, 2023 |
| X0325034 | MH TA 6D W/2 T1FOL RP | EACH | 4 | $10,640.00 | Mar 10, 2023 |
| X0325087 | VIDEO TAPING MN DRAIN | FOOT | 4 | $19.63 | Apr 24, 2020 |
| X0325143 | FILL EXIST VAULT | EACH | 4 | $1,277.93 | Mar 11, 2022 |
| X0325170 | PLANT BED PREPARATION | SQ FT | 4 | $4.47 | Aug 4, 2023 |
| X0325346 | RAILROAD TRACK | TRK FT | 4 | $327.53 | Apr 24, 2026 |
| X0325410 | PILE REMOVAL | FOOT | 4 | $63.77 | Jun 17, 2022 |
| X0325462 | MEDIA CONVERTER | EACH | 4 | $190.33 | Jan 21, 2022 |
| X0325499 | REM TH EPXY B DK OLAY | SQ YD | 4 | $25.81 | Sep 18, 2026 |
| X0325522 | REINS EX STL GT ASSMB | EACH | 4 | $3,308.66 | Mar 8, 2024 |
| X0325592 | REM REPL STONE RIPRAP | CU YD | 4 | $80.02 | Apr 28, 2023 |
| X0325682 | PUMPABLE CONCRETE MIX | CU FT | 4 | $2,206.93 | Apr 23, 2021 |
| X0325790 | WATER HYDRANT | EACH | 4 | $2,456.43 | Apr 25, 2025 |
| X0326092 | REL CCT SURV CAMERA | EACH | 4 | $19,743.22 | Feb 27, 2026 |
| X0326274 | REAL-TIME TR CONT SYS | L SUM | 4 | $131,445.25 | Apr 26, 2024 |
| X0326310 | RELO EX SWITCH SPL | EACH | 4 | $446.00 | Mar 8, 2024 |
| X0326337 | DRAINAGE CONTROL STR | EACH | 4 | $14,550.00 | Jun 17, 2022 |
| X0326351 | CONC APRN FOR MED INL | EACH | 4 | $6,042.75 | Jun 11, 2021 |
| X0326366 | ELECT EQPT REM/SALV | EACH | 4 | $1,990.83 | Apr 24, 2026 |
| X0326382 | CONC BARRIER BASE SPL | FOOT | 4 | $61.85 | Apr 24, 2020 |
| X0326401 | BARRIER WALL REMOVAL | FOOT | 4 | $15.35 | Mar 11, 2022 |
| X0326414 | STAMP CLRD PCC MED 8 | SQ FT | 4 | $23.80 | Apr 25, 2025 |
| X0326465 | MOD EX VID DSTN SYS | L SUM | 4 | $12,397.25 | Jan 21, 2022 |
| X0326485 | DECORATIVE RAIL DK MT | FOOT | 4 | $237.72 | Nov 18, 2022 |
| X0326486 | DECORATIVE RAIL PR MT | FOOT | 4 | $363.07 | Nov 18, 2022 |
| X0326617 | PAINT LIGHT POLE UNIT | EACH | 4 | $431.26 | Jun 12, 2020 |
| X0326618 | ADDRES FIRE ALARM SYS | L SUM | 4 | $71,312.50 | Jul 31, 2026 |
| X0326656 | REL EX TS CONT/CAB CM | EACH | 4 | $5,483.33 | Apr 28, 2023 |
| X0326665 | CUR-IN-PL PIPE LNR 42 | FOOT | 4 | $384.88 | Jun 17, 2022 |
| X0326744 | PLUG PIPE PENETRATION | EACH | 4 | $702.04 | Jan 20, 2023 |
| X0326760 | REM EX LT CNTRLR SALV | EACH | 4 | $1,278.06 | Apr 24, 2020 |
| X0326836 | REM & RE VID CAM & EQ | EACH | 4 | $2,486.45 | Nov 7, 2025 |
| X0326964 | FO INTERCONNECT CAB | EACH | 4 | $41,030.95 | Jun 16, 2023 |
| X0326968 | JUN BOX POLE/POST MTD | EACH | 4 | $1,053.68 | Mar 10, 2023 |
| X0327024 | FIRE HYDNT REM & SALV | EACH | 4 | $1,671.99 | Jun 16, 2023 |
| X0327084 | AUX VLV BOX EXTENSION | FOOT | 4 | $204.51 | Sep 20, 2024 |
| X0327085 | CASING PIPE OC 20 PVC | FOOT | 4 | $138.64 | Apr 28, 2023 |
