| 1 | 100-7002 |
PREPARING ROW | 53 | STA |
$1,200.00 |
$134.00 |
$1,904.80 |
$2,500.00 |
$1,500.00 |
$1,000.00 |
$763.62 |
| 2 | 110-7001 |
EXCAV (ROADWAY) | 5,851 | CY |
$12.40 |
$4.00 |
$12.59 |
$26.90 |
$18.00 |
$10.00 |
$26.81 |
| 3 | 132-7006 |
EMBANK (FNL)(DC)(TY C) | 802 | CY |
$8.87 |
$18.00 |
$17.44 |
$3.00 |
$20.00 |
$15.00 |
$49.61 |
| 4 | 160-7007 |
FURN & PLACE TOPSOIL (VEH) | 100 | CY |
$50.53 |
$74.00 |
$63.96 |
$62.20 |
$30.00 |
$40.00 |
$62.29 |
| 5 | 164-7018 |
HYDRO MULCH SEED (PERM_RURAL_CLAY) | 15,031 | SY |
$0.4500 |
$0.6000 |
$0.5300 |
$0.5000 |
$1.00 |
$0.4600 |
$0.5200 |
| 6 | 164-7021 |
HYDRO MULCH SEED (TEMP_WARM) | 15,031 | SY |
$0.4500 |
$0.4000 |
$0.3500 |
$0.3000 |
$1.00 |
$0.3000 |
$0.3500 |
| 7 | 168-7001 |
VEGETATIVE WATERING | 96 | TGL |
$27.25 |
$29.00 |
$68.55 |
$55.50 |
$40.00 |
$40.00 |
$150.75 |
| 8 | 247-7277 |
FL BS (RDWY DEL)(TY E GR 4)(FNL POS) | 1,415 | CY |
$40.96 |
$70.00 |
$72.79 |
$59.30 |
$60.00 |
$75.00 |
$64.54 |
| 9 | 250-7002 |
GEOGRID BASE REINFORCEMENT (TYPE 2) | 16,048 | SY |
$1.27 |
$1.10 |
$1.66 |
$2.50 |
$3.00 |
$3.25 |
$2.29 |
| 10 | 260-7001 |
LIME (COM OR QK)(SLURRY) OR QK(DRY) | 49 | TON |
$521.86 |
$394.00 |
$336.06 |
$388.60 |
$450.00 |
$350.00 |
$324.49 |
| 11 | 260-7006 |
LIME TRT (EXIST MATL)(6") | 16,048 | SY |
$9.27 |
$2.17 |
$2.42 |
$3.50 |
$2.00 |
$5.00 |
$6.21 |
| 12 | 275-7001 |
CEMENT | 78 | TON |
$205.49 |
$226.00 |
$201.90 |
$254.10 |
$200.00 |
$200.00 |
$230.77 |
| 13 | 275-7006 |
CEMENT TRT (EXIST MATL & NEW BASE)(6") | 16,048 | SY |
$2.52 |
$1.01 |
$3.37 |
$6.40 |
$3.00 |
$5.00 |
$13.29 |
| 14 | 310-7001 |
PRIME COAT (AE-P) | 2,686 | GAL |
$8.83 |
$4.50 |
$5.60 |
$6.20 |
$10.00 |
$6.00 |
$19.82 |
| 15 | 341-7045 |
D-GR HMA TY-D SAC-B PG64-22 | 1,530 | TON |
$110.00 |
$118.00 |
$124.56 |
$152.70 |
$200.00 |
$210.00 |
$135.94 |
| 16 | 400-7005 |
STRUCT EXCAV (SPECIAL) | 5 | CY |
$73.50 |
$88.00 |
$150.00 |
$130.00 |
$150.00 |
$425.00 |
$174.32 |
| 17 | 400-7006 |
CUT & RESTORING PAV | 213 | SY |
$85.00 |
$30.00 |
$72.09 |
$100.00 |
$200.00 |
$180.00 |
$48.58 |
| 18 | 400-7010 |
CEM STABIL BKFL | 10 | CY |
$96.50 |
$88.00 |
$120.00 |
$195.00 |
$150.00 |
$200.00 |
$311.16 |
| 19 | 402-7001 |
TRENCH EXCAVATION PROTECTION | 61 | LF |
$2.71 |
$4.50 |
$10.00 |
$1.00 |
$20.00 |
$5.00 |
$116.50 |
| 20 | 464-7003 |
RC PIPE (CL III)(18 IN) | 1,219 | LF |
$118.23 |
$96.00 |
$71.37 |
$128.00 |
$140.00 |
$145.13 |
$111.66 |
| 21 | 464-7005 |
RC PIPE (CL III)(24 IN) | 32 | LF |
$97.66 |
$110.00 |
$83.65 |
$140.00 |
$150.00 |
