| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| X2111000 | TOPSOIL EXCAVATION | CU YD | 9 | $25.77 | Jan 16, 2026 |
| X2111100 | TOPSOIL EXC & PLAC SP | CU YD | 9 | $11.69 | Aug 1, 2025 |
| X2300019 | REAT/RLGN TRM/RL PLTS | EACH | 9 | $859.43 | Sep 18, 2026 |
| X2503318 | INTERSEED CL 4B MOD | ACRE | 9 | $2,260.08 | Nov 8, 2024 |
| X2503323 | INTERSEED CL 5A MOD | ACRE | 9 | $4,488.53 | Jun 12, 2026 |
| X2700005 | PREF PL PM TB IL LN 7 | FOOT | 9 | $5.48 | Nov 5, 2021 |
| X2810212 | STONE RIPRAP CL A6 SP | TON | 9 | $85.05 | Jan 16, 2026 |
| X2810228 | STONE RIPRAP CL B4 SP | TON | 9 | $129.04 | Jun 12, 2026 |
| X3000001 | RRPM PROTECTION | EACH | 9 | $22.14 | Apr 24, 2026 |
| X4020900 | AGG SURF CSE B SPL | SQ YD | 9 | $6.17 | Jan 16, 2026 |
| X4060006 | P HMA SC SMA 12.5 N80 | TON | 9 | $113.01 | Jan 17, 2020 |
| X4080052 | INCIDENTL HMA SURF SP | TON | 9 | $244.28 | Apr 25, 2025 |
| X4400060 | BRICK SIDEWALK REM | SQ FT | 9 | $3.28 | Apr 24, 2026 |
| X4406630 | PART DEP REM T4 3 | SQ YD | 9 | $40.32 | Dec 13, 2024 |
| X4406812 | PCC SURF REM 1 1/2 | SQ YD | 9 | $17.86 | Jul 31, 2026 |
| X4420549 | CL A PATCH T4 9 SPL | SQ YD | 9 | $211.41 | Apr 25, 2025 |
| X4420587 | CL A PATCH T4 13 SPL | SQ YD | 9 | $194.90 | Apr 24, 2026 |
| X4420624 | CL A PATCH T3 14 SPL | SQ YD | 9 | $277.52 | Apr 24, 2026 |
| X4420630 | CL A PATCH T2 15 SPL | SQ YD | 9 | $272.75 | Feb 27, 2026 |
| X4420684 | CL B PATCH T4 10 SPL | SQ YD | 9 | $127.65 | Apr 24, 2026 |
| X4421825 | CL D PTCH T1 9 SPL | SQ YD | 9 | $171.60 | Apr 26, 2024 |
| X4510050 | HFST CRACK FILLING | FOOT | 9 | $5.10 | Apr 25, 2025 |
| X4811300 | AGGREGATE SHLDS B SPL | TON | 9 | $31.37 | Apr 24, 2026 |
| X5020100 | AGG COLUMN GRND IMPRV | L SUM | 9 | $1,529,249.68 | Jul 31, 2026 |
| X5510310 | SAN SEW REMOV 10 | FOOT | 9 | $43.84 | Apr 24, 2026 |
| X5610660 | WATER MAIN ABANDON 10 | FOOT | 9 | $12.21 | Feb 27, 2026 |
| X5620040 | WAT SER CONN 2 | EACH | 9 | $5,166.71 | Jun 12, 2026 |
| X5620128 | ADJ WATER SERV LINES | EACH | 9 | $849.24 | Mar 7, 2025 |
| X5630716 | CONN TO EX W MAIN 16 | EACH | 9 | $9,642.57 | Jun 12, 2026 |
| X5800110 | MEMBRANE WATERPRF SPL | SQ FT | 9 | $18.69 | Sep 19, 2025 |
| X6010302 | TRENCH DRAIN | FOOT | 9 | $316.83 | Jan 16, 2026 |
| X6022055 | MAN TA 6 DIA T11VF&G | EACH | 9 | $7,909.21 | Feb 27, 2026 |
| X6022312 | DROP SAN MAN T1F CL | EACH | 9 | $26,290.85 | Jun 12, 2026 |
