| 1 | 104-6009 |
REMOVING CONC (RIPRAP) | 1,336 | SY |
$25.00 |
$38.06 |
$23.00 |
$25.00 |
$19.50 |
$50.00 |
$50.00 |
|
| 2 | 401-6001 |
FLOWABLE BACKFILL | 209.2 | CY |
$250.00 |
$373.86 |
$385.00 |
$400.00 |
$323.00 |
$500.00 |
$350.00 |
|
| 3 | 428-6001 |
PENETRATING CONCRETE SURFACE TREATMENT | 8,682 | SY |
$8.50 |
$12.83 |
$9.85 |
$10.00 |
$4.70 |
$20.00 |
$12.00 |
|
| 4 | 429-6001 |
CONC STR REPAIR(CLEAN & COAT WTH EPOXY) | 287 | SF |
$250.00 |
$213.64 |
$109.25 |
$180.00 |
$36.00 |
$150.00 |
$250.00 |
|
| 5 | 429-6004 |
CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 2,785 | SF |
$105.00 |
$177.43 |
$85.00 |
$100.00 |
$55.00 |
$150.00 |
$300.00 |
|
| 6 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 1,594 | SF |
$175.00 |
$73.99 |
$172.50 |
$300.00 |
$64.00 |
$200.00 |
$200.00 |
|
| 7 | 429-6009 |
CONC STR REPAIR (STANDARD) | 15 | SF |
$500.00 |
$256.78 |
$299.00 |
$400.00 |
$100.00 |
$310.00 |
$500.00 |
|
| 8 | 432-6008 |
RIPRAP (CONC)(CL B)(RR8&RR9) | 183 | CY |
$550.00 |
$601.24 |
$649.75 |
$550.00 |
$625.00 |
$750.00 |
$600.00 |
|
| 9 | 438-6004 |
CLEANING AND SEALING EXIST JOINTS(CL7) | 4,663 | LF |
$35.00 |
$18.52 |
$48.00 |
$45.00 |
$27.00 |
$50.00 |
$15.00 |
|
| 10 | 439-6017 |
CONCRETE OVERLAY (1.75 IN) | 356 | SY |
$150.00 |
$146.88 |
$150.00 |
$300.00 |
$141.00 |
$200.00 |
$250.00 |
|
| 11 | 446-6002 |
CLEAN & PAINT EXIST STR (SYSTEM II) | 1 | LS |
$75,000.00 |
$161,075.56 |
$837,100.00 |
$200,000.00 |
$1,755,000.00 |
$900,000.00 |
$850,000.00 |
|
| 12 | 451-6024 |
RETROFIT RAIL (TY SSTR) | 13,825 | LF |
$135.00 |
$133.15 |
$200.10 |
$195.00 |
$151.00 |
$255.00 |
$255.00 |
|
| 13 | 483-6002 |
MILLING CONCRETE SLAB (1 IN) | 356 | SY |
$60.00 |
$14.95 |
$27.50 |
$28.00 |
$48.00 |
$30.00 |
$150.00 |
|
| 14 | 483-6021 |
HYDRO-DEMOLITION (3/4 IN) | 356 | SY |
$300.00 |
$132.03 |
$160.97 |
$165.00 |
$95.00 |
$175.00 |
$250.00 |
|
| 15 | 499-6001 |
ADJUST STL SHOES | 29 | EA |
$7,500.00 |
$4,142.55 |
$5,150.00 |
$12,000.00 |
$15,000.00 |
$5,000.00 |
$2,500.00 |
|
| 16 | 500-6001 |
MOBILIZATION | 1 | LS |
$750,000.00 |
$554,500.88 |
$740,000.00 |
$850,000.00 |
$905,000.00 |
$650,000.00 |
$1,000,000.00 |
|
| 17 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 19 | MO |
$10,000.00 |
$21,363.69 |
$25,300.00 |
$45,000.00 |
$100,000.00 |
$10,000.00 |
$10,000.00 |
|
| 18 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 80 | LF |
$15.00 |
$7.48 |
$18.70 |
$10.00 |
$17.00 |
$20.00 |
$18.00 |
|
| 19 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 80 | LF |
$10.00 |
$1.82 |
$9.63 |
$2.00 |
$8.75 |
$11.00 |
$9.00 |
|
| 20 | 512-6094 |
PTB (FUR & INST)(STEEL) | 640 | LF |
$100.00 |
$42.73 |
$51.50 |
$40.00 |
$100.00 |
$60.00 |
$85.00 |
|
| 21 | 512-6095 |
PTB (MOVE)(STEEL) | 21,640 | LF |
$15.00 |
$8.41 |
$12.50 |
$25.00 |
$6.30 |
$14.00 |
$15.00 |
|
| 22 | 512-6096 |
PTB (REMOVE)(STEEL) | 640 | LF |
$20.00 |
$21.36 |
$10.50 |
$9.00 |
$3.60 |
$14.00 |
$20.00 |
|
| 23 | 529-6036 |
CONCRETE CURB (SPECIAL) | 440 | LF |
$80.00 |
$122.84 |
$59.80 |
$100.00 |
$22.00 |
$60.00 |
$65.00 |
|
| 24 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 38 | EA |
$2,750.00 |
$1,810.57 |
$1,500.00 |
$1,200.00 |
$900.00 |
$2,800.00 |
$5,000.00 |
|
| 25 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 1 | EA |
$2,750.00 |
$1,185.68 |
$2,500.00 |
$3,500.00 |
$1,200.00 |
$2,500.00 |
$3,000.00 |
|
| 26 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$18,000.00 |
$10,888.36 |
$10,000.00 |
$12,500.00 |
$15,000.00 |
$10,400.00 |
$30,000.00 |
|
| 27 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 339 | EA |