| X0327123 | CUR-IN-PL PIPE LNR 8 | FOOT | 4 | $76.32 | Jun 17, 2022 |
| X0327132 | DRAIN STRUCTURES N2 | EACH | 4 | $117,765.20 | Jan 21, 2022 |
| X0327139 | AGG COLUMN GRND IMPRV | L SUM | 4 | $125,625.00 | Apr 23, 2021 |
| X0327203 | CASING PIPE OC 24 STL | FOOT | 4 | $156.20 | Jun 12, 2020 |
| X0327271 | TRAF CONT RD CLOSURE | EACH | 4 | $1,337.50 | Nov 18, 2022 |
| X0327367 | STL CAS P BOR/JKD 24 | FOOT | 4 | $976.98 | Jan 19, 2024 |
| X0327466 | TRAF COUNTER POST GS | EACH | 4 | $3,800.61 | Jul 31, 2020 |
| X0327488 | TEMP BAR GATE SYS | EACH | 4 | $32,112.98 | Apr 26, 2024 |
| X0327543 | POLYURETHANE SEALANT | FOOT | 4 | $13.59 | Mar 7, 2025 |
| X0327650 | TEMP DRAINAGE SYS N1 | L SUM | 4 | $94,088.00 | Apr 24, 2020 |
| X0327651 | WAT MN IN CASING 12 | FOOT | 4 | $148.56 | Nov 8, 2024 |
| X0327996 | CIP RECYCLING 3.0 | SQ YD | 4 | $3.51 | Mar 8, 2024 |
| X0487700 | SAN SEW REMOV 10 | FOOT | 4 | $88.46 | Jan 20, 2023 |
| X0550300 | SLOPE WALL BREAKING | SQ YD | 4 | $11.06 | Jun 14, 2024 |
| X0696100 | PARKING BLOCKS | EACH | 4 | $132.85 | Jun 12, 2026 |
| X0839900 | SAN SEW REMOV 6 | FOOT | 4 | $35.23 | Jan 20, 2023 |
| X0900058 | PREF JOINT SEAL 2" | FOOT | 4 | $84.19 | Jun 14, 2019 |
| X0900065 | REPLACE JOINT FILLER | FOOT | 4 | $26.85 | Jan 20, 2023 |
| X0900070 | F LN SLNT WP SYS | SQ YD | 4 | $32.30 | Jun 11, 2021 |
| X1200042 | MAN TA 9D 2TY1F CL RP | EACH | 4 | $34,322.26 | Apr 24, 2026 |
| X1200048 | DRAINAGE STRUC LINING | FOOT | 4 | $416.41 | Mar 11, 2022 |
| X1200055 | INFILTRATION AGG | CU YD | 4 | $120.46 | Apr 25, 2025 |
| X1200058 | INL RSR STR (O B) | EACH | 4 | $3,517.59 | Apr 25, 2025 |
| X1200067 | SAN SEW REMOV 24 | FOOT | 4 | $52.72 | Apr 26, 2024 |
| X1200111 | PREC BOX CULV END SEC | EACH | 4 | $6,459.75 | Jun 14, 2024 |
| X1400014 | CIR BRKR ST LIGHT CNT | EACH | 4 | $442.20 | Mar 7, 2025 |
| X1400068 | 45' WS P (VALMONT) | EACH | 4 | $3,813.59 | Mar 10, 2023 |
| X1400069 | 53' WS P (VALMONT) | EACH | 4 | $4,792.29 | Mar 10, 2023 |
| X1400084 | PED PSH-BTN POST CHGO | EACH | 4 | $1,832.27 | Jan 16, 2026 |
| X1400155 | REMAL OF FOC | FOOT | 4 | $1.57 | Aug 2, 2024 |
| X1400160 | PUMP STA PKG ENGN SYS | L SUM | 4 | $117,562.50 | Nov 8, 2024 |
| X1400163 | AEGIS PANEL | L SUM | 4 | $12,199.00 | Nov 8, 2024 |
| X1400178 | RPL EXCCTVCAM LWG DVC | EACH | 4 | $13,411.14 | Apr 25, 2025 |
| X1400182 | FAC T SUPER R CAB | EACH | 4 | $36,191.61 | Sep 22, 2023 |
| X1400203 | LUM LED HM B | EACH | 4 | $598.13 | Sep 20, 2019 |
| X1400241 | FOC AER 96F SNGL MODE | FOOT | 4 | $8.13 | Jan 19, 2024 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.