| 1 | 100-6002 |
PREPARING ROW | 2 | STA |
$5,000.00 |
$2,500.00 |
$75,000.00 |
$30,000.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 481 | CY |
$19.60 |
$7.00 |
$70.00 |
$30.00 |
| 3 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 634 | CY |
$16.00 |
$35.00 |
$30.00 |
$55.00 |
| 4 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 819 | SY |
$0.2000 |
$1.30 |
$1.25 |
$2.50 |
| 5 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 819 | SY |
$0.2000 |
$1.30 |
$1.25 |
$2.50 |
| 6 | 164-6023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 1,637 | SY |
$3.00 |
$1.70 |
$1.55 |
$3.00 |
| 7 | 168-6001 |
VEGETATIVE WATERING | 33 | MG |
$20.00 |
$13.50 |
$74.42 |
$250.00 |
| 8 | 169-6003 |
SOIL RETENTION BLANKETS (CL 1) (TY C) | 328 | SY |
$3.00 |
$6.50 |
$5.75 |
$10.00 |
| 9 | 216-6001 |
PROOF ROLLING | 40 | HR |
$100.00 |
$84.00 |
$60.00 |
$125.00 |
| 10 | 260-6012 |
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) | 51 | TON |
$180.00 |
$190.00 |
$180.00 |
$300.00 |
| 11 | 260-6079 |
LIME TRT (SUBGRADE)(6") | 3,112 | SY |
$1.80 |
$5.50 |
$8.00 |
$22.00 |
| 12 | 340-6011 |
D-GR HMA(SQ) TY-B PG64-22 | 1,370 | TON |
$105.00 |
$100.00 |
$100.00 |
$200.00 |
| 13 | 340-6119 |
D-GR HMA(SQ) TY-D SAC-A PG70-22 | 257 | TON |
$107.00 |
$150.00 |
$150.00 |
$250.00 |
| 14 | 340-6272 |
TACK COAT | 374 | GAL |
$8.00 |
$2.60 |
$2.50 |
$15.00 |
| 15 | 400-6005 |
CEM STABIL BKFL | 92 | CY |
$90.00 |
$35.00 |
$110.00 |
$250.00 |
| 16 | 403-6001 |
TEMPORARY SPL SHORING | 687 | SF |
$28.00 |
$8.00 |
$30.00 |
$45.00 |
| 17 | 403-6006 |
TEMPORARY SPL SHORING (COFFERDAM) | 2,245 | SF |
$20.00 |
$2.00 |
$60.00 |
$75.00 |
| 18 | 409-6002 |
PRESTR CONC PIL (18 IN SQ) | 1,873 | LF |
$145.00 |
$115.00 |
$147.00 |
$150.00 |
| 19 | 420-6011 |
CL B CONC (FLUME) | 2.2 | CY |
$500.00 |
$1,200.00 |
$1,000.00 |
$1,600.00 |
| 20 | 420-6013 |
CL C CONC (ABUT) | 45.5 | CY |
$1,300.00 |
$700.00 |
$1,400.00 |
$2,600.00 |
| 21 | 422-6005 |
REINF CONC SLAB (BOX BEAM) | 2,569 | SF |
$12.00 |
$11.00 |
$30.00 |
$35.00 |
| 22 | 422-6015 |
APPROACH SLAB | 51.6 | CY |
$350.00 |
$730.00 |
$650.00 |
$900.00 |
| 23 | 422-6023 |
SHEAR KEY | 13.3 | CY |
$250.00 |
$590.00 |
$250.00 |
$650.00 |
| 24 | 423-6005 |
RETAINING WALL (SPREAD FOOTING) | 1,260 | SF |
$77.00 |
$88.00 |
$110.00 |
$190.00 |
| 25 | 425-6001 |
PRESTR CONC BOX BEAM (4B20) | 447 | LF |
$200.00 |
$165.00 |
$210.00 |
$330.00 |
| 26 | 425-6002 |
PRESTR CONC BOX BEAM (5B20) | 149 | LF |
$210.00 |
$165.00 |
$250.00 |
$330.00 |
| 27 | 432-6001 |
RIPRAP (CONC)(4 IN) | 1 | CY |
$600.00 |
$5,000.00 |
$1,500.00 |
$800.00 |
| 28 | 432-6024 |
RIPRAP (STONE COMMON)(DRY)(12 IN) | 227 | CY |
$170.00 |
$195.00 |
$180.00 |
$150.00 |
| 29 | 432-6026 |
RIPRAP (STONE COMMON)(DRY)(18 IN) | 190 | CY |
$140.00 |
$405.00 |
$180.00 |
$150.00 |
| 30 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 38 | CY |
$520.00 |
$842.00 |
$500.00 |
$650.00 |
| 31 | 450-6006 |
RAIL (TY T223) | 182 | LF |
$150.00 |
$190.00 |
$150.00 |
$180.00 |
| 32 | 454-6004 |
ARMOR JOINT (SEALED) | 61 | LF |
$120.00 |
$170.00 |
$130.00 |
$150.00 |
| 33 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$36,000.00 |
$30,000.00 |
$198,000.00 |
$65,000.00 |
| 34 | 500-6001 |
MOBILIZATION | 1 | LS |
$148,000.00 |
$159,000.00 |
$230,000.00 |
$275,000.00 |
| 35 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 | MO |
$5,000.00 |
$8,250.00 |
$19,000.00 |
$2,000.00 |
| 36 | 506-6034 |
CONSTRUCTION PERIMETER FENCE | 993 | LF |
$5.00 |
$1.00 |
$5.00 |
$8.00 |
| 37 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,480 | LF |
$3.00 |
$3.00 |
$2.75 |
$4.00 |
| 38 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,480 | LF |
$1.00 |
$0.8500 |