$272.21 |
$171.54 |
| 22 | 464-7032 |
RC PIPE (CL V)(18 IN) | 180 | LF |
$130.62 |
$109.00 |
$85.62 |
$170.00 |
$150.00 |
$290.42 |
$144.58 |
| 23 | 465-7126 |
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) | 4 | EA |
|
$5,500.00 |
$6,488.05 |
$7,000.00 |
$7,000.00 |
$7,369.63 |
$8,801.02 |
| 24 | 467-7305 |
SET (TY II) (18 IN) (RCP) (3: 1) (C) | 10 | EA |
$1,796.91 |
$970.00 |
$1,684.64 |
$1,100.00 |
$1,500.00 |
$3,074.28 |
$3,890.95 |
| 25 | 467-7307 |
SET (TY II) (18 IN) (RCP) (6: 1) (C) | 4 | EA |
$1,900.00 |
$1,042.00 |
$1,415.01 |
$1,390.00 |
$2,000.00 |
$3,667.33 |
$3,890.95 |
| 26 | 467-7308 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 68 | EA |
$1,579.72 |
$1,042.00 |
$1,415.00 |
$1,390.00 |
$1,500.00 |
$1,883.90 |
$2,920.37 |
| 27 | 467-7325 |
SET (TY II) (24 IN) (RCP) (3: 1) (C) | 2 | EA |
$2,600.00 |
$1,300.00 |
$1,784.96 |
$1,300.00 |
$2,000.00 |
$3,930.60 |
$4,107.38 |
| 28 | 496-7004 |
REMOV STR (SET) | 2 | EA |
$561.88 |
$288.00 |
$882.78 |
$600.00 |
$1,000.00 |
$750.00 |
$949.96 |
| 29 | 496-7007 |
REMOV STR (PIPE) | 780 | LF |
$13.88 |
$20.50 |
$23.60 |
$20.00 |
$10.00 |
$40.00 |
$31.73 |
| 30 | 500-7001 |
MOBILIZATION | 1 | LS |
$99,101.58 |
$100,000.00 |
$276,568.43 |
$135,000.00 |
$175,000.00 |
$200,000.00 |
$195,360.80 |
| 31 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$4,000.00 |
$2,051.00 |
$6,468.74 |
$6,009.90 |
$6,000.00 |
$3,904.95 |
$9,742.50 |
| 32 | 505-7001 |
TMA (STATIONARY) | 10 | DAY |
$45.00 |
$97.00 |
$552.81 |
$629.60 |
$500.00 |
$268.53 |
$820.81 |
| 33 | 506-7002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 13 | LF |
|
$393.00 |
$359.33 |
$310.00 |
$100.00 |
$310.00 |
$351.81 |
| 34 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 13 | LF |
|
$213.00 |
$193.48 |
$170.00 |
$50.00 |
$170.00 |
$189.44 |
| 35 | 506-7021 |
CONSTRUCTION EXITS (INSTALL) (TY 2) | 858 | SY |
$28.05 |
$12.00 |
$28.75 |
$30.20 |
$30.00 |
$60.61 |
$20.05 |
| 36 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 858 | SY |
$8.92 |
$6.00 |
$12.19 |
$18.00 |
$10.00 |
$30.54 |
$4.14 |
| 37 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 707 | LF |
$6.05 |
$6.00 |
$5.25 |
$4.70 |
$10.00 |
$4.65 |
$5.14 |
| 38 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 707 | LF |
$2.25 |
$3.00 |
$2.49 |
$2.20 |
$3.00 |
$2.15 |
$2.44 |
| 39 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 120 | LF |
|
$10.00 |
$8.84 |
$10.80 |
$8.00 |
$10.75 |
$8.66 |
| 40 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 120 | LF |
|
$5.00 |
$4.42 |
