18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Oct 14, 2026 | 6503-16-001RMC - A00222230 | Denton Dallas |
Repair/Replace Conc Barrier Denton FY 27IH0035E · Routine Maintenance Project - Sealed | $191,275 | $166,500 | GARRET SHIELDS INFRASTRUCTURE | -13.0% | 3 |
| Oct 14, 2026 | 6501-52-001RMC - A00221497 | Ellis Dallas |
Tree Trimming and Brush Removal 09 10/26IH0035E · Routine Maintenance Project - Sealed | $172,975 | $160,931 | GV LANDSCAPE AND CONSTRUCTION LLC | -7.0% | 8 |
| Oct 14, 2026 | 6506-43-001MMC - A00223365 | Denton Dallas |
04 Winter Weather Material - Brine 11/26US0380 · Material Maintenance Project | $109,500 | $130,000 | TOUCHSTONE RESOURCES, LLC | +18.7% | 2 |
| Oct 14, 2026 | 6505-19-001MMC - A00223022 | Ellis Dallas |
Rock/Riprap Materials 09 1026FM0876 · Material Maintenance Project | $95,000 | $105,000 | TOUCHSTONE RESOURCES, LLC | +10.5% | 5 |
| Oct 14, 2026 | 6504-00-001RMC - A00222546 | Trinity Lufkin |
2026-10 Trinity MBGFUS0287 · Routine Maintenance Project | $241,625 | $101,858 | ACE CONTRACTORS, INC. | -57.8% | 3 |
| Oct 14, 2026 | 6508-71-001MMC - A00223874 | Palo Pinto Fort Worth |
FY '27 Palo Pinto MMC Flexible BaseIH0020 · Material Maintenance Project | $156,750 | $101,350 | GREEN DREAM INTERNATIONAL LLC | -35.3% | 4 |
| Oct 14, 2026 | 6485-46-001BPM - A00215965 | Denton Dallas |
BPM Denton Underseal FY 27FM1385 · Bridge Preventative Maintenance | $78,310 | $83,076 | GARRET SHIELDS INFRASTRUCTURE | +6.1% | 6 |
| Oct 14, 2026 | 6507-60-001MMC - A00223617 | Brewster El Paso |
AAO Modified 5 AggregateFM0170 · Material Maintenance Project | $101,000 | $82,235 | GREEN DREAM INTERNATIONAL LLC | -18.6% | 3 |
| Oct 14, 2026 | 6506-42-001MMC - A00223364 | Denton Dallas |
04 Winter Weather Material - Road 11/26US0380 · Material Maintenance Project | $70,800 | $77,800 | NSG LOGISTICS, LLC | +9.9% | 1 |
| Oct 14, 2026 | 6508-61-001SUP - A00223852 | Victoria Yoakum |
US 59 Rubber FY 27US0059 · State Use Project | $613,279 | — | 0 | ||
| Oct 14, 2026 | 6511-18-001SUP - A00224427 | Cass Atlanta |
Picnic Area Maintenance NorthUS0059 · State Use Project | $52,960 | — | 0 | ||
| Oct 14, 2026 | 6511-19-001SUP - A00224428 | Titus Atlanta |
Grounds - Mt. Pleasant FY 27US0271 · State Use Project | $5,700 | — | 0 | ||
| Oct 14, 2026 | 6511-99-001SUP - A00224605 | Jefferson Beaumont |
BEAUMONT AO/MO JANITORIALUS0069 · State Use Project | $46,249 | — | 0 | ||
| Oct 14, 2026 | 6512-11-001SUP - A00224632 | Orange Beaumont |
ORANGE JANITORIAL MAINT. FY27SH0062 · State Use Project | $13,719 | — | 0 | ||
| Oct 14, 2026 | 6512-12-001SUP - A00224633 | Jefferson Beaumont |
PORT ARTHUR JANITORIAL MAINTENANCE FY27SH0347 · State Use Project | $11,404 | — | 0 | ||
