| 1 | 100-6002 |
PREPARING ROW | 81.2 | STA |
$2,000.00 |
$1,000.00 |
$910.20 |
$3,914.01 |
|
| 2 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 46 | SY |
$22.00 |
$45.00 |
$31.50 |
$98.50 |
|
| 3 | 105-6013 |
REMOVING STAB BASE & ASPH PAV (9") | 4,212 | SY |
$7.00 |
$4.00 |
$7.00 |
$6.17 |
|
| 4 | 110-6001 |
EXCAVATION (ROADWAY) | 4,251 | CY |
$15.00 |
$25.00 |
$23.60 |
$37.60 |
|
| 5 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 3,659 | CY |
$20.00 |
$17.00 |
$23.60 |
$24.70 |
|
| 6 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 23,699 | SY |
$2.00 |
$1.30 |
$1.96 |
$6.25 |
|
| 7 | 164-6035 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 23,699 | SY |
$0.3000 |
$0.4000 |
$0.3200 |
$0.5200 |
|
| 8 | 164-6071 |
BROADCAST SEED (TEMP)(WARM OR COOL) | 23,699 | SY |
$0.3500 |
$0.2800 |
$0.3200 |
$0.2000 |
|
| 9 | 168-6001 |
VEGETATIVE WATERING | 40.1 | MG |
$25.00 |
$90.00 |
$27.60 |
$100.00 |
|
| 10 | 169-6002 |
SOIL RETENTION BLANKETS (CL 1) (TY B) | 23,699 | SY |
$1.15 |
$1.25 |
$1.19 |
$1.78 |
|
| 11 | 247-6366 |
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) | 3,679 | CY |
$65.00 |
$91.00 |
$91.88 |
$67.00 |
|
| 12 | 310-6001 |
PRIME COAT (MULTI OPTION) | 3,063 | GAL |
$5.00 |
$10.00 |
$7.90 |
$4.25 |
|
| 13 | 351-6004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,500 | SY |
$75.00 |
$123.00 |
$71.50 |
$71.00 |
|
| 14 | 400-6005 |
CEM STABIL BKFL | 375 | CY |
$150.00 |
$180.00 |
$259.22 |
$225.00 |
|
| 15 | 400-6006 |
CUT & RESTORING PAV | 190 | SY |
$100.00 |
$60.00 |
$324.03 |
$225.00 |
|
| 16 | 401-6001 |
FLOWABLE BACKFILL | 21.6 | CY |
$250.00 |
$380.00 |
$299.19 |
$415.00 |
|
| 17 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 166 | LF |
$6.00 |
$25.00 |
$58.32 |
$15.50 |
|
| 18 | 403-6001 |
TEMPORARY SPL SHORING | 616 | SF |
$30.00 |
$30.00 |
$31.31 |
$45.00 |
|
| 19 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 100 | CY |
$300.00 |
$380.00 |
$238.25 |
$200.00 |
|
| 20 | 462-6006 |
CONC BOX CULV (5 FT X 2 FT) | 100 | LF |
$500.00 |
$885.00 |
$712.86 |
$668.00 |
|
| 21 | 462-6008 |
CONC BOX CULV (5 FT X 4 FT) | 50 | LF |
$900.00 |
$1,000.00 |
$863.01 |
$726.20 |
|
| 22 | 462-6063 |
CONC BOX CULV (8 FT X 4 FT)(EXTEND) | 22.1 | LF |
$1,500.00 |
$1,800.00 |
$3,332.14 |
$1,699.55 |
|
| 23 | 462-6099 |
CONC BOX CULV (6 FT X 2 FT) | 190 | LF |
$550.00 |
$820.00 |
$807.17 |
$726.20 |
|
| 24 | 464-6046 |
RC PIPE (ARCH)(CL IV)(DES 3) | 110 | LF |
$190.00 |
$245.00 |
$294.55 |
$288.00 |
|
| 25 | 464-6084 |
RC PIPE (ARCH)(CL IV)(DES 1) | 365 | LF |
$190.00 |
$205.00 |
$248.41 |
$298.00 |
|
| 26 | 466-6178 |
WINGWALL (PW - 1) (HW=3 FT) | 5 | EA |
$11,750.00 |
$16,000.00 |
$9,278.15 |
$8,430.00 |
|
| 27 | 466-6179 |
WINGWALL (PW - 1) (HW=4 FT) | 2 | EA |
