Bid tab 0902-90-132

Let Jun 27, 2023 · Fort Worth · Tarrant Sign up free

‹ Jun 2023 results

BRIDGE REPLACEMENT

Let date
Tuesday, June 27, 2023
CCSJ
0902-90-132
District
Fort Worth
County
Tarrant
Highway
CS
Limits
JACKSON DRIVE to AT LITTLE BEAR CREEK
Classification
Construction
Project number
BR 2021(146)
Working days
128

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,077,525
1 HARPER BROTHERS CONSTRUCTION LLC Low bidder $1,754,000 -15.6%
2 RAGLE CONSTRUCTION, INC. $1,859,371 -10.5% +6.0%
3 MCMAHON CONTRACTING AND CONSTRUCTION, LLC $1,864,329 -10.3% +6.3%
4 ED BELL CONSTRUCTION COMPANY $1,895,975 -8.7% +8.1%
5 JAGOE-PUBLIC COMPANY $2,144,852 +3.2% +22.3%

Bid tab: unit prices 55 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HARPER BROTHERS…#2 RAGLE CONSTRUCT…#3 MCMAHON CONTRAC…#4 ED BELL CONSTRU…#5 JAGOE-PUBLIC CO…
1100-6002 PREPARING ROW5.44STA $15,000.00 $31,000.00 $32,000.00 $7,308.67 $33,000.00 $30,000.00
2110-6001 EXCAVATION (ROADWAY)1,015CY $45.00 $25.00 $44.00 $49.63 $40.00 $65.00
3132-6008 EMBANKMENT (FINAL)(DENS CONT)(TY D)980CY $25.00 $35.00 $40.00 $19.32 $40.00 $55.00
4161-6017 COMPOST MANUF TOPSOIL (4")2,093SY $4.00 $9.00 $4.60 $8.69 $10.00 $12.50
5164-6001 BROADCAST SEED (PERM) (RURAL) (SANDY)2,093SY $4.00 $1.20 $0.2000 $1.43 $5.25 $1.50
6164-6029 CELL FBR MLCH SEED(TEMP)(WARM)1,047SY $2.00 $2.35 $0.7500 $2.80 $0.7500 $3.00
7164-6031 CELL FBR MLCH SEED(TEMP)(COOL)1,047SY $2.00 $2.35 $0.7500 $2.80 $0.7600 $3.00
8168-6001 VEGETATIVE WATERING73MG $100.00 $65.00 $85.00 $136.85 $105.00 $140.00
9169-6006 SOIL RETENTION BLANKETS (CL 2) (TY F)483SY $5.00 $7.75 $1.50 $9.22 $2.00 $11.00
10247-6236 FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)217CY $150.00 $125.00 $110.00 $150.10 $150.00 $200.00
11260-6002 LIME (HYDRATED LIME (SLURRY))5TON $500.00 $500.00 $424.51 $535.50 $600.00 $300.00
12260-6017 LIME TRT(MIX EXST MATL & NEW BASE)(8")280SY $12.00 $100.00 $42.00 $36.23 $40.00 $35.00
13305-6004 SALV, HAUL & STKPL RCL APH PV (4 TO 6")926SY $15.00 $18.00 $13.00 $14.88 $15.00 $15.00
14310-6001 PRIME COAT (MULTI OPTION)215GAL $15.00 $8.50 $14.43 $10.12 $10.00 $5.00
15400-6005 CEM STABIL BKFL177CY $230.00 $240.00 $140.00 $221.21 $300.00 $340.00
16416-6004 DRILL SHAFT (36 IN)360LF $260.00 $420.00 $415.00 $492.87 $350.00 $450.00
17420-6014 CL C CONC (ABUT)(HPC)55.2CY $1,200.00 $2,500.00 $840.00 $1,294.12 $2,500.00 $2,500.00
18422-6002 REINF CONC SLAB (HPC)4,640SF $30.00 $10.00 $26.00 $34.37 $18.00 $20.00
19422-6016 APPROACH SLAB (HPC)70.6CY $1,400.00 $1,000.00 $631.00 $785.24 $1,000.00 $1,400.00
20425-6035 PRESTR CONC GIRDER (TX28)636LF $265.00 $325.00 $263.00 $243.80 $350.00 $280.00
21432-6031 RIPRAP (STONE PROTECTION)(12 IN)1,365CY $280.00 $134.00 $140.00 $157.37 $200.00 $260.00
22432-6046 RIPRAP (MOW STRIP)(5 IN)18CY $1,000.00 $1,000.00 $675.00 $725.26 $800.00 $1,400.00
23442-6007 STR STEEL (MISC NON - BRIDGE)271LB $30.00 $22.00 $30.00 $19.18 $30.00 $23.75
24450-6033 RAIL (TY C223)(HPC)240LF $250.00 $195.00 $205.00 $218.58 $300.00 $290.00