| Oct 13, 2026 | 6508-38-001RMC - A00223813 | Smith Tyler |
Traffic Control Services - Smith CountyUS0069 · Routine Maintenance Project - Sealed | $940,700 | $1,076,000 | FLEX SUPPLY, LLC | +14.4% | 3 |
| Oct 13, 2026 | 6508-42-001RMC - A00223818 | Cherokee Tyler |
Traffic Control Services-Cherokee CountyUS0069 · Routine Maintenance Project - Sealed | $866,500 | $1,038,750 | FLEX SUPPLY, LLC | +19.9% | 3 |
| Oct 13, 2026 | 6508-18-001RMC - A00223740 | Harris Houston |
FY 26, Sign Maint & Rpr, N HarrisSH0249 · Routine Maintenance Project - Sealed | $680,457 | $699,987 | RHINO EQUITY, LLC | +2.9% | 2 |
| Oct 13, 2026 | 6510-75-001BPM - A00224304 | Ector Odessa |
6510-75-001 Bridge Repair CalloutIH0020 · Bridge Preventative Maintenance - Sealed | $969,250 | $608,725 | REAR CONTRACTORS LLC | -37.2% | 5 |
| Oct 13, 2026 | 6505-28-001RMC - A00223040 | Anderson Tyler |
FY27 Culvert Repair - Anderson CoSH0294 · Routine Maintenance Project - Sealed | $526,902 | $505,217 | ICOS MANAGEMENT, LLC | -4.1% | 7 |
| Oct 13, 2026 | 6504-92-001MMC - A00222938 | Montgomery Houston |
Winter Weather Material MMC 6504-92-001IH0045 · Material Maintenance Project - Sealed | $354,906 | $396,900 | TOUCHSTONE RESOURCES, LLC | +11.8% | 1 |
| Oct 13, 2026 | 6508-74-001RMC - A00223881 | Waller Houston |
RMC 6508-74-001US0290 · Routine Maintenance Project - Sealed | $532,540 | $384,715 | ABOVE ALL CONTRACTING LLC | -27.8% | 3 |
| Oct 13, 2026 | 6508-78-001MMC - A00223891 | Washington Bryan |
FY27 - Brenham AO LRA - 10SH0036 · Material Maintenance Project | $284,900 | $312,536 | VULCAN CONSTRUCTION MATERIALS, LLC | +9.7% | 2 |
| Oct 13, 2026 | 6509-64-001MMC - A00224044 | Ector Odessa |
6509-64-001 ASPPMIH0020 · Material Maintenance Project | $168,000 | $159,798 | VULCAN CONSTRUCTION MATERIALS, LLC | -4.9% | 2 |
| Oct 13, 2026 | 6504-90-001MMC - A00222935 | Montgomery Houston |
Aggregate MMC 6504-90-001IH0069 · Material Maintenance Project - Sealed | $96,200 | $105,224 | DIGG COMMERCIAL, LLC | +9.4% | 3 |
| Oct 13, 2026 | 6504-93-001MMC - A00222958 | Montgomery Houston |
Patching Materials MMC 6504-93-001IH0069 · Material Maintenance Project - Sealed | $95,700 | $94,602 | WALLER COUNTY ASPHALT INC. | -1.1% | 1 |
| Oct 13, 2026 | 6507-81-001MMC - A00223657 | Brazos Bryan |
FY27 - Bryan AO Cutback - 10SH0006 · Material Maintenance Project | $88,800 | $91,360 | MARTIN RESOURCE MANAGEMENT CORPORATION | +2.9% | 3 |
| Oct 13, 2026 | 6512-00-001SUP - A00224606 | Jefferson Beaumont |
BEAUMONT DISTRICT HQ GROUNDS FY27US0069 · State Use Project | $97,132 | — | 0 | ||
| Oct 13, 2026 | 6512-01-001SUP - A00224607 | Jefferson Beaumont |
DMV GROUNDS MAINT. FY27US0069 · State Use Project | $7,870 | — | 0 | ||
