| 1 | 100-6002 |
PREPARING ROW | 4 | STA |
$2,500.00 |
$10,000.00 |
$10,000.00 |
$3,346.00 |
|
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 408 | CY |
$20.00 |
$30.00 |
$20.00 |
$30.00 |
|
| 3 | 110-6002 |
EXCAVATION (CHANNEL) | 955 | CY |
$25.00 |
$25.00 |
$20.00 |
$33.00 |
|
| 4 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 277 | CY |
$30.00 |
$5.50 |
$20.00 |
$48.00 |
|
| 5 | 164-6033 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 813 | SY |
$1.00 |
$5.10 |
$2.00 |
$4.00 |
|
| 6 | 216-6001 |
PROOF ROLLING | 10 | HR |
$150.00 |
$500.00 |
$85.00 |
$223.00 |
|
| 7 | 247-6344 |
FL BS (CMP IN PLACE)(TY D GR 4)(12") | 1,008 | SY |
$30.00 |
$25.00 |
$50.00 |
$41.00 |
|
| 8 | 314-6013 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 106 | GAL |
$10.00 |
$10.00 |
$10.00 |
$22.00 |
|
| 9 | 400-6005 |
CEM STABIL BKFL | 28 | CY |
$300.00 |
$650.00 |
$300.00 |
$680.00 |
|
| 10 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 61 | LF |
$20.00 |
$250.00 |
$10.00 |
$8.00 |
|
| 11 | 403-6006 |
TEMPORARY SPL SHORING (COFFERDAM) | 1,700 | SF |
$30.00 |
$5.00 |
$5.00 |
$24.00 |
|
| 12 | 450-6006 |
RAIL (TY T223) | 202 | LF |
$150.00 |
$250.00 |
$175.00 |
$259.00 |
|
| 13 | 459-6008 |
GABION MATTRESSES (GALV)(18 IN) | 610 | SY |
$250.00 |
$55.00 |
$125.00 |
$165.00 |
|
| 14 | 459-6009 |
GABIONS (3' X 3')(GALV) | 180 | CY |
$250.00 |
$100.00 |
$200.00 |
$256.00 |
|
| 15 | 462-6034 |
CONC BOX CULV (10 FT X 10 FT) | 152.5 | LF |
$1,500.00 |
$850.00 |
$1,600.00 |
$1,590.00 |
|
| 16 | 466-6173 |
WINGWALL (PW - 1) (HW=12 FT) | 2 | EA |
$70,000.00 |
$35,000.00 |
$60,000.00 |
$47,553.00 |
|
| 17 | 480-6001 |
CLEAN EXIST CULVERTS | 1 | EA |
$2,500.00 |
$5,000.00 |
$2,500.00 |
$13,385.00 |
|
| 18 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$25,000.00 |
$222,700.00 |
$25,000.00 |
$52,426.00 |
|
| 19 | 500-6001 |
MOBILIZATION | 1 | LS |
$87,000.00 |
$75,000.00 |
$90,000.00 |
$96,309.00 |
|
| 20 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$1,500.00 |
$1,000.00 |
$2,000.00 |
$779.00 |
|
| 21 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 222 | SY |
$30.00 |
$50.00 |
$30.00 |
$28.00 |
|
| 22 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 222 | SY |
$10.00 |
$10.00 |
$10.00 |
$6.00 |
|
| 23 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,000 | LF |
$5.00 |
$5.00 |
$5.00 |
$4.00 |
|
| 24 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 500 | LF |
$1.00 |
$5.00 |
$1.00 |
$1.00 |
|
| 25 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,200 | LF |
$10.00 |
$5.00 |
$8.00 |
$2.00 |
|
| 26 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 600 | LF |
$1.00 |
$5.00 |
$1.00 |
$1.00 |
|
| 27 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 50 | LF |
$40.00 |
$125.00 |
$40.00 |
$57.00 |
|
| 28 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 4 | EA |
$1,500.00 |
$3,500.00 |
$2,500.00 |
$1,160.00 |
|
| 29 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,000.00 |
$4,000.00 |
$3,500.00 |
$2,219.00 |
|
| 30 | 552-6001 |
WIRE FENCE (TY A) | 298 | LF |
$20.00 |
$25.00 |
$19.50 |
$20.00 |
|
| 31 | 644-6076 |
REMOVE SM RD SN SUP&AM | 4 | EA |
$100.00 |
$550.00 |
$50.00 |
$335.00 |
|
| 32 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$50.00 |
$25.00 |
$21.00 |
$70.00 |
|
| 33 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 12 | EA |
$50.00 |
$25.00 |
$21.00 |
$82.00 |
|
| 34 | 734-6002 |
LITTER REMOVAL | 2 | CYC |
$1,000.00 |
$1,000.00 |
$500.00 |
$1,115.00 |
|
| 35 | 4171-6001 |
INSTALL BRIDGE IDENTIFICATION NUMBERS | 1 | EA |
$250.00 |
$250.00 |
$2,000.00 |
$726.00 |
|
| 36 | 6185-6002 |
TMA (STATIONARY) | 126 | DAY |
$250.00 |
$10.00 |
$50.00 |
$167.00 |
|