$0.7500 |
$1.00 |
| 39 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 11 | MO |
$3,000.00 |
$1,850.00 |
$4,000.00 |
$5,500.00 |
| 40 | 512-6001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 600 | LF |
$10.50 |
$150.00 |
$30.00 |
$90.00 |
| 41 | 512-6025 |
PORT CTB (MOVE)(SGL SLP)(TY 1) | 600 | LF |
$4.50 |
$5.00 |
$5.00 |
$20.00 |
| 42 | 512-6049 |
PORT CTB (REMOVE)(SGL SLP)(TY 1) | 600 | LF |
$5.40 |
$16.00 |
$15.00 |
$25.00 |
| 43 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 815 | LF |
$0.2000 |
$3.10 |
$1.00 |
$10.00 |
| 44 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 525 | LF |
$23.00 |
$33.00 |
$30.00 |
$32.00 |
| 45 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,050.00 |
$1,825.00 |
$1,950.00 |
$2,500.00 |
| 46 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 400 | LF |
$4.00 |
$6.00 |
$1.00 |
$5.00 |
| 47 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,700.00 |
$2,750.00 |
$3,500.00 |
$3,500.00 |
| 48 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 2 | EA |
$350.00 |
$305.00 |
$225.00 |
$350.00 |
| 49 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$1,950.00 |
$674.00 |
$1,000.00 |
$3,000.00 |
| 50 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$900.00 |
$674.00 |
$600.00 |
$3,000.00 |
| 51 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$9,000.00 |
$20,000.00 |
$9,150.00 |
$14,000.00 |
| 52 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 6 | EA |
$500.00 |
$360.00 |
$550.00 |
$800.00 |
| 53 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 2 | EA |
$790.00 |
$360.00 |
$650.00 |
$900.00 |
| 54 | 644-6076 |
REMOVE SM RD SN SUP&AM | 4 | EA |
$110.00 |
$310.00 |
$65.00 |
$150.00 |
| 55 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$17.00 |
$16.50 |
$25.00 |
$25.00 |
| 56 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 14 | EA |
$29.00 |
$16.50 |
$45.00 |
$35.00 |
| 57 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 994 | LF |
$0.3500 |
$0.5500 |
$0.5000 |
$3.50 |
| 58 | 662-6063 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 2,829 | LF |
$1.05 |
$1.55 |
$1.50 |
$2.00 |
| 59 | 662-6075 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 24 | LF |
$8.05 |
$10.50 |
$10.00 |
$25.00 |
| 60 | 662-6095 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 9,600 | LF |
$1.00 |
$1.55 |
$1.50 |
$1.30 |
| 61 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 78 | EA |
$1.40 |
$8.50 |
$1.00 |
$4.00 |
| 62 | 666-6224 |
PAVEMENT SEALER 4" | 260 | LF |
$0.3000 |
$0.2500 |
$0.2000 |
$1.30 |
| 63 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 2,380 | LF |
$0.3500 |
$0.5500 |
$0.5000 |
$1.30 |
| 64 | 666-6311 |
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) | 1,240 | LF |
$0.3500 |
$0.5500 |
$0.5000 |
$1.40 |
| 65 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 5,754 | LF |
$0.3000 |
$0.5500 |
$0.5000 |
$1.30 |
| 66 | 672-6009 |
REFL PAV MRKR TY II-A-A | 138 | EA |
$3.50 |
$5.15 |
$5.00 |
$10.00 |
| 67 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 6,958 | LF |
$0.5000 |
$0.5500 |
$0.5000 |
$0.7000 |
| 68 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 9,374 | LF |
$0.1000 |
$0.0500 |
$0.0100 |
$0.7000 |
| 69 | 5048-6002 |
FLOATING TURBIDITY BARRIER(FUR & INST) | 2,017 | LF |
$49.00 |
$3.40 |
$20.00 |
$10.00 |
| 70 | 5048-6003 |
FLOATING TURBIDITY BARRIER (REMOVE) | 2,017 | LF |
$14.00 |
$0.3000 |
$10.00 |
$1.00 |
| 71 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$6,000.00 |
$3,000.00 |
$21,000.00 |
| 72 | 6185-6002 |
TMA (STATIONARY) | 32 | DAY |
$1,000.00 |
$1,500.00 |
$500.00 |
$350.00 |
| 73 | 6185-6005 |
TMA (MOBILE OPERATION) | 2 | DAY |
$400.00 |
$4,000.00 |
$1,000.00 |
$450.00 |