| Oct 13, 2026 | 6512-02-001SUP - A00224608 | Jasper Beaumont |
JASPER PICNIC MAINTENANCE FY27US0190 · State Use Project | $24,592 | — | 0 | ||
| Oct 13, 2026 | 6512-08-001SUP - A00224621 | Jefferson Beaumont |
LANSCAPING AREASUS0069 · State Use Project | $262,928 | — | 0 | ||
| Oct 13, 2026 | 6512-09-001SUP - A00224628 | Newton Beaumont |
NEWTON PICNIC MAINTENANCE FY27US0190 · State Use Project | $31,182 | — | 0 | ||
| Oct 13, 2026 | 6512-10-001SUP - A00224631 | Orange Beaumont |
ORANGE GROUNDS MAINT. FY27SH0062 · State Use Project | $44,625 | — | 0 | ||
| Oct 9, 2026 | 6512-07-001SUP - A00224620 | Aransas Corpus Christi |
6512-07-001 Aransas JanitorialFM3036 · State Use Project | $42,305 | — | 0 | ||
| Oct 9, 2026 | 6512-14-001SUP - A00224637 | Bee Corpus Christi |
6512-14-001 Bee JanitorialUS0181 · State Use Project | $36,354 | — | 0 | ||
| Oct 8, 2026 | 6508-46-001RMC - A00223830 | Childress Childress |
FY2027 Districtwide Crack SealUS0287 · Routine Maintenance Project - Sealed | $957,200 | $792,701 | CRACKSEAL OF TEXAS, LLC | -17.2% | 3 |
| Oct 8, 2026 | 6506-34-001MMC - A00223239 | Duval Laredo |
Emulsion - Duval CountySH0044 · Material Maintenance Project - Sealed | $577,160 | $534,600 | ERGON ASPHALT & EMULSIONS, INC. | -7.4% | 1 |
| Oct 8, 2026 | 6508-34-001RMC - A00223806 | Trinity Lufkin |
Trinity Ditch and Culvert CleaningUS0287 · Routine Maintenance Project | $372,650 | $363,601 | TEXAS DRAINAGE INC. | -2.4% | 2 |
| Oct 8, 2026 | 6509-34-001RMC - A00223995 | Colorado Yoakum |
Tree Trimming and Brush Removal FY 27IH0010 · Routine Maintenance Project | $326,000 | $299,875 | ROW Contractors LLC | -8.0% | 6 |
| Oct 8, 2026 | 6506-29-001RMC - A00223224 | Angelina Lufkin |
FY 2027 Traffic Signal MaintenanceUS0059 · Routine Maintenance Project - Sealed | $282,380 | $269,625 | SELECT MAINTENANCE, L.L.C. | -4.5% | 3 |
| Oct 7, 2026 | 0143-03-049C 143-3-49 | Wilson San Antonio |
US 87: 0143-03-049; WNFUS 87 · Widen Non-Freeway | $50,415,711 | $39,881,467 | HUNTER INDUSTRIES, LTD. | -20.9% | 8 |
| Oct 7, 2026 | 0200-01-093F 2B26(094) | Angelina Lufkin |
US 69_N of FM 841 to W of FM 1475-IOIUS 69 · Intersection & Operational Imprv | $35,140,814 | $31,796,270 | LONGVIEW BRIDGE AND ROAD, LTD. | -9.5% | 7 |
| Oct 7, 2026 | 0092-02-145F 2B26(102) | Dallas Dallas |
IH 45 Innovative Corridor DAL 1IH 45 · Freeway Operational Improvements | $33,244,749 | $29,876,158 | SICE, INC. | -10.1% | 6 |
| Oct 7, 2026 | 0049-14-015F 2B26(076) | Robertson Bryan |
FM 46 F: Falls C/L T: SH 14 - SC FY 27FM 46 · Seal Coat | $18,203,777 | $19,126,405 | CLARK CONSTRUCTION OF TEXAS, INC. | +5.1% | 4 |
| Oct 7, 2026 | 0092-05-058F 2B26(097) | Ellis Dallas |