$13,500.00 |
$27,000.00 |
$18,891.13 |
$19,537.50 |
|
| 28 | 466-6180 |
WINGWALL (PW - 1) (HW=5 FT) | 3 | EA |
$15,000.00 |
$30,000.00 |
$19,431.19 |
$23,542.50 |
|
| 29 | 466-6181 |
WINGWALL (PW - 1) (HW=6 FT) | 2 | EA |
$20,000.00 |
$40,000.00 |
$27,532.01 |
$27,690.00 |
|
| 30 | 467-6519 |
SET (TY II) (DES 1) (RCP) (6: 1) (P) | 14 | EA |
$1,900.00 |
$2,200.00 |
$2,545.82 |
$2,427.65 |
|
| 31 | 467-6545 |
SET (TY II) (DES 3) (RCP) (6: 1) (P) | 4 | EA |
$3,500.00 |
$3,200.00 |
$4,967.43 |
$5,702.75 |
|
| 32 | 496-6004 |
REMOV STR (SET) | 8 | EA |
$650.00 |
$700.00 |
$403.96 |
$525.00 |
|
| 33 | 496-6006 |
REMOV STR (HEADWALL) | 10 | EA |
$2,500.00 |
$750.00 |
$1,825.39 |
$1,250.00 |
|
| 34 | 496-6007 |
REMOV STR (PIPE) | 448 | LF |
$28.00 |
$20.00 |
$21.59 |
$37.00 |
|
| 35 | 496-6008 |
REMOV STR (BOX CULVERT) | 42 | LF |
$100.00 |
$130.00 |
$171.74 |
$125.00 |
|
| 36 | 496-6043 |
REMOV STR (SMALL FENCE) | 480 | LF |
$4.50 |
$6.00 |
$32.59 |
$10.00 |
|
| 37 | 500-6001 |
MOBILIZATION | 1 | LS |
$275,000.00 |
$290,000.00 |
$394,453.21 |
$330,000.00 |
|
| 38 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 | MO |
$6,000.00 |
$7,000.00 |
$9,500.00 |
$19,490.67 |
|
| 39 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 372 | LF |
$40.00 |
$43.00 |
$46.81 |
$44.00 |
|
| 40 | 506-6004 |
ROCK FILTER DAMS (INSTALL) (TY 4) | 495 | LF |
$46.00 |
$48.00 |
$55.34 |
$57.94 |
|
| 41 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 975 | LF |
$20.00 |
$6.00 |
$31.79 |
$18.00 |
|
| 42 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 78 | SY |
$25.00 |
$88.00 |
$52.06 |
$42.00 |
|
| 43 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 78 | SY |
$10.00 |
$8.00 |
$21.60 |
$18.75 |
|
| 44 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 4,710 | LF |
$4.00 |
$3.20 |
$4.32 |
$3.60 |
|
| 45 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 4,710 | LF |
$0.5000 |
$0.3000 |
$1.08 |
$0.5000 |
|
| 46 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 100 | LF |
$7.00 |
$11.50 |
$4.32 |
$8.00 |
|
| 47 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 100 | LF |
$2.00 |
$1.15 |
$1.08 |
$2.00 |
|
| 48 | 506-6053 |
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1) | 108 | LF |
$50.00 |
$73.00 |
$76.15 |
$57.00 |
|
| 49 | 530-6002 |
INTERSECTIONS (ACP) | 622 | SY |
$85.00 |
$100.00 |
$50.60 |
$238.55 |
|
| 50 | 530-6004 |
DRIVEWAYS (CONC) | 94 | SY |
$115.00 |
$178.00 |
$126.37 |
$112.42 |
|
| 51 | 530-6005 |
DRIVEWAYS (ACP) | 954 | SY |
$65.00 |
$90.00 |
$50.60 |
$187.10 |
|
| 52 | 530-6008 |
TURNOUTS (ACP) | 86 | SY |
$150.00 |
$200.00 |
$101.20 |
$308.60 |
|
| 53 | 552-6003 |
WIRE FENCE (TY C) | 480 | LF |
$23.00 |
$3.50 |
$54.01 |
$32.00 |
|