$5.90 |
$3.00 |
$5.90 |
$4.33 |
| 41 | 530-7010 |
DRIVEWAYS (ACP) | 1,347 | SY |
$69.75 |
$27.00 |
$52.49 |
$94.00 |
$80.00 |
$140.44 |
$97.50 |
| 42 | 560-7008 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 17 | EA |
$267.11 |
$393.00 |
$374.19 |
$325.00 |
$250.00 |
$525.00 |
$568.31 |
| 43 | 644-7025 |
IN SM RD SN SUP&AM TYS80(1)SA(P) | 7 | EA |
$926.71 |
$1,026.00 |
$978.65 |
$850.00 |
$1,200.00 |
$985.00 |
$1,173.39 |
| 44 | 644-7026 |
IN SM RD SN SUP&AM TYS80(1)SA(P-BM) | 4 | EA |
$857.43 |
$1,147.00 |
$1,093.79 |
$950.00 |
$1,200.00 |
$1,200.00 |
$1,369.95 |
| 45 | 644-7028 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 1 | EA |
$1,046.32 |
$1,237.00 |
$1,180.14 |
$1,025.00 |
$1,200.00 |
$1,600.00 |
$1,173.39 |
| 46 | 644-7073 |
REMOVE SM RD SN SUP&AM | 6 | EA |
$124.15 |
$302.00 |
$287.84 |
$250.00 |
$850.00 |
$150.00 |
$827.93 |
| 47 | 658-7059 |
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) | 6 | EA |
$90.20 |
$67.00 |
$63.33 |
$55.00 |
$1,000.00 |
$150.00 |
$59.56 |
| 48 | 666-7036 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 71 | LF |
$8.86 |
$18.00 |
$19.90 |
$14.80 |
$8.00 |
$16.08 |
$19.49 |
| 49 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 10,176 | LF |
$0.8400 |
$1.25 |
$0.9300 |
$1.00 |
$1.50 |
$1.03 |
$0.9100 |
| 50 | 666-7420 |
REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | 770 | LF |
$0.6600 |
$1.50 |
$2.76 |
$1.20 |
$1.50 |
$1.30 |
$2.71 |
| 51 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 4,314 | LF |
$0.8500 |
$1.25 |
$1.38 |
$1.00 |
$1.50 |
$1.03 |
$1.35 |
| 52 | 672-7004 |
REFL PAV MRKR TY II-A-A | 84 | EA |
$6.68 |
$8.00 |
$27.64 |
$5.80 |
$15.00 |
$6.30 |
$27.06 |
| 1 | 100-7002 |
PREPARING ROW | 28 | STA |
$1,200.00 |
|
|
|
|
|
|
| 2 | 110-7001 |
EXCAV (ROADWAY) | 1,960 | CY |
$12.40 |
|
|
|
|
|
|
| 3 | 132-7006 |
EMBANK (FNL)(DC)(TY C) | 353 | CY |
$8.87 |
|
|
|
|
|
|
| 4 | 160-7007 |
FURN & PLACE TOPSOIL (VEH) | 50 | CY |
$50.53 |
|
|
|
|
|
|
| 5 | 164-7018 |
HYDRO MULCH SEED (PERM_RURAL_CLAY) | 5,390 | SY |
$0.4500 |
|
|
|
|
|
|
| 6 | 164-7021 |
HYDRO MULCH SEED (TEMP_WARM) | 5,390 | SY |
$0.4500 |
|
|
|
|
|
|
| 7 | 168-7001 |
VEGETATIVE WATERING | 48 | TGL |
$27.25 |
|
|
|
|
|
|
| 8 | 247-7277 |
FL BS (RDWY DEL)(TY E GR 4)(FNL POS) | 830 | CY |
$40.96 |
|
|
|
|
|
|
| 9 | 250-7002 |
GEOGRID BASE REINFORCEMENT (TYPE 2) | 8,222 | SY |
$1.27 |
|
|
|
|
|
|
| 10 | 260-7001 |
LIME (COM OR QK)(SLURRY) OR QK(DRY) | 24 | TON |
$521.86 |
|
|
|
|
|
|
| 11 | 260-7006 |
LIME TRT (EXIST MATL)(6") | 8,222 | SY |
$9.27 |
