| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 277 | CY |
$20.00 |
$55.00 |
$40.00 |
$100.00 |
$60.00 |
$60.00 |
| 2 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 124 | CY |
$55.00 |
$44.00 |
$29.00 |
$75.00 |
$70.00 |
$60.00 |
| 3 | 162-6002 |
BLOCK SODDING | 266 | SY |
$7.50 |
$6.00 |
$8.00 |
$25.00 |
$4.00 |
$28.00 |
| 4 | 168-6001 |
VEGETATIVE WATERING | 100 | MG |
$20.00 |
$1.00 |
$21.00 |
$20.00 |
$100.00 |
$75.00 |
| 5 | 400-6008 |
CUT & RESTORE ASPH PAVING | 140 | SY |
$95.00 |
$275.00 |
$188.00 |
$325.00 |
$150.00 |
$315.00 |
| 6 | 401-6001 |
FLOWABLE BACKFILL | 330 | CY |
$350.00 |
$275.00 |
$325.00 |
$400.00 |
$600.00 |
$525.00 |
| 7 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 131 | LF |
$10.00 |
$1.00 |
$10.00 |
$56.00 |
$6.00 |
$20.00 |
| 8 | 420-6009 |
CL A CONC (COLLAR) | 1 | EA |
$250.00 |
$5,500.00 |
$3,500.00 |
$5,000.00 |
$6,000.00 |
$1,365.00 |
| 9 | 432-6003 |
RIPRAP (CONC)(6 IN) | 39 | CY |
$650.00 |
$770.00 |
$1,000.00 |
$359.00 |
$700.00 |
$1,155.00 |
| 10 | 432-6024 |
RIPRAP (STONE COMMON)(DRY)(12 IN) | 5 | CY |
$250.00 |
$550.00 |
$220.00 |
$500.00 |
$300.00 |
$1,785.00 |
| 11 | 464-6008 |
RC PIPE (CL III)(36 IN) | 204 | LF |
$250.00 |
$242.00 |
$265.00 |
$400.00 |
$350.00 |
$300.00 |
| 12 | 464-6009 |
RC PIPE (CL III)(42 IN) | 88 | LF |
$325.00 |
$330.00 |
$288.00 |
$400.00 |
$500.00 |
$475.00 |
| 13 | 467-6050 |
SET (TY I)(S=10 FT)(HW=4FT)(4:1)(C) | 2 | EA |
$4,500.00 |
$27,500.00 |
$14,000.00 |
$4,500.00 |
$8,000.00 |
$21,000.00 |
| 14 | 467-6448 |
SET (TY II) (36 IN) (RCP) (3: 1) (C) | 2 | EA |
$3,000.00 |
$8,800.00 |
$5,500.00 |
$4,500.00 |
$8,000.00 |
$6,300.00 |
| 15 | 467-6461 |
SET (TY II) (42 IN) (RCP) (3: 1) (C) | 4 | EA |
$4,300.00 |
$9,900.00 |
$6,500.00 |
$7,500.00 |
$12,000.00 |
$8,400.00 |
| 16 | 480-6001 |
CLEAN EXIST CULVERTS | 1 | EA |
$1,025.00 |
$5,500.00 |
$3,500.00 |
$900.00 |
$10,000.00 |
$12,000.00 |
| 17 | 496-6007 |
REMOV STR (PIPE) | 322 | LF |
$20.00 |
$11.00 |
$30.00 |
$52.00 |
$100.00 |
$50.00 |
| 18 | 500-6001 |
MOBILIZATION | 1 | LS |
$38,500.00 |
$5,000.00 |
$57,011.00 |
$40,000.00 |
$30,000.00 |
$223,000.00 |
| 19 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$4,500.00 |
$1.00 |
$2,500.00 |
$5,000.00 |
$8,000.00 |
$15,750.00 |
| 20 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 155 | LF |
$10.00 |
$6.00 |
$5.00 |
$10.00 |
$3.00 |
$20.70 |
| 21 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 155 | LF |
$2.00 |
$2.00 |
$3.00 |
$10.00 |
$3.00 |
$5.75 |
| 22 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 350 | LF |
$40.00 |
$44.00 |
$34.00 |
$48.00 |
$60.00 |
$22.71 |
| 23 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 350 | LF |
$25.00 |
$6.00 |
$5.00 |
$5.00 |
$15.00 |
$2.88 |
| 24 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 2 | EA |
$2,500.00 |
$5,500.00 |
$3,500.00 |
$4,500.00 |
$12,000.00 |
$3,191.25 |
| 25 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 2 | EA |
$500.00 |
$550.00 |
$450.00 |
$562.00 |
$4,000.00 |
$287.50 |
| 26 | 658-6099 |
INSTL OM ASSM (OM-2Z)(WFLX)GND | 8 | EA |
$25.00 |
$55.00 |
$88.00 |
$100.00 |
$8,000.00 |
$345.00 |
| 27 | 666-6170 |
REFL PAV MRK TY II (W) 4" (SLD) | 300 | LF |
$2.00 |
$6.00 |
$18.00 |
$5.00 |
$0.4000 |
$4.03 |
| 28 | 666-6205 |
REFL PAV MRK TY II (Y) 4" (BRK) | 60 | LF |
$2.00 |
$6.00 |
$18.00 |
$5.00 |
$0.4000 |
$4.60 |
| 29 | 666-6207 |
REFL PAV MRK TY II (Y) 4" (SLD) | 150 | LF |
$2.00 |
$6.00 |
$18.00 |
$5.00 |
$0.4000 |
$4.03 |
| 30 | 672-6009 |
REFL PAV MRKR TY II-A-A | 6 | EA |
$8.00 |
$6.00 |
$18.00 |
$20.00 |
$6.00 |
$23.00 |
| 31 | 4122-6009 |
THERMOPLASTIC PIPE (24 IN)(PP)(TYPE I) | 120 | LF |
$160.00 |
$165.00 |
$105.00 |
$99.00 |
$60.00 |
$132.00 |
| 32 | 6185-6002 |
TMA (STATIONARY) | 120 | DAY |
$200.00 |
$1.00 |
$1.00 |
$100.00 |
$600.00 |
$100.00 |