| 1 | 104-6028 |
REMOVING CONC (MISC) | 18 | SY |
$750.00 |
$100.00 |
$2,700.00 |
$100.00 |
|
| 2 | 110-6002 |
EXCAVATION (CHANNEL) | 280 | CY |
$18.00 |
$110.00 |
$110.00 |
$20.00 |
|
| 3 | 429-6001 |
CONC STR REPAIR(CLEAN & COAT WTH EPOXY) | 20 | SF |
$400.00 |
$60.00 |
$255.00 |
$350.00 |
|
| 4 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 4 | SF |
$350.00 |
$210.00 |
$600.00 |
$1,000.00 |
|
| 5 | 432-6002 |
RIPRAP (CONC)(5 IN) | 15.7 | CY |
$1,200.00 |
$1,400.00 |
$1,150.00 |
$850.00 |
|
| 6 | 432-6016 |
RIPRAP (STONE TY R)(DRY)(12 IN) | 34 | CY |
$175.00 |
$290.00 |
$450.00 |
$210.00 |
|
| 7 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 14.7 | CY |
$550.00 |
$1,200.00 |
$575.00 |
$850.00 |
|
| 8 | 446-6002 |
CLEAN & PAINT EXIST STR (SYSTEM II) | 1 | LS |
$10,000.00 |
$18,000.00 |
$6,000.00 |
$20,000.00 |
|
| 9 | 467-6003 |
SET (REPLACE PIPE RUNNER ASSEMBLY) | 8 | EA |
$5,000.00 |
$1,800.00 |
$1,500.00 |
$5,000.00 |
|
| 10 | 467-6004 |
SET (REPLACE PIPE RUNNER) | 3 | EA |
$1,500.00 |
$2,100.00 |
$1,500.00 |
$1,500.00 |
|
| 11 | 480-6001 |
CLEAN EXIST CULVERTS | 1 | EA |
$4,000.00 |
$4,500.00 |
$20,000.00 |
$5,000.00 |
|
| 12 | 496-6099 |
REMOVE STR (RAIL) | 75 | LF |
$17.00 |
$50.00 |
$15.00 |
$100.00 |
|
| 13 | 500-6001 |
MOBILIZATION | 1 | LS |
$50,000.00 |
$40,000.00 |
$47,000.00 |
$65,000.00 |
|
| 14 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$10,000.00 |
$4,600.00 |
$2,200.00 |
$15,000.00 |
|
| 15 | 512-6094 |
PTB (FUR & INST)(STEEL) | 300 | LF |
$75.00 |
$200.00 |
$180.00 |
$120.00 |
|
| 16 | 512-6097 |
PTB (STKPL)(STEEL) | 300 | LF |
$200.00 |
$50.00 |
$30.00 |
$30.00 |
|
| 17 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 431 | LF |
$55.00 |
$32.00 |
$26.00 |
$30.00 |
|
| 18 | 540-6005 |
TERMINAL ANCHOR SECTION | 1 | EA |
$1,000.00 |
$1,600.00 |
$1,600.00 |
$1,850.00 |
|
| 19 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 4 | EA |
$1,000.00 |
$900.00 |
$1,600.00 |
$1,850.00 |
|
| 20 | 540-6020 |
MTL W - BEAM GD FEN (LOW FILL CULVERT) | 94 | LF |
$55.00 |
$35.00 |
$65.00 |
$35.00 |
|
| 21 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 187.5 | LF |
$8.00 |
$10.00 |
$6.00 |
$30.00 |
|
| 22 | 544-6002 |
GUARDRAIL END TREATMENT (MOVE & RESET) | 1 | EA |
$1,650.00 |
$2,400.00 |
$1,500.00 |
$1,500.00 |
|
| 23 | 544-6007 |
GDRAIL END TRT(INSTALL)(HBA POST) | 3 | EA |
$2,700.00 |
$2,800.00 |
$3,200.00 |
$3,100.00 |
|
| 24 | 545-6004 |
CRASH CUSH ATTEN (STKPL) | 1 | EA |
$9,000.00 |
$6,000.00 |
$12,000.00 |
$5,000.00 |
|
| 25 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$9,000.00 |
$14,000.00 |
$3,000.00 |
$15,000.00 |
|
| 26 | 644-6072 |
RELOCATE BRDG MNT CLEARANCE SGN ASSM | 2 | EA |
$650.00 |
$3,500.00 |
$1,500.00 |
$1,500.00 |
|
| 27 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 2 | EA |
$35.00 |
$40.00 |
$25.00 |
$100.00 |
|
| 28 | 658-6015 |
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 | 26 | EA |
$35.00 |
$95.00 |
$25.00 |
$100.00 |
|
| 29 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 6 | EA |
$120.00 |
$100.00 |
$130.00 |
$100.00 |
|
| 30 | 776-6051 |
REPAIR (TY T1) | 12.5 | LF |
$300.00 |
$450.00 |
$110.00 |
$2,500.00 |
|
| 31 | 778-6004 |
CONCRETE RAIL REPAIR (TYPE 202) | 30 | LF |
$2,000.00 |
$600.00 |
$1,300.00 |
$1,100.00 |
|
| 32 | 784-6034 |
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB) | 3 | EA |
$6,200.00 |
$23,000.00 |
$26,000.00 |
$55,000.00 |
|
| 33 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 40 | DAY |
$170.00 |
$250.00 |
$50.00 |
$125.00 |
|