| 54 | 560-6011 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 4 | EA |
$350.00 |
$350.00 |
$372.64 |
$435.00 |
|
| 55 | 560-6013 |
MAILBOX INSTALL-M (TWW-POST) TY 4 | 2 | EA |
$950.00 |
$800.00 |
$664.27 |
$1,168.75 |
|
| 56 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 6 | EA |
$650.00 |
$775.00 |
$775.52 |
$1,085.00 |
|
| 57 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 2 | EA |
$800.00 |
$850.00 |
$856.53 |
$1,200.00 |
|
| 58 | 644-6076 |
REMOVE SM RD SN SUP&AM | 8 | EA |
$115.00 |
$35.00 |
$162.02 |
$125.00 |
|
| 59 | 658-6047 |
INSTL OM ASSM (OM-2Y)(WC)GND | 24 | EA |
$85.00 |
$90.00 |
$77.77 |
$115.00 |
|
| 60 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 14 | EA |
$25.00 |
$35.00 |
$16.20 |
$10.00 |
|
| 61 | 662-6063 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 36,100 | LF |
$0.8500 |
$0.5000 |
$0.4600 |
$0.4300 |
|
| 62 | 662-6095 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 36,100 | LF |
$0.8500 |
$0.5000 |
$0.4600 |
$0.4300 |
|
| 63 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 42 | LF |
$18.00 |
$17.00 |
$16.20 |
$15.00 |
|
| 64 | 666-6225 |
PAVEMENT SEALER 6" | 28,556 | LF |
$0.4000 |
$0.3100 |
$0.2900 |
$0.2700 |
|
| 65 | 666-6230 |
PAVEMENT SEALER 24" | 42 | LF |
$11.00 |
$5.25 |
$4.86 |
$4.50 |
|
| 66 | 666-6343 |
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) | 17,561 | LF |
$1.00 |
$1.40 |
$1.19 |
$1.10 |
|
| 67 | 666-6346 |
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL) | 2,170 | LF |
$1.20 |
$1.40 |
$1.24 |
$1.15 |
|
| 68 | 666-6347 |
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL) | 8,825 | LF |
$1.00 |
$1.40 |
$1.19 |
$1.10 |
|
| 69 | 672-6009 |
REFL PAV MRKR TY II-A-A | 175 | EA |
$10.00 |
$7.00 |
$5.78 |
$5.35 |
|
| 70 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 1,785 | LF |
$1.00 |
$2.85 |
$1.62 |
$1.50 |
|
| 71 | 3076-6001 |
D-GR HMA TY-B PG64-22 | 2,526 | TON |
$115.00 |
$125.00 |
$126.10 |
$114.25 |
|
| 72 | 3076-6048 |
D-GR HMA TY-D PG76-22 | 3,612 | TON |
$135.00 |
$136.00 |
$141.50 |
$119.00 |
|
| 73 | 3081-6008 |
TOM-C PG76-22 SAC-B | 1,840 | TON |
$165.00 |
$175.00 |
$165.70 |
$152.00 |
|
| 74 | 3084-6001 |
BONDING COURSE | 2,955 | GAL |
$5.00 |
$5.00 |
$4.09 |
$4.25 |
|
| 75 | 3085-6001 |
UNDERSEAL COURSE | 6,508 | GAL |
$5.00 |
$5.00 |
$5.74 |
$4.25 |
|
| 76 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$13,000.00 |
$14,000.00 |
$8,100.83 |
$0.0100 |
|
| 77 | 6185-6002 |
TMA (STATIONARY) | 220 | DAY |
$225.00 |
$125.00 |
$237.56 |
$0.0100 |
|
| 78 | 6185-6003 |
TMA (MOBILE OPERATION) | 256 | HR |
$80.00 |
$30.00 |
$135.01 |
$0.0100 |
|
| 79 | 7251-6001 |
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED) | 10 | EA |
$1,000.00 |
$2,000.00 |
$3,780.39 |
$1,500.00 |
|