| X6022402 | MAN TA 4D T1F CL SPL | EACH | 9 | $3,380.61 | Jun 17, 2022 |
| X6060045 | COMB CC&G TBV.12 (CDOT) | FOOT | 9 | $48.56 | Jun 12, 2026 |
| X6061310 | CONC MEDIAN SURF 4 SP | SQ FT | 9 | $7.86 | Sep 19, 2025 |
| X6300224 | RETURN END SECTION | EACH | 9 | $200.30 | Sep 18, 2026 |
| X6300620 | THRIE-BM MOD BLOCK | EACH | 9 | $56.42 | Sep 18, 2026 |
| X6300630 | THRIE-BEAM POST | EACH | 9 | $203.14 | Sep 18, 2026 |
| X6300640 | THRIE-BM RADI ELE PLT | EACH | 9 | $302.40 | Sep 18, 2026 |
| X6310163 | TRAF BAR TERM T1 NOSE | EACH | 9 | $374.68 | Sep 18, 2026 |
| X6310177 | TRAF BAR TERM T3 SPL | EACH | 9 | $1,483.21 | Sep 18, 2026 |
| X6310203 | TBT T3 SPL NOSE | EACH | 9 | $358.04 | Sep 18, 2026 |
| X6310301 | REP TRAF B TERM T1 SP | EACH | 9 | $2,138.69 | Sep 18, 2026 |
| X6310310 | REP TB TERM T1 SP RLP | EACH | 9 | $111.32 | Sep 18, 2026 |
| X6380200 | REL MOD GLAR SCRN SYS | FOOT | 9 | $3.58 | Jan 16, 2026 |
| X6440116 | REM HTC MED BAR TERM | EACH | 9 | $2,645.12 | Jun 12, 2026 |
| X6440133 | REP POSTS (GIBRALTAR) | EACH | 9 | $309.75 | Sep 18, 2026 |
| X6640312 | CH LK GATES REM & RE | EACH | 9 | $1,365.03 | Apr 25, 2025 |
| X6640550 | CH LK FENCE 4 SPL | FOOT | 9 | $42.30 | Sep 19, 2025 |
| X6640618 | ORNAMENTAL FENCE | FOOT | 9 | $131.78 | Jan 16, 2026 |
| X7010814 | TRAF CONT-PROT TC14 | EACH | 9 | $472.19 | Sep 18, 2026 |
| X7035105 | TEMP EPOXY PVT MK L5 | FOOT | 9 | $0.6735 | Nov 17, 2023 |
| X7035112 | TEMP EPOXY PVT MK L12 | FOOT | 9 | $2.42 | Nov 17, 2023 |
| X7200052 | RM STOR & RE-E SN PAN | SQ FT | 9 | $23.27 | Jan 16, 2026 |
| X7200065 | SIGN PANEL BACKPLATE | SQ FT | 9 | $45.77 | Jan 17, 2025 |
| X7200080 | RE-ERECT SIGN PANEL | SQ FT | 9 | $8.99 | Jan 17, 2025 |
| X7200350 | INST SN PAN T3 - XWY | SQ FT | 9 | $20.26 | Nov 7, 2025 |
| X7230203 | INSTALL SIGN PANEL T3 | SQ FT | 9 | $19.65 | Nov 7, 2025 |
| X7270020 | FUR HINGE PLATE SET | EACH | 9 | $160.84 | Apr 25, 2025 |
| X7301035 | SIGN POST S-218 | FOOT | 9 | $78.31 | Jan 17, 2025 |
| X7330066 | REP HDRL LOC PIN CON | EACH | 9 | $217.06 | Jan 16, 2026 |
| X7330082 | MTNG BRCKT TY B | EACH | 9 | $1,252.55 | Jan 17, 2025 |
| X7800956 | PREF PL PM TB I C LN 7 | FOOT | 9 | $4.91 | Nov 5, 2021 |
| X8030106 | LOC UNDERGR UTILITIES | FOOT | 9 | $22.46 | Jul 31, 2026 |
| X8050095 | SERV INSTALL SPL | EACH | 9 | $3,012.40 | Aug 2, 2024 |
| X8050204 | REMOVE ELEC SERVICE | EACH | 9 | $1,884.39 | Jul 31, 2026 |