IH 45 FR from NAVARRO CL to SH 34IH 45 · Seal Coat | $18,377,218 | $13,621,550 | CLARK CONSTRUCTION OF TEXAS, INC. | -25.9% | 1 |
| Oct 7, 2026 | 0014-23-041F 2B26(066) | Hill Waco |
RER | IH 35W | IH 35E | Johnson CL SBIH 35W · Rehabilitation of Existing Road | $12,088,989 | $10,903,496 | NORTHEASTERN PAVERS, LLC | -9.8% | 5 |
| Oct 7, 2026 | 0017-13-013F 2B26(106) | Atascosa San Antonio |
SH 132:0017-13-013; SCSH 132 · Seal Coat | $10,853,914 | $10,890,777 | RONALD R. WAGNER & CO., LP | +0.3% | 3 |
| Oct 7, 2026 | 0510-06-024F 2B26(110) | Fannin Paris |
FM 273 FDR w/OverlayFM 273 · Overlay | $10,924,688 | $9,766,246 | A. K. GILLIS & SONS, LLC | -10.6% | 6 |
| Oct 7, 2026 | 0022-01-034BR 2025(538) | Terrell Odessa |
US 90 Sanderson Canyon Bridge @ UPRRUS 90 · Bridge Replacement | $7,285,906 | $6,768,348 | RELMCO, INC. | -7.1% | 7 |
| Oct 7, 2026 | 0303-04-039F 2B26(095) | Briscoe Childress |
SH 86 12 Miles W of Hall C/L to Hall C/LSH 86 · Seal Coat | $5,605,277 | $6,256,780 | NORTHEASTERN PAVERS, LLC | +11.6% | 4 |
| Oct 7, 2026 | 6509-92-001RMC - A00224097 | Harris Maintenance Division |
FY 27 HOU Emergency Debris RemovalIH0010 · Routine Maintenance Project - Sealed | $4,923,328 | $4,412,777 | GLOBAL EMERGENCY SERVICES, LLC. | -10.4% | 5 |
| Oct 7, 2026 | 0912-72-848F 2026(834) | Harris Houston |
IH 45, IH 610, US 290, FM 1458 RepairsVarious · Bridge Widening or Rehabilitation | $4,359,974 | $4,064,176 | RAGLE CONSTRUCTION, INC. | -6.8% | 6 |
| Oct 7, 2026 | 0067-17-039BR 2B26(113) | Randall Amarillo |
IH 27 NB/SH 217 BRG BMIPIH 27 · Bridge Maintenance | $3,795,189 | $3,904,923 | GIBSON & ASSOCIATES, INC. | +2.9% | 5 |
| Oct 7, 2026 | 0092-03-064F 2B26(103) | Ellis Dallas |
IH 45: S of Risinger Rd to Dallas Co LnIH 45 · Safety Improvement Projects | $4,533,562 | $3,761,164 | XIT PAVING AND CONSTRUCTION INC. | -17.0% | 8 |
| Oct 7, 2026 | 6507-19-001RMC - A00223507 | Medina San Antonio |
2027 - RMC SEAL COATSH0132 · Routine Maintenance Project - Sealed | $2,611,385 | $2,877,263 | RONALD R. WAGNER & CO., LP | +10.2% | 3 |
| Oct 7, 2026 | 6504-67-001RMC - A00222861 | Harris Houston |
6504-67-001 FULL DEPTH CONCRETESL0008 · Routine Maintenance Project - Sealed | $3,049,175 | $2,731,500 | ISI CONTRACTING, INC. | -10.4% | 4 |
| Oct 7, 2026 | 0907-00-217C 907-00-217 | Tom Green San Angelo |
0907-00-217 VA PAVEMENT MARKINGSVarious · Traffic Control Devices | $3,446,187 | $2,539,432 | FLAT LINE, INC. | -26.3% | 7 |
| Oct 7, 2026 | 6504-96-001RMC - A00222965 | Erath Fort Worth |
FY27, Flexible Pavement, Erath, etc.US0281 · Routine Maintenance Project - Sealed | $2,731,308 | $2,461,750 | NORTHEASTERN PAVERS, LLC | -9.9% | 3 |
| Oct 7, 2026 | 6506-33-001RMC - A00223228 | Jasper Beaumont |
