| 1 | 351-6006 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | 3,702 | SY |
$85.00 |
$116.04 |
| 2 | 354-6176 |
PLANE ASPH CONC PAV (1 1/2" TO 2 1/2") | 100,909 | SY |
$2.50 |
$2.51 |
| 3 | 500-6001 |
MOBILIZATION | 1 | LS |
$250,000.00 |
$118,000.00 |
| 4 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$3,500.00 |
$1,000.00 |
| 5 | 662-6112 |
WK ZN PAV MRK SHT TERM RMV (W)(4") | 8,962 | LF |
$1.50 |
$1.50 |
| 6 | 662-6113 |
WK ZN PAV MRK SHT TERM RMV (Y)(4") | 17,921 | LF |
$1.50 |
$1.50 |
| 7 | 666-6299 |
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) | 20,986 | LF |
$0.4000 |
$0.5500 |
| 8 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 52,635 | LF |
$0.4000 |
$0.5500 |
| 9 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 57,135 | LF |
$0.3800 |
$0.5500 |
| 10 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 1,500 | LF |
$15.00 |
$13.14 |
| 11 | 672-6007 |
REFL PAV MRKR TY I-C | 820 | EA |
$4.50 |
$4.00 |
| 12 | 672-6009 |
REFL PAV MRKR TY II-A-A | 1,551 | EA |
$4.50 |
$4.00 |
| 13 | 3077-6033 |
SP MIXES SP-C SAC-A PG76-22 | 11,496 | TON |
$140.00 |
$168.91 |
| 14 | 3077-6075 |
TACK COAT | 3,136 | GAL |
$5.00 |
$4.75 |
| 15 | 3079-6007 |
PFC-C (PG76 MIX) SAC-A | 898 | TON |
$160.00 |
$207.95 |
| 16 | 3079-6023 |
TACK COAT | 327 | GAL |
$5.00 |
$4.75 |
| 17 | 6185-6002 |
TMA (STATIONARY) | 41 | DAY |
$200.00 |
$50.00 |
| 18 | 6185-6005 |
TMA (MOBILE OPERATION) | 41 | DAY |
$200.00 |
$50.00 |