| 1 | 104-6010 |
REMOVING CONC (RIPRAP) | 1 | CY |
$170.00 |
$1,517.00 |
$1,800.00 |
$2,063.54 |
| 2 | 110-6002 |
EXCAVATION (CHANNEL) | 15 | CY |
$25.00 |
$216.00 |
$120.00 |
$277.34 |
| 3 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 37 | CY |
$25.00 |
$183.00 |
$110.00 |
$128.06 |
| 4 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 15 | CY |
$25.00 |
$249.00 |
$60.00 |
$248.46 |
| 5 | 360-6027 |
CURB (TYPE II) | 43 | LF |
$20.00 |
$76.00 |
$60.00 |
$121.17 |
| 6 | 401-6001 |
FLOWABLE BACKFILL | 33 | CY |
$175.00 |
$362.00 |
$260.00 |
$325.02 |
| 7 | 403-6001 |
TEMPORARY SPL SHORING | 391 | SF |
$35.00 |
$40.00 |
$32.00 |
$114.47 |
| 8 | 407-6005 |
SHEET PILING (PZ - 22) | 1,015 | SF |
$35.00 |
$44.00 |
$32.00 |
$91.99 |
| 9 | 420-6064 |
CL C CONC (COPING) | 5 | CY |
$2,500.00 |
$2,748.00 |
$2,400.00 |
$5,840.00 |
| 10 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 86 | SF |
$195.00 |
$283.00 |
$140.00 |
$289.48 |
| 11 | 432-6002 |
RIPRAP (CONC)(5 IN) | 17 | CY |
$500.00 |
$669.00 |
$1,500.00 |
$2,105.65 |
| 12 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 6.5 | CY |
$200.00 |
$480.00 |
$400.00 |
$1,164.75 |
| 13 | 432-6035 |
RIPRAP (STONE PROTECTION)(24 IN) | 24 | CY |
$200.00 |
$480.00 |
$280.00 |
$630.91 |
| 14 | 442-6004 |
STR STEEL (ROLLED BEAM) | 5,725 | LB |
$3.50 |
$3.60 |
$14.00 |
$14.74 |
| 15 | 480-6001 |
CLEAN EXIST CULVERTS | 1 | EA |
$1,500.00 |
$3,810.00 |
$4,500.00 |
$4,504.49 |
| 16 | 500-6001 |
MOBILIZATION | 1 | LS |
$13,420.00 |
$12,900.00 |
$5,000.00 |
$88,101.52 |
| 17 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 | MO |
$3,000.00 |
$3,750.00 |
$900.00 |
$757.52 |
| 18 | 752-6005 |
TREE REMOVAL (4" - 12" DIA) | 7 | EA |
$300.00 |
$301.00 |
$300.00 |
$1,350.49 |