$35.00 |
$26.70 |
$40.00 |
$22.00 |
$40.00 |
$50.00 |
$100.00 |
|
| 28 | 658-6026 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB | 306 | EA |
$35.00 |
$26.70 |
$40.00 |
$22.00 |
$40.00 |
$50.00 |
$100.00 |
|
| 29 | 666-6081 |
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) | 1 | EA |
$1,600.00 |
$1,228.81 |
$1,402.50 |
$1,150.00 |
$1,275.00 |
$1,500.00 |
$1,500.00 |
|
| 30 | 666-6162 |
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL) | 5,520 | LF |
$2.50 |
$1.23 |
$1.09 |
$1.50 |
$0.9900 |
$1.25 |
$2.00 |
|
| 31 | 666-6225 |
PAVEMENT SEALER 6" | 26,014 | LF |
$0.4000 |
$0.3200 |
$0.1900 |
$0.3300 |
$0.1700 |
$0.2500 |
$2.00 |
|
| 32 | 666-6239 |
PAVEMENT SEALER (ENTR GORE) | 1 | EA |
$325.00 |
$534.09 |
$148.50 |
$250.00 |
$135.00 |
$150.00 |
$1,500.00 |
|
| 33 | 666-6306 |
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) | 5,520 | LF |
$2.50 |
$0.8400 |
$1.09 |
$1.00 |
$0.9900 |
$1.20 |
$2.00 |
|
| 34 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 7,400 | LF |
$0.9000 |
$0.8000 |
$1.09 |
$0.9200 |
$0.9900 |
$1.20 |
$2.00 |
|
| 35 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 7,574 | LF |
$0.9000 |
$0.8200 |
$1.09 |
$0.9200 |
$0.9900 |
$1.20 |
$2.00 |
|
| 36 | 672-6010 |
REFL PAV MRKR TY II-C-R | 337 | EA |
$6.50 |
$5.45 |
$5.50 |
$7.50 |
$5.00 |
$6.00 |
$6.00 |
|
| 37 | 677-6002 |
ELIM EXT PAV MRK & MRKS (6") | 25,400 | LF |
$1.00 |
$0.8700 |
$0.3500 |
$0.6000 |
$0.3200 |
$0.5000 |
$3.00 |
|
| 38 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 26,014 | LF |
$1.00 |
$0.3200 |
$0.1200 |
$0.2000 |
$0.1100 |
$0.2500 |
$3.00 |
|
| 39 | 678-6017 |
PAV SURF PREP FOR MRK (ENTR GORE) | 1 | EA |
$250.00 |
$221.65 |
$63.80 |
$150.00 |
$58.00 |
$100.00 |
$500.00 |
|
| 40 | 713-6001 |
JT SEALING AND CLEANING(TRANS CNTR JTS) | 1,284 | LF |
$22.50 |
$2.03 |
$43.50 |
$3.00 |
$4.00 |
$50.00 |
$60.00 |
|
| 41 | 780-6002 |
CNC CRACK REPAIR (DISCRETE)(INJECT) | 1,496 | LF |
$100.00 |
$30.51 |
$57.50 |
$85.00 |
$26.40 |
$75.00 |
$60.00 |
|
| 42 | 780-6004 |
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) | 2,645 | LF |
$45.00 |
$93.67 |
$32.00 |
$70.00 |
$6.00 |
$48.00 |
$60.00 |
|
| 43 | 780-6006 |
CNC CRACK REPAIR (FLOOD)(GRAVITY) | 21,274 | SF |
$20.00 |
$8.16 |
$6.50 |
$25.00 |
$6.80 |
$26.00 |
$10.00 |
|
| 44 | 784-6002 |
REP STL BRIDGE MEMBER (BEAM) | 1 | EA |
$55,000.00 |
$61,954.69 |
$7,000.00 |
$18,000.00 |
$12,000.00 |
$50,000.00 |
$50,000.00 |
|
| 45 | 784-6056 |
REP STL BRDG MEMB (ANCHOR BOLT NUT) | 1 | EA |
$2,750.00 |
$534.09 |
$500.00 |
$600.00 |
$415.00 |
$500.00 |
$1,500.00 |
|
| 46 | 784-6120 |
REP STL BRIDGE MEMBER (WELD REPAIR) | 4 | LF |
$1,750.00 |
$1,068.18 |
$1,000.00 |
$2,500.00 |
$1,850.00 |
$2,500.00 |
$10,000.00 |
|
| 47 | 785-6004 |
BRIDGE JOINT REPAIR (ARMOR) | 624 | LF |
$500.00 |
$242.69 |
$450.00 |
$375.00 |
$397.00 |
$550.00 |
$800.00 |
|
| 48 | 785-6010 |
BRIDGE JOINT REPLACEMENT (ARMOR) | 508 | LF |
$500.00 |
$358.06 |
$875.00 |
$530.00 |
$665.00 |
$650.00 |
$900.00 |
|
| 49 | 786-6001 |
CARBON FIBER REINF POLYMER PROTECTION | 50 | SF |
$200.00 |
$189.19 |
$226.55 |
$76.00 |
$85.00 |
$225.00 |
$250.00 |
|
| 50 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$15,000.00 |
$28,043.40 |
$20,000.00 |
$45,000.00 |
$20,000.00 |
$10,000.00 |
$16,500.00 |
|
| 51 | 6185-6002 |
TMA (STATIONARY) | 260 | DAY |
$250.00 |
$240.34 |
$350.00 |
$250.00 |
$320.00 |
$275.00 |
$250.00 |
|
| 52 | 6185-6005 |
TMA (MOBILE OPERATION) | 20 | DAY |
$275.00 |
$267.05 |
$500.00 |
$850.00 |
$320.00 |
$350.00 |
$550.00 |
|