| 1 | 104-6054 |
REMOVING CONCRETE(MOW STRIP) | 1,450 | LF |
$7.30 |
$4.90 |
$10.00 |
$8.50 |
|
| 2 | 416-6019 |
DRILL SHAFT (SIGN MTS) (30 IN) | 64 | LF |
$215.76 |
$176.00 |
$100.00 |
$225.00 |
|
| 3 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 59.25 | CY |
$542.48 |
$612.00 |
$450.00 |
$600.00 |
|
| 4 | 500-6001 |
MOBILIZATION | 1 | LS |
$13,000.00 |
$18,085.00 |
$25,000.00 |
$5,000.00 |
|
| 5 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 | MO |
$8,200.00 |
$17,985.00 |
$1,000.00 |
$15,000.00 |
|
| 6 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 1,225 | LF |
$19.69 |
$18.50 |
$35.00 |
$20.00 |
|
| 7 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 3 | EA |
$1,051.63 |
$905.00 |
$5,000.00 |
$2,000.00 |
|
| 8 | 540-6018 |
MTL BM GD FEN TRANS (NON - SYM) | 1 | EA |
$694.17 |
$1,140.00 |
$5,000.00 |
$1,500.00 |
|
| 9 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,225 | LF |
$1.82 |
$2.10 |
$15.00 |
$2.00 |
|
| 10 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 3 | EA |
$144.70 |
$237.00 |
$500.00 |
$250.00 |
|
| 11 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 2 | EA |
$2,568.55 |
$2,600.00 |
$2,500.00 |
$3,000.00 |
|
| 12 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 2 | EA |
$226.42 |
$552.00 |
$1,000.00 |
$250.00 |
|
| 13 | 636-6001 |
ALUMINUM SIGNS (TY A) | 9 | SF |
$21.20 |
$24.00 |
$100.00 |
$30.00 |
|
| 14 | 636-6003 |
ALUMINUM SIGNS (TY O) | 302 | SF |
$31.00 |
$23.95 |
$25.00 |
$30.00 |
|
| 15 | 650-6084 |
INS OH SN SUP(75 FT BRDG) | 1 | EA |
$34,633.33 |
$28,100.00 |
$5,000.00 |
$50,000.00 |
|
| 16 | 650-6204 |
REMOVE OVERHD SIGN SUP | 1 | EA |
$6,385.55 |
$4,490.00 |
$1,000.00 |
$10,000.00 |
|
| 17 | 658-6061 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 16 | EA |
$25.19 |
$48.00 |
$100.00 |
$40.00 |
|
| 18 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$12,000.00 |
$2,365.00 |
$1,000.00 |
$750.00 |
|
| 19 | 6185-6002 |
TMA (STATIONARY) | 68 | DAY |
$100.00 |
$150.05 |
$50.00 |
$150.00 |
|
| 20 | 6185-6005 |
TMA (MOBILE OPERATION) | 3 | DAY |
$100.00 |
$536.00 |
$1,000.00 |
$450.00 |
|