25450-6103 RAIL (TY PR11)204LF $150.00 $120.00 $125.00 $133.26 $175.00 $130.00
26454-6020 SEALED EXPANSION JOINT (4 IN) (SEJ - B)67LF $150.00 $150.00 $142.00 $179.25 $150.00 $150.00
27479-6004 ADJUSTING MANHOLES (SANITARY)3EA $2,200.00 $15,000.00 $1,350.00 $3,156.60 $3,000.00 $5,100.00
28496-6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH)1EA $90,000.00 $60,000.00 $190,000.00 $35,322.23 $50,000.00 $65,000.00
29500-6001 MOBILIZATION1LS $188,862.00 $165,084.25 $190,000.00 $307,158.80 $179,000.00 $200,000.00
30502-6001 BARRICADES, SIGNS AND TRAFFIC HANDLING6MO $15,000.00 $5,100.00 $25,000.00 $3,515.35 $9,000.00 $10,000.00
31506-6001 ROCK FILTER DAMS (INSTALL) (TY 1)275LF $40.00 $40.35 $24.00 $48.02 $40.00 $57.00
32506-6011 ROCK FILTER DAMS (REMOVE)275LF $20.00 $25.00 $10.00 $29.75 $15.00 $35.00
33506-6020 CONSTRUCTION EXITS (INSTALL) (TY 1)225SY $45.00 $42.70 $28.00 $50.81 $12.00 $25.00
34506-6024 CONSTRUCTION EXITS (REMOVE)225SY $15.00 $25.00 $9.50 $29.75 $6.00 $10.00
35506-6038 TEMP SEDMT CONT FENCE (INSTALL)915LF $5.00 $3.90 $2.75 $4.64 $3.00 $5.50
36506-6039 TEMP SEDMT CONT FENCE (REMOVE)915LF $2.00 $1.35 $0.7500 $1.61 $1.00 $1.90
37540-6001 MTL W-BEAM GD FEN (TIM POST)100LF $35.00 $28.00 $30.00 $33.32 $22.55 $28.00
38540-6007 MTL BEAM GD FEN TRANS (TL2)4EA $1,000.00 $1,430.00 $900.00 $1,701.70 $2,456.59 $1,300.00
39540-6016 DOWNSTREAM ANCHOR TERMINAL SECTION2EA $1,500.00 $1,790.00 $1,350.00 $2,130.10 $1,100.00 $1,400.00
40540-6033 MTL BM GD FEN (LONG SPAN SYSTEM)1EA $2,000.00 $1,100.00 $1,500.00 $1,309.00 $1,375.00 $30.00
41544-6001 GUARDRAIL END TREATMENT (INSTALL)2EA $4,000.00 $3,450.00 $3,000.00 $4,105.50 $3,052.50 $4,000.00
42644-6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P)2EA $1,050.00 $1,300.00 $700.00 $779.45 $852.50 $1,100.00
43658-6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)6EA $40.00 $44.00 $35.00 $35.70 $22.00 $28.00
44658-6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)12EA $40.00 $50.00 $35.00 $35.70 $27.50 $35.00
45666-6174 REFL PAV MRK TY II (W) 6" (SLD)830LF $1.00 $3.00 $1.40 $3.57 $1.54 $2.00
46666-6210 REFL PAV MRK TY II (Y) 6" (SLD)830LF $1.00 $3.00 $1.40 $3.57 $1.54 $2.00
47666-6225 PAVEMENT SEALER 6"1,660LF $1.00 $1.00 $0.7500 $1.19 $0.8300 $1.50
48672-6009 REFL PAV MRKR TY II-A-A11EA $6.00 $50.00 $7.00 $59.50 $7.70 $11.00
49678-6002 PAV SURF PREP FOR MRK (6")480LF $1.00 $1.00 $0.7500 $1.19 $0.8300 $1.50
50678-6033 PAV SURF PREP FOR MRK (RPM)11EA $1.50 $20.00 $2.00 $23.80 $2.20 $1.50
513076-6003 D-GR HMA TY-B PG64-22 (EXEMPT)176TON $250.00 $146.00 $171.09 $173.74 $176.00 $140.00
523076-6038 D-GR HMA TY-D PG64-22 (LEVEL-UP)60TON $200.00 $100.00 $168.00 $119.00 $110.00 $140.00
533076-6066 TACK COAT207GAL $14.00 $7.00 $3.09 $8.33 $8.00 $2.50
543077-6027 SP MIXES SP-C SAC-A PG70-28114TON $250.00 $195.00 $204.07 $232.05 $225.00 $220.00
556001-6001 PORTABLE CHANGEABLE MESSAGE SIGN788DAY $250.00 $58.00 $50.00 $190.40 $21.00 $65.00