| 1 | 104-6022 |
REMOVING CONC (CURB AND GUTTER) | 45 | LF |
$10.00 |
$30.00 |
$15.00 |
$35.00 |
|
| 2 | 110-6003 |
EXCAVATION (SPECIAL) | 29 | CY |
$50.00 |
$50.00 |
$20.00 |
$52.00 |
|
| 3 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 12 | CY |
$35.00 |
$50.00 |
$42.00 |
$68.00 |
|
| 4 | 162-6002 |
BLOCK SODDING | 36 | SY |
$5.00 |
$10.00 |
$4.50 |
$48.00 |
|
| 5 | 340-6011 |
D-GR HMA(SQ) TY-B PG64-22 | 33 | TON |
$200.00 |
$190.00 |
$102.00 |
$327.00 |
|
| 6 | 340-6175 |
D-GR HMA(SQ) TY-F SAC-A PG64-22 | 90 | TON |
$200.00 |
$190.00 |
$125.00 |
$238.00 |
|
| 7 | 354-6001 |
PLAN & TEXT ASPH CONC PAV(0" TO 1") | 168 | SY |
$5.00 |
$9.00 |
$6.00 |
$42.00 |
|
| 8 | 432-6003 |
RIPRAP (CONC)(6 IN) | 4 | CY |
$750.00 |
$450.00 |
$750.00 |
$550.00 |
|
| 9 | 500-6001 |
MOBILIZATION | 1 | LS |
$5,000.00 |
$14,000.00 |
$15,000.00 |
$6,500.00 |
|
| 10 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 | MO |
$2,500.00 |
$2,000.00 |
$15,000.00 |
$3,000.00 |
|
| 11 | 529-6008 |
CONC CURB & GUTTER (TY II) | 235 | LF |
$50.00 |
$35.00 |
$35.00 |
$30.00 |
|
| 12 | 550-6003 |
CHAIN LINK FENCE (REMOVE) | 40 | LF |
$15.00 |
$5.00 |
$3.00 |
$20.00 |
|
| 13 | 550-6006 |
GATE (REMOVE) | 2 | EA |
$500.00 |
$100.00 |
$700.00 |
$400.00 |
|
| 14 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 3 | EA |
$100.00 |
$200.00 |
$540.00 |
$100.00 |
|
| 15 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 605 | LF |
$1.00 |
$4.00 |
$0.3500 |
$4.85 |
|
| 16 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 6 | EA |
$250.00 |
$250.00 |
$204.00 |
$334.00 |
|
| 17 | 752-6017 |
STUMP REMOVAL (12" OR LESS) | 22 | EA |
$30.00 |
$50.00 |
$200.00 |
$50.00 |
|