|
|
|
|
|
|
| 12 | 275-7001 |
CEMENT | 44 | TON |
$205.49 |
|
|
|
|
|
|
| 13 | 275-7006 |
CEMENT TRT (EXIST MATL & NEW BASE)(6") | 8,222 | SY |
$2.52 |
|
|
|
|
|
|
| 14 | 310-7001 |
PRIME COAT (AE-P) | 1,389 | GAL |
$8.83 |
|
|
|
|
|
|
| 15 | 341-7045 |
D-GR HMA TY-D SAC-B PG64-22 | 791 | TON |
$110.00 |
|
|
|
|
|
|
| 17 | 400-7006 |
CUT & RESTORING PAV | 74 | SY |
$85.00 |
|
|
|
|
|
|
| 20 | 464-7003 |
RC PIPE (CL III)(18 IN) | 483 | LF |
$118.23 |
|
|
|
|
|
|
| 23 | 465-7126 |
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) | 4 | EA |
$4,800.00 |
|
|
|
|
|
|
| 25 | 467-7307 |
SET (TY II) (18 IN) (RCP) (6: 1) (C) | 2 | EA |
$1,900.00 |
|
|
|
|
|
|
| 26 | 467-7308 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 16 | EA |
$1,579.72 |
|
|
|
|
|
|
| 29 | 496-7007 |
REMOV STR (PIPE) | 139 | LF |
$13.88 |
|
|
|
|
|
|
| 31 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$4,000.00 |
|
|
|
|
|
|
| 33 | 506-7002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 13 | LF |
$120.00 |
|
|
|
|
|
|
| 34 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 13 | LF |
$37.00 |
|
|
|
|
|
|
| 35 | 506-7021 |
CONSTRUCTION EXITS (INSTALL) (TY 2) | 312 | SY |
$28.05 |
|
|
|
|
|
|
| 36 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 312 | SY |
$8.92 |
|
|
|
|
|
|
| 37 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 215 | LF |
$6.05 |
|
|
|
|
|
|
| 38 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 215 | LF |
$2.25 |
|
|
|
|
|
|
| 39 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 120 | LF |
$4.62 |
|
|
|
|
|
|
| 40 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 120 | LF |
$1.27 |
|
|
|
|
|
|
| 41 | 530-7010 |
DRIVEWAYS (ACP) | 148 | SY |
$69.75 |
|
|
|
|
|
|
| 42 | 560-7008 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 1 | EA |
$267.11 |
|
|
|
|
|
|
| 43 | 644-7025 |
IN SM RD SN SUP&AM TYS80(1)SA(P) | 4 | EA |
$926.71 |
|
|
|
|
|
|
| 44 | 644-7026 |
IN SM RD SN SUP&AM TYS80(1)SA(P-BM) | 1 | EA |
$857.43 |
|
|
|
|
|
|
| 46 | 644-7073 |
REMOVE SM RD SN SUP&AM | 1 | EA |
$124.15 |
|
|
|
|
|
|
| 48 | 666-7036 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 28 | LF |
$8.86 |
|
|
|
|
|
|
| 49 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 5,422 | LF |
$0.8400 |
|
|
|
|
|
|
| 50 | 666-7420 |
REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | 560 | LF |
$0.6600 |
|
|
|
|
|
|
| 51 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 1,026 | LF |
$0.8500 |
|
|
|
|
|
|
| 52 | 672-7004 |
REFL PAV MRKR TY II-A-A | 30 | EA |
$6.68 |
|
|
|
|
|
|