| 1 | 132-6002 |
EMBANKMENT (FINAL)(DENS CONT)(TY A) | 90 | CY |
$180.00 |
$200.00 |
$34.20 |
| 2 | 401-6001 |
FLOWABLE BACKFILL | 40 | CY |
$240.00 |
$525.00 |
$285.00 |
| 3 | 427-6002 |
CONCRETE PAINT FINISH | 200 | SF |
$12.00 |
$65.00 |
$6.84 |
| 4 | 429-6004 |
CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 150 | SF |
$250.00 |
$200.00 |
$256.50 |
| 5 | 429-6006 |
CONC STR REPR(RAPID DECK REP(FULL DPT)) | 200 | SF |
$480.00 |
$250.00 |
$570.00 |
| 6 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 150 | SF |
$241.50 |
$280.00 |
$570.00 |
| 7 | 429-6008 |
CONC STR REPR(RAPID VERT AND OVERHEAD) | 50 | SF |
$480.00 |
$280.00 |
$570.00 |
| 8 | 429-6009 |
CONC STR REPAIR (STANDARD) | 1,000 | SF |
$300.00 |
$200.00 |
$456.00 |
| 9 | 432-6006 |
RIPRAP (CONC)(CL B) | 150 | CY |
$480.00 |
$750.00 |
$513.00 |
| 10 | 500-6001 |
MOBILIZATION | 1 | LS |
$50,000.00 |
$40,000.00 |
$21,660.00 |
| 11 | 540-6038 |
CONNECTOR PLATE FOR THRIE BEAM | 4 | EA |
$4,200.00 |
$2,000.00 |
$1,710.00 |
| 12 | 778-6012 |
CONCRETE RAIL REPAIR (TYPE 551) | 50 | LF |
$144.00 |
$450.00 |
$456.00 |
| 13 | 778-6075 |
CONC RAIL REPAIR(REMOVE AND REPL RAIL) | 250 | LF |
$440.00 |
$625.00 |
$684.00 |
| 14 | 6185-6002 |
TMA (STATIONARY) | 100 | DAY |
$300.00 |
$450.00 |
$513.00 |