| 1 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 104 | CY |
$20.00 |
$50.00 |
| 2 | 168-6001 |
VEGETATIVE WATERING | 146 | MG |
$25.00 |
$1.00 |
| 3 | 192-6003 |
PLANT MATERIAL (3-GAL) | 674 | EA |
$20.00 |
$30.00 |
| 4 | 192-6013 |
MULCH | 200 | SY |
$5.00 |
$20.00 |
| 5 | 192-6014 |
PLANT SOIL MIX | 68 | CY |
$40.00 |
$60.00 |
| 6 | 193-6001 |
PLANT MAINTENANCE | 9 | MO |
$500.00 |
$1,000.00 |
| 7 | 432-6003 |
RIPRAP (CONC)(6 IN) | 2.1 | CY |
$600.00 |
$1,000.00 |
| 8 | 500-6001 |
MOBILIZATION | 1 | LS |
$17,300.00 |
$35,000.00 |
| 9 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$5,000.00 |
$2,000.00 |
| 10 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 300 | LF |
$5.00 |
$7.00 |
| 11 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 300 | LF |
$2.00 |
$1.00 |
| 12 | 618-6016 |
CONDT (PVC) (SCH 40) (1") | 125 | LF |
$13.30 |
$5.00 |
| 13 | 618-6017 |
CONDT (PVC) (SCH 40) (1") (BORE) | 75 | LF |
$13.72 |
$1.00 |
| 14 | 620-6005 |
ELEC CONDR (NO.10) BARE | 200 | LF |
$1.10 |
$5.00 |
| 15 | 620-6006 |
ELEC CONDR (NO.10) INSULATED | 400 | LF |
$1.10 |
$5.00 |
| 16 | 624-6002 |
GROUND BOX TY A (122311)W/APRON | 3 | EA |
$984.59 |
$1,000.00 |
| 17 | 740-6004 |
ANTI - GRAFFITI COATING(PERMNENT-TY II) | 276 | SF |
$2.00 |
$5.00 |
| 18 | 1002-6002 |
LANDSCAPE AMENITY (TY 1) | 3 | EA |
$31,000.00 |
$40,000.00 |
| 19 | 1002-6003 |
LANDSCAPE AMENITY (TY 2) | 6 | EA |
$1,500.00 |
$2,500.00 |
| 20 | 1002-6004 |
LANDSCAPE AMENITY (TY 3) | 3 | EA |
$2,000.00 |
$5,000.00 |
| 21 | 6063-6007 |
SPS-INS (40W) 960W (500AH) 2X50A(1) | 3 | EA |
$7,000.00 |
$2,000.00 |
| 22 | 6185-6002 |
TMA (STATIONARY) | 25 | DAY |
$225.00 |
$1.00 |