FY 27 Ditch Cleaning and ReshapingUS0096 · Routine Maintenance Project | $2,711,299 | $2,396,085 | TEXAS DRAINAGE INC. | -11.6% | 2 |
| Oct 7, 2026 | 6506-90-001RMC - A00223436 | Tarrant Fort Worth |
FY27, Guardrail, N TarrantUS0081 · Routine Maintenance Project - Sealed | $2,699,848 | $1,895,621 | SHORT-LINE, LLC | -29.8% | 3 |
| Oct 7, 2026 | 0196-03-288C 196-3-288 | Dallas Dallas |
Victory Station At IH 35E SBFRIH 35E · Pedestrian, Sidewalks & Curb Ramps | $1,273,638 | $1,177,500 | GARRET SHIELDS INFRASTRUCTURE | -7.5% | 9 |
| Oct 7, 2026 | 6503-84-001RMC - A00222519 | McLennan Waco |
MBGF - McLennan AOSH0006 · Routine Maintenance Project - Sealed | $1,513,544 | $1,158,972 | T&L CLEANING SERVICES LLC | -23.4% | 4 |
| Oct 7, 2026 | 0921-02-527STP 2025(299)HESG | Hidalgo Pharr |
PHR_CANTON RD_FY24_1E CANTON RD · Safety Improvement Projects | $621,189 | $1,118,074 | DIGG COMMERCIAL, LLC | +80.0% | 1 |
| Oct 7, 2026 | 6493-26-001BPM - A00218294 | Wise Fort Worth |
FY2026 - BPM Jack & Wise CountiesSH0114 · Bridge Preventative Maintenance - Sealed | $1,412,531 | $1,040,615 | SHALOM SERVICES CORPORATION | -26.3% | 7 |
| Oct 7, 2026 | 0906-00-295F 2B26(109) | Ector Odessa |
FY27_DistrictwideLargeSignVarious · Traffic Control Devices | $1,037,236 | $899,871 | HJC FARMS, INC. | -13.2% | 6 |
| Oct 7, 2026 | 6507-26-001RMC - A00223523 | Midland Odessa |
6507-26-001 Brush RemovalSH0349 · Routine Maintenance Project | $1,999,722 | $746,150 | SCR CIVIL CONSTRUCTION, LLC | -62.7% | 11 |
| Oct 7, 2026 | 6503-72-001BPM - A00222466 | Lampasas Brownwood |
MISC. BRIDGE REPAIR (BPM 2027)FM0581 · Bridge Preventative Maintenance | $902,155 | $719,494 | TAYLOR BRIDGE LLC | -20.2% | 9 |
| Oct 7, 2026 | 6508-26-001MMC - A00223762 | Garza Maintenance Division |
2026 - RDC Complex ChlorideUS0084 · Material Maintenance Project | $337,920 | $488,505 | NSG LOGISTICS, LLC | +44.6% | 1 |
| Oct 7, 2026 | 0922-20-030BR 2025(820) | La Salle Laredo |
Off-Syst Charlie Brown Rd @ DrawBROWN RD · Bridge Replacement | $668,834 | $485,016 | PRESIDIO CONTRACTING, LLC | -27.5% | 6 |
| Oct 7, 2026 | 1137-02-044STP 2B26(080)VRU | Cameron Pharr |
PHR_SL499_FY24SL 499 · Safety Improvement Projects | $105,184 | $102,744 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | -2.3% | 4 |
| Oct 6, 2026 | 0095-03-100BR 2B26(100) | Kaufman Dallas |
US 80 WESTBOUND AT BUFFALO CRE-9503100US 80 · Bridge Replacement | $55,640,546 | $55,012,735 | HIGHWAY 19 CONSTRUCTION LLC | -1.1% | 10 |
| Oct 6, 2026 | 0009-11-248F 2B26(101) | Dallas Dallas |
IH 30 AT BASS PRO DRIVEIH 30 · Interchange (New or Reconstructed) | $51,740,494 | $54,378,798 | RAGLE CONSTRUCTION, INC. | +5.1% | 7 |
| Oct 6, 2026 | 2502-01-024F 2B26(065) | Bell Waco |