| X8130130 | JUNCTION BOX ADJUST | EACH | 9 | $3,083.77 | Jul 31, 2026 |
| X8212032 | LUMINAIRE, TYPE B SPL | EACH | 9 | $4,508.07 | Apr 24, 2026 |
| X8510204 | PAINT NEW PED P-B PST | EACH | 9 | $153.31 | Sep 18, 2026 |
| X8770139 | S C MAA&P 44 SPL | EACH | 9 | $41,646.39 | Jun 13, 2025 |
| X8780200 | CONC FDN SUR CAB 334 | EACH | 9 | $9,633.34 | Jun 12, 2026 |
| X8820014 | TS BKPLT LVRD FPL SPL | EACH | 9 | $528.99 | Sep 18, 2026 |
| X8870510 | CONFIRMATION BEACON | EACH | 9 | $571.33 | Jan 16, 2026 |
| X8891104 | REMOTE CONTR VIDEO SYS | EACH | 9 | $7,381.37 | Jul 31, 2026 |
| X8891301 | VID & RAD HYB DET SYS | EACH | 9 | $44,178.68 | Jun 12, 2026 |
| X8950077 | REM REL EXIST LT CONT | EACH | 9 | $4,622.78 | Jan 16, 2026 |
| X8950100 | RELOC EX MASTER CONTR | EACH | 9 | $2,015.75 | Apr 26, 2024 |
| XP000014 | TRUCK CRANE | HOUR | 9 | $2.95 | Jun 12, 2026 |
| XP000204 | AL LP 45 COMP RWTA TB | EACH | 9 | $2,287.52 | Jun 12, 2026 |
| XX000300 | CONCRETE STEPS | SQ FT | 9 | $86.23 | Jun 12, 2026 |
| XX005431 | LOC UNDERGR UTILITY | EACH | 9 | $677.93 | Feb 27, 2026 |
| XX006199 | STEEL BR RAIL SM SPL | FOOT | 9 | $165.37 | Sep 17, 2021 |
| XX007324 | RECYCLING RECEPTACLE | EACH | 9 | $1,895.39 | Jun 13, 2025 |
| XX008839 | WATER MAIN ABANDONED | L SUM | 9 | $10,791.48 | Sep 19, 2025 |
| XX009297 | LUM LED HM SPL | EACH | 9 | $799.00 | Mar 8, 2024 |
| Z0007120 | WELD WIRE FAB 6X6 | SQ YD | 9 | $8.96 | Apr 24, 2026 |
| Z0007400 | BR SIDEWLK REP (PD) | SQ FT | 9 | $70.40 | Jun 14, 2024 |
| Z0007612 | BLDG REMOV NO 12 | L SUM | 9 | $23,622.77 | Jun 12, 2026 |
| Z0010512 | CLEAN & PT STL BR N12 | L SUM | 9 | $132,451.67 | Apr 24, 2026 |
| Z0012140 | BR DECK SCAR 2 | SQ YD | 9 | $54.40 | Jun 13, 2025 |
| Z0012148 | BR DECK SCAR 3 | SQ YD | 9 | $57.52 | Mar 7, 2025 |
| Z0018010 | DRAINAGE SCUPPR DS-33 | EACH | 9 | $2,955.47 | Jun 14, 2024 |
| Z0029662 | REPL HT CBL POST FDN | EACH | 9 | $242.20 | Jun 12, 2026 |
| Z0030902 | TIGHTEN FUSE & BSE PL | EACH | 9 | $54.66 | Apr 25, 2025 |
| Z0032400 | JOINT REPAIR | EACH | 9 | $640.83 | Jun 12, 2026 |
| Z0033200 | LINE POST T1 | EACH | 9 | $278.10 | Feb 27, 2026 |
| Z0034212 | MECH ST EARTH R WL SP | SQ FT | 9 | $55.47 | Apr 26, 2024 |
| Z0034396 | MODULAR EXPAN JT 12 | FOOT | 9 | $4,024.60 | Feb 27, 2026 |
| Z0038119 | PCC SUR REM 1 1/2 | SQ YD | 9 | $7.69 | Jul 15, 2022 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.