| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| AR705645 | UNDERDRAIN CONNECTION | EACH | 5 | $1,177.16 | Apr 23, 2021 |
| AR751903 | REMOVE MANHOLE | EACH | 5 | $618.22 | Mar 11, 2022 |
| AR800178 | FIBER OPTIC CABLE | L.F. | 5 | $9.99 | Jun 17, 2022 |
| AR800192 | INSTALL ALCMS L-890 | L.S. | 5 | $128,118.11 | Jun 17, 2022 |
| AS108158 | 1/C #8 5 KV UG CABLE IN UD | L.F. | 5 | $15.80 | Jan 15, 2021 |
| AS125904 | REMOVE TAXI GUIDANCE SIGN | EACH | 5 | $580.60 | Jan 15, 2021 |
| AT603510 | BITUMINOUS TACK COAT | GAL. | 5 | $6.08 | Apr 23, 2021 |
| AT901510 | SEEDING | ACRE | 5 | $3,917.72 | Apr 23, 2021 |
| B2001167 | T-CERCIS CAN (E R) 8' | EACH | 5 | $494.83 | Jul 31, 2026 |
| B2001266 | T-CORNUS ALT CL 6' | EACH | 5 | $274.40 | Jan 16, 2026 |
| B2001420 | T-CORNUS MAS TF 2 | EACH | 5 | $493.50 | Sep 20, 2024 |
| B2004712 | T-MALUS ROY RRC 2 1/2 | EACH | 5 | $551.66 | Jan 16, 2026 |
| B2010120 | T-CLADRASTIS LUT 2.5 | EACH | 5 | $775.94 | Sep 18, 2026 |
| B2010165 | T-CORNUS KOUSA 5' | EACH | 5 | $443.59 | Jan 16, 2026 |
| C20023G5 | S-DIERVILLA LONI 5G | EACH | 5 | $78.60 | Sep 20, 2024 |
| C2002437 | S-DIER G2X8854 CG 3G | EACH | 5 | $65.86 | Aug 4, 2023 |
| C2003248 | S-HAMAMELIS VER 4' | EACH | 5 | $181.12 | Apr 26, 2024 |
| C2003372 | S-HAMAMELIS VIRG 6' | EACH | 5 | $415.66 | Aug 2, 2024 |
| C2005812 | S-RHUS AROMA GRO 2 BB | EACH | 5 | $59.65 | Jun 13, 2025 |
| C2011736 | S-VIBURN DENT 3' | EACH | 5 | $79.01 | Jun 12, 2026 |
| C2012772 | S-VIBURN PRUN 6' | EACH | 5 | $233.14 | Jan 16, 2026 |
| C2C01024 | S-BUXUS MICRO WG 2 | EACH | 5 | $94.06 | Jan 17, 2025 |
| C2C01424 | S-CORNUS AMOMUM 2'C | EACH | 5 | $60.14 | Jun 12, 2026 |
| C2C05718 | S-RHUS AROMA 18C | EACH | 5 | $47.84 | Jun 12, 2026 |
| C2C09636 | S-SAMBUCUS CANAD 3'C | EACH | 5 | $63.44 | Aug 1, 2025 |
| C2C10930 | S-SYRINGA M PAL 5-GAL | EACH | 5 | $70.93 | Apr 24, 2026 |
| D2000372 | E-JUNIPER CHIN MB 6' | EACH | 5 | $620.77 | Jun 12, 2026 |
| D2001788 | E-PICEA ABIES 8' | EACH | 5 | $723.70 | Jun 12, 2026 |
| D2001948 | E-PICEA GLAU DEN 4' | EACH | 5 | $412.12 | Sep 18, 2026 |
| D2002460 | E-PINUS FLX VWP 5' | EACH | 5 | $544.90 | Nov 7, 2025 |
| D2003760 | E-THUJA OCCID 5' | EACH | 5 | $310.64 | Jan 16, 2026 |
| D2003872 | E-THUJA OCC TEC 6' | EACH | 5 | $416.17 | Apr 24, 2026 |
| K0012974 | P PL ORN T 3" POT | UNIT | 5 | $930.00 | Apr 28, 2023 |
| K0012980 | P PL ORNAMENT T QRT P | UNIT | 5 | $1,087.06 | Sep 19, 2025 |
| K0012995 | P PL ORNAMENT T 5G P | UNIT | 5 | $4,243.29 | Jan 16, 2026 |
| K0026852 | PRAIRIE WEED CONTROL | ACRE | 5 | $931.18 | Jun 12, 2026 |
| K1005428 | SEEDING SEDGE MDW MIX | ACRE | 5 | $6,024.65 | Jun 12, 2026 |
| LR400903 | FD RECLAMATION 12.0 | SQ YD | 5 | $4.55 | Jun 12, 2026 |
| LR420029 | PCC PVMT 8 SPL | SQ YD | 5 | $78.29 | Apr 26, 2024 |
| X0100025 | FLOWABLE FILL | CU YD | 5 | $153.46 | Aug 4, 2023 |
| X0300015 | CONC WINGWALL REMOV | EACH | 5 | $1,903.25 | Jun 16, 2023 |
| X0300031 | UT BON W CRS IL 9.5 UTB MIX D | SQ YD | 5 | $9.04 | Feb 27, 2026 |
| X0300037 | AREA REF CR CON TREAT | SQ YD | 5 | $3.00 | Jun 14, 2024 |
| X0320002 | DRAINAGE SYSTEM, N2 | EACH | 5 | $21,591.66 | Jan 21, 2022 |
| X0320013 | REPR IMP ATTN FRW TL3 | EACH | 5 | $10,225.20 | Mar 11, 2022 |
| X0320034 | HEATING AND VENTILTN | L SUM | 5 | $306,958.73 | Aug 1, 2025 |
| X0320035 | LOW FLOW PUMP | EACH | 5 | $106,905.67 | Nov 8, 2024 |
| X0320057 | REP IMP ATT (F R) | EACH | 5 | $6,703.17 | Jun 17, 2022 |
| X0320060 | GATEWAY MON SIGN COMP | EACH | 5 | $67,291.72 | Mar 11, 2022 |
| X0320090 | PARK BENCH REM & REL | EACH | 5 | $958.33 | Jun 12, 2026 |
| X0320990 | D1 ELECT MAINT | L SUM | 5 | $23,120,903.55 | Sep 20, 2024 |
| X0321461 | PILLAR REM | EACH | 5 | $803.51 | Apr 25, 2025 |
| X0321778 | SEISMIC RESTRAINER | EACH | 5 | $1,652.59 | Apr 24, 2026 |
| X0321963 | MICRO-PILES | EACH | 5 | $12,172.13 | Sep 17, 2021 |
| X0322247 | MAIN EX TRAFFIC SURV | L SUM | 5 | $24,256.52 | Jan 21, 2022 |
| X0322329 | TIMBER CURB REMOVAL | FOOT | 5 | $5.24 | Mar 7, 2025 |
| X0322400 | PILE EXTRACTION | EACH | 5 | $1,780.77 | Jan 21, 2022 |
| X0322442 | TONE EQ 3 FRE REC PRG | EACH | 5 | $1,966.19 | Jun 12, 2020 |
| X0322443 | TONE EQ 3 FREQ TR PRG | EACH | 5 | $1,382.80 | Jun 12, 2020 |
| X0322494 | CURB CUT | FOOT | 5 | $22.53 | Nov 18, 2022 |
| X0322691 | POLE ST AB 11 3G 34-6 | EACH | 5 | $8,807.48 | Jan 16, 2026 |
| X0322719 | TEMP DRAINAGE CONNECT | EACH | 5 | $2,836.05 | Mar 11, 2022 |
| X0322920 | COMM CABINET & EQUIP | EACH | 5 | $63,782.35 | Apr 25, 2025 |
| X0323078 | REM & RE-E EX BR RAIL | FOOT | 5 | $79.34 | Jan 21, 2022 |
| X0323432 | MICROPILE LOAD TEST | EACH | 5 | $36,910.50 | Sep 17, 2021 |
| X0323433 | MIC-PIL PRF LOAD TEST | EACH | 5 | $8,214.09 | Sep 17, 2021 |
| X0323577 | SAN SEW TV INSP VT RC | FOOT | 5 | $13.50 | Jun 12, 2026 |
| X0323661 | DROP BOX NO.2 | EACH | 5 | $27,918.00 | Nov 18, 2022 |
| X0323880 | COMP SPARE M-PUMP ASM | L SUM | 5 | $147,230.26 | Nov 8, 2024 |
| X0323904 | IDOT COMM CENTER NODE | L SUM | 5 | $254,922.70 | Feb 27, 2026 |
| X0324045 | SED CON STAB CON EN R | EACH | 5 | $676.02 | Jan 16, 2026 |
| X0324248 | DETECTOR RACK | EACH | 5 | $1,978.17 | Jun 12, 2026 |
| X0324256 | FIB OPTIC C SPLICE | EACH | 5 | $4,402.13 | Jul 15, 2022 |
| X0324478 | PVC CON T 3 (S40) | FOOT | 5 | $26.07 | Jan 16, 2026 |
| X0324517 | EL MH 3X4X4 24FL | EACH | 5 | $11,491.71 | Jun 12, 2026 |
| X0324534 | REM & REIN LT POLES | L SUM | 5 | $13,739.38 | Jan 20, 2023 |
| X0324761 | DRAINAGE SYSTEM SPL | L SUM | 5 | $52,160.48 | Nov 6, 2020 |
| X0324966 | CONC HEALER SEALER | SQ YD | 5 | $21.04 | Feb 27, 2026 |
| X0325077 | FIB OPT UTILIT MARKER | EACH | 5 | $160.25 | Aug 5, 2022 |
| X0325155 | REM ABANDON GAS MAIN | FOOT | 5 | $20.64 | Apr 25, 2025 |
| X0325531 | PVC CON T 2 (S40) | FOOT | 5 | $22.06 | Jul 31, 2026 |
| X0325903 | REP CABLE RD GUARD 3S | FOOT | 5 | $44.97 | Mar 11, 2022 |
| X0325942 | CONCRETE LAND SLAB | SQ FT | 5 | $6.42 | Nov 7, 2025 |
| X0325970 | SOIL CONDITION 3 | SQ YD | 5 | $9.35 | Jan 20, 2023 |
| X0325972 | CABLE GUARD POST | EACH | 5 | $277.28 | Jun 17, 2022 |
| X0326129 | ULTRA THIN HMA SC | SQ YD | 5 | $6.42 | Apr 26, 2019 |
| X0326225 | PAINT NEW PED P-B PST | EACH | 5 | $202.92 | Nov 18, 2022 |
| X0326309 | RELO R-C VIDEO SYS SP | EACH | 5 | $1,480.53 | Nov 8, 2024 |
| X0326344 | GROUT SLURRY SPECIAL | CU YD | 5 | $421.35 | Jan 19, 2024 |
| X0326390 | CONCRETE SLAB REMOVAL | SQ YD | 5 | $19.47 | Nov 18, 2022 |
| X0326466 | HT CABLE POST REPAIR | EACH | 5 | $77.54 | Jun 17, 2022 |
| X0326557 | REFURB OPER MACHINERY | L SUM | 5 | $1,726,432.10 | Jun 12, 2026 |
| X0326672 | PEDSTRN BR LIGHT SYS | L SUM | 5 | $256,726.09 | Apr 24, 2026 |
| X0326763 | REMOVE GRATING | EACH | 5 | $565.94 | Jun 17, 2022 |
| X0326802 | UTILITY STRUC REMOVAL | EACH | 5 | $1,496.83 | Feb 27, 2026 |
| X0326887 | WOOD POLE 25 CL 4 | EACH | 5 | $1,600.16 | Jun 12, 2020 |
| X0326889 | PAVT REPLACEMENT HMA | CU YD | 5 | $348.00 | Jun 17, 2022 |
| X0326911 | TRANSVERSE DRAINS COM | EACH | 5 | $3,632.53 | Jul 31, 2026 |
| X0326981 | ENGNEERD SOIL F P SPL | CU YD | 5 | $74.63 | Jan 21, 2022 |
| X0327094 | VALVE BOX 6" | EACH | 5 | $442.66 | Sep 20, 2024 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.