WNF | IH 14 | IH 35SL 121 · Widen Non-Freeway | $24,664,269 | $22,052,184 | BIG CREEK CONSTRUCTION, LTD. | -10.6% | 6 |
| Oct 6, 2026 | 1122-01-034C 1122-1-34 | Karnes Corpus Christi |
FM791 Karnes RefMk 526 to FM887 JunctionFM 791 · Rehabilitation of Existing Road | $17,995,870 | $17,798,655 | CK NEWBERRY, LLC | -1.1% | 7 |
| Oct 6, 2026 | 0010-08-061F 2B26(092) | Morris Atlanta |
US 67 from US 259 to Titus C/LUS 67 · Seal Coat | $11,041,220 | $11,965,134 | SELECT MAINTENANCE, L.L.C. | +8.4% | 6 |
| Oct 6, 2026 | 0086-11-054F 2B26(068) | Jim Wells Corpus Christi |
SH44JimWellsUS281toSanDiegoEOM(FY27SC)SH 44 · Seal Coat | $12,684,494 | $11,654,368 | RONALD R. WAGNER & CO., LP | -8.1% | 4 |
| Oct 6, 2026 | 0410-02-047F 2B26(111) | Grayson Paris |
US 69 3R RehabUS 69 · Rehabilitation of Existing Road | $9,182,925 | $9,878,022 | HIGHWAY 19 CONSTRUCTION LLC | +7.6% | 7 |
| Oct 6, 2026 | 0024-02-081F 2B26(108) | Uvalde San Antonio |
US 90; 0024-02-081; SCUS 90 · Seal Coat | $8,106,446 | $8,592,887 | RONALD R. WAGNER & CO., LP | +6.0% | 4 |
| Oct 6, 2026 | 6501-58-001RMC - A00221514 | Harrison Atlanta |
Mill and Inlay (S) FY2027IH0020 · Routine Maintenance Project - Sealed | $6,132,750 | $6,111,500 | EAST TEXAS BRIDGE, INC. | -0.3% | 4 |
| Oct 6, 2026 | 6501-57-001RMC - A00221513 | Bowie Atlanta |
Mill and Inlay (N) FY2027IH0030 · Routine Maintenance Project - Sealed | $6,132,750 | $5,500,500 | EAST TEXAS BRIDGE, INC. | -10.3% | 5 |
| Oct 6, 2026 | 0387-01-016F 2B26(123) | Collin Dallas |
FM 75 FROM MONTE CARLO BLVD TO-38701016FM 75 · Rehabilitation of Existing Road | $5,938,082 | $4,906,593 | A. K. GILLIS & SONS, LLC | -17.4% | 8 |
| Oct 6, 2026 | 6503-57-001RMC - A00222422 | Dallas Dallas |
Large Guide Sign Repl 2026 (Non-Site)US0080 · Routine Maintenance Project - Sealed | $2,988,038 | $3,713,700 | SYNERGY SIGNS & SERVICES LLC | +24.3% | 4 |
| Oct 6, 2026 | 0249-02-026F 2026(088) | Archer Wichita Falls |
US 281, FM 1954 to Lake CreekUS 281 · Overlay | $3,056,397 | $3,682,675 | OVERLAND CORPORATION | +20.5% | 5 |
| Oct 6, 2026 | 6496-56-001RMC - A00219449 | Brown Brownwood |
THERMOPLASTIC STRIPING AND PAVUS0377 · Routine Maintenance Project | $4,414,901 | $3,276,697 | DOUBLE A CONTRACTING, L.P. | -25.8% | 7 |
| Oct 6, 2026 | 0911-00-188F 2B26(114) | Angelina Lufkin |
VA_2027 Dist Wide - BMNVarious · Bridge Maintenance | $2,428,360 | $3,269,224 | BLACKSMITH VENTURES LLC | +34.6% | 5 |
| Oct 6, 2026 | 6504-70-001RMC - A00222877 | Wood Tyler |
Traffic Control Services FY 27 WoodUS0080 · Routine Maintenance Project - Sealed | $2,303,800 | $2,735,000 | FC TRAFFIC CONTROL, LLC | +18.7% | 2 |
| Oct 6, 2026 | 0912-34-209BR 2023(651) | Fort Bend Houston |
Pool Hill Rd at Brookshire CreekPOOL HILL RD · Bridge Replacement | $2,127,190 | $1,963,405 | GARRET SHIELDS INFRASTRUCTURE | -7.7% | 9 |
| Oct 6, 2026 | 0168-03-040STP 2B26(087)HES | Parmer Lubbock |
US60-FM1172 to Castro CL FY27 HSIPUS 60 · Safety Improvement Projects | $2,217,841 | $1,696,792 | GRATIOT CONSTRUCTION, LTD. | -23.5% | 6 |
| Oct 6, 2026 | 6497-96-001RMC - A00219865 | Victoria Yoakum |
Concrete Punch OutsUS0059 · Routine Maintenance Project - Sealed | $1,356,250 | $1,521,875 | D&S CONCRETE CONTRACTORS LLC | +12.2% | 5 |
| Oct 6, 2026 | 6496-83-001RMC - A00219476 | Gregg Tyler |
FY 27 Pavement Markings Call OutUS0080 · Routine Maintenance Project - Sealed | $1,529,895 | $1,287,808 | STRIPING TECHNOLOGY, L.P. | -15.8% | 2 |
| Oct 6, 2026 | 6500-59-001BPM - A00220834 | La Salle Laredo |
BPM - La Salle, Webb, Dimmit, etc.IH0035 · Bridge Preventative Maintenance | $1,327,986 | $1,245,105 | TAYLOR BRIDGE LLC | -6.2% | 8 |
| Oct 6, 2026 | 6497-69-001RMC - A00219765 | Hidalgo Pharr |
Large Sign Replacement District WideIH0069C · Routine Maintenance Project - Sealed | $1,197,322 | $1,098,005 | VACA UNDERGROUND UTILITIES INC | -8.3% | 3 |
| Oct 6, 2026 | 1414-03-043STP 2027(009)HES | Brazoria Houston |
FM 1462 - W of Troon Dr to BS 35-CFM 1462 · Safety Improvement Projects | $1,078,722 | $974,716 | DURWOOD GREENE CONSTRUCTION CO. | -9.6% | 2 |
| Oct 6, 2026 | 6504-87-001RMC - A00222925 | Bell Waco |
METAL BEAM GUARD FENCE REPAIR - FY 27US0190 · Routine Maintenance Project - Sealed | $915,307 | $750,704 | ROSS SA ENTERPRISE LLC | -18.0% | 3 |
| Oct 6, 2026 | 6499-74-001BPM - A00220460 | Comanche Brownwood |
MISCELLANEOUS BRIDGE REPAIR (BPM 2027)SH0016 · Bridge Preventative Maintenance - Sealed | $980,991 | $727,661 | TAYLOR BRIDGE LLC | -25.8% | 11 |
| Oct 6, 2026 | 6502-41-001RMC - A00221787 | Austin Yoakum |
IH 10 Austin County StripingIH0010 · Routine Maintenance Project - Sealed | $1,559,292 | $689,187 | STRIPE LINES, INC. | -55.8% | 3 |
| Oct 6, 2026 | 0669-01-070STP 2B26(079)HES | Hidalgo Pharr |
FM 681 - Install Warning Signs at CurvesFM 681 · Safety Improvement Projects | $558,023 | $441,565 | TRP INFRASTRUCTURE SERVICES, LLC | -20.9% | 3 |
| Oct 6, 2026 | 0204-01-075BR 2B26(063) | Williamson Austin |
US 79 - At Drain (BMIP24)US 79 · Bridge Maintenance | $607,197 | $344,329 | TAYLOR BRIDGE LLC | -43.3% | 14 |
| Oct 6, 2026 | 0590-05-057STP 2B24(392)TAPS | Milam Bryan |
FM 486 Downtown Streetscape - TASAFM 486 · Pedestrian, Sidewalks & Curb Ramps | $235,742 | $257,450 | YOKO EXCAVATING, LLC | +9.2% | 10 |
| Oct 5, 2026 | 6512-23-001SUP - A00224821 | El Paso El Paso |
SUP - WAO Landscape MaintenanceUS0054 · State Use Project | $667,944